To: dvdw© who wrote (1254 ) 7/5/2015 10:55:10 AM From: dvdw© Read Replies (1) | Respond to of 1580 This is an HM4E Input variable with significant potential. Enjoy. Home Lucid Energy LucidPipe™ Power System Opportunity News Info Sheets Contact LucidPipe™ Power System [iframe width="550" height="350" src="http://www.youtube.com/embed/XDKTXvreGo8" frameborder="0" allowfullscreen="" style="margin: 0px; padding: 0px; outline: 0px; vertical-align: baseline;"][/iframe]Produce Clean, Low-Cost Energy From Your Pipelines The LucidPipe™ Power System harnesses the untapped energy potential of moving water to produce clean, low-cost electricity. Driven by the demand for reliable, cost-effective electricity, water- and energy-intensive industries, municipalities and agricultural irrigation districts worldwide can deploy our in-pipe hydropower system to generate millions of megawatt hours of renewable electricity from the water already flowing through their pipelines – without interrupting flow. LucidPipe can operate across a wide range of flow conditions, volumes and velocities. The unique lift-based vertical axis spherical turbine design generates electricity by extracting excess head pressure from large diameter (24”-96”), gravity-fed water pipelines and effluent streams. To maximize electricity generation, several LucidPipe systems can be rapidly and easily installed into a single pipeline,* allowing operations to continue normally. The amount of electricity generated is a function of the rate of flow and the pressure inside the transmission pipe. For example, in a standard 60-inch-diameter pipeline, with flow velocity of seven feet per second and 92.3 ft of head (40 psi) of excess head pressure, a single LucidPipe unit could produce up to 100kW of power while extracting about 11.5 ft of head (5 PSI) from the system. Adding multiple turbines in a pipeline with these characteristics has the potential to generate thousands of megawatt hours of renewable energy without environmental impact.* LucidPipe systems can be deployed 3-4 turbine diameters apart, so up to four LucidPipe units can be installed in a standard 40-foot section of pipe. One mile of 42” diameter pipeline could produce as much as 3 megawatts or more of electricity. Download our Product Information PDF. Download our Technical FAQ. HOW IT WORKS CENTER OF EXCELLENCE INFO SHEETS Contact LucidPipe™ Power System Opportunity Partners Copyright Lucid Energy 2011 Site Design by Topaz Design Google+