We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Orbital science (ORB) -- Ignore unavailable to you. Want to Upgrade?


To: dwight martin who wrote (633)12/24/1997 12:49:00 PM
From: RP Svoboda  Read Replies (1) | Respond to of 2394
 
It depends on the complexity of the sub-systems, but I will make large generalizations.

Launch is done in phases. First the sats are placed in their proper positions. Then they are "turned on" for that all important first communication with the ground controllers. Depending on the design, the critical systems are checked to ensure that they are operating properly. This should take about 24 hours.

Then, the sat is stabilized, unfolded and oriented properly (if this was not automatically done during placement into the orbit).
Next, a very detailed "inspection" is initiated to ensure the sats health and proper orbit. As everything checks out, the sat will slowly be brought to complete operational status (one sub-system at a time). This phase will take 90 days or so.

Imagine breaking in a new car. You want to ensure everything works properly before you red-line it at the race track. Hope this helps.

Thanks.
Boda