We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : The Financial Collapse of 2001 Unwinding -- Ignore unavailable to you. Want to Upgrade?


To: elmatador who wrote (2244)4/1/2019 12:38:51 PM
From: Elroy Jetson2 Recommendations

Recommended By
Cogito Ergo Sum
elmatador

  Read Replies (1) | Respond to of 13781
 
It's widely accepted that public 240-Volt Level 2 charging stations are not likely to recapture the cost of their installation, maintenance, and electricity use through fees paid by drivers who use them to recharge.
The article you posted from 2016 doesn't explain why car chargers are unlikely to "capture their own cost". But this one from January 2018 does. It's an artificial problem.
.

Steep utility fees are killing electric-car charging stations - greenbiz.com
Demand charges are responsible for as much as 90 percent of a public charging station’s monthly utility bill.
High utility fees are a major hurdle to electric vehicles and the commercial charging stations that serve them.

Despite the success of General Motors’ all-electric Chevy Bolt and widespread anticipation of Tesla’s forthcoming Model 3 electric sedan, public electric-vehicle (EV) charging stations that can recharge a car battery in 15 minutes or less are hard to come by.

A major buildout of fast-charging stations likely would help drive greater adoption of electric vehicles, experts say. But it’s extremely difficult for public charging stations to turn a profit because of volatile fees, called demand charges, that many electric utilities charge their commercial customers.

Demand charges are special fees that utilities charge commercial customers, on top of the rates they charge for actual power usage, that correspond to the highest level of electricity the customer uses during a 15-minute period within each billing month. Demand charges vary, according to the time of day, and are highest during times of peak power demand, usually weekdays from late afternoon until late evening.

These fees are responsible for as much as 90 percent of a public charging station’s monthly utility bill, according to the Rocky Mountain Institute (RMI).

The operation of EV service stations that offer fast charging is at odds with electricity rate structures that were designed to keep the flow of electrons on the grid steady, and were not designed to cater to businesses that regularly use spurts of electricity. As a result, conventional utility rate structures often create a barrier to the operation of these service stations, said Chris Nelder, a manager with RMI’s electricity practice."Good rate design has to do with performance-based regulation," he said. "If you want good outcomes, then it really starts with rates."

Utility rates and tariffs don’t simply determine what electric vehicle drivers pay to fill up the tank, but they determine charging station operators’ profits or losses. Profitable charging stations, with reasonable utility costs, can expand and drive a greater buildout of vehicle charging infrastructure. But charging stations that lose money, or have costs that fluctuate wildly, are less likely to stay in business.

The demand charge issue is more prevalent at fast-charging stations that are "high power, low utilization," or that don’t have high volumes of vehicles charging frequently.

For charging stations that are starting out and not yet getting a lot of regular business, utility demand fees can be a real hardship.

"This was really an unintended consequence of a conventional rate design meeting a spiky load, because utilization rates on the chargers are low," Nelder said.
This was an unintended consequence of a conventional rate design meeting a spiky load.
The charging-station owner may eat the entire cost of utility demand charges, without passing the extra costs on to customers. Or in other cases, drivers may end up footing a portion of the fee.Charging-station operator EVgo, for example, charges customers set fees for charging their car batteries, rather than tying the price to the actual cost, which can fluctuate. But this doesn’t always work.

In a 2017 study (PDF) of charging-station economics that RMI produced with EVgo, they found that one EVgo charger generated a monthly utility bill of $1,938, of which $1,362 were demand charges.

The report concludes that utilities should design rates for charging stations that do not include demand charges, or at least have limited demand charges that are specific to the utility’s costs of providing power to the station. Low fixed charges and time-of-use charges would ensure that the utility could recover all its costs of serving the charging station, and that the station would not be overburdened with high costs. The stations, in turn, charge customers time-of-use prices so they can generate more revenue to ensure they cover all their costs.

Some utility regulators are taking notice of the mismatch between utility rate structures and charging-station economics. In California, the nation’s largest EV market, state regulators asked two utilities, Southern California Edison and San Diego Gas & Electric, to design new rates for EV charging stations.

Some utility regulators are taking notice of the mismatch between utility rate structures and charging-station economics.
Other utilities in California and other states also should design special rates for EV service stations to improve the economics for this emerging, RMI’s study concluded. Without changes to utility rate structures, the business case for public charging stations likely will remain weak.Some utilities have gone into the EV charging business themselves, as part of efforts to drive EV adoption. Austin Energy in Texas, for example, offers customers who own an EV an initially discounted program of $4.17 a month for unlimited charging at any of its public charging stations. In addition, through Austin Energy rebates, customers can get discounts on 240-volt charging stations they can install in their homes, which recharge car batteries faster than an ordinary 110-volt outlet found in most homes.

Utilities that adjust their rates to empower public charging stations will reap the benefits in the form of increased power demand, said Brendan Jordan, vice president of the Great Plains Institute.

"Electric vehicle revenues will be great for utilities and will exceed the cost to serve them," he said. "They will help on the curtailment on renewables. The benefits of EVs will exceed the costs once they scale up and put downward pressure on rates."

In Massachusetts, lawmakers are working on pilot rate structures that will be more supportive of electric vehicle charging. One proposal would require Massachusetts utilities to design commercial tariffs that feature alternative rate structures that would dampen the impact of demand charges on EV charging stations.

EV sales in the United States are likely to grow to as much as 800,000 a year by 2021, with Tesla selling 250,000 of those, according to a forecast by UBS.

As government policies and consumer preferences drive greater adoption of EVs, utilities will have to actively partake in charging station rollouts and improve their rate designs to avoid a shortfall in public charging infrastructure.



To: elmatador who wrote (2244)4/1/2019 1:03:55 PM
From: Elroy Jetson1 Recommendation

Recommended By
elmatador

  Read Replies (1) | Respond to of 13781
 
As the preceding article notes, most of the "electric bill" paid by a privately-owned stand-alone car charger are "peak demand charges" with the cost of electricity being a small percentage of the total bill.

As a result, most car charging stations have been installed by major electrical customers like cities.

Because the spike in demand caused by car chargers is a small percentage of a large customer's total electrical usage so any increase in peak demand charges is small. Large customers with a demand spike problem can greatly reduce their bills with battery storage, but this is a very small part of their total infrastructure cost.

For a stand-alone car charging business . . .
Demand charges are responsible for as much as 90 percent of a public charging station’s monthly utility bill.
. . . and adding on the huge battery infrastructure that would be needed to balance out the demand for chargers alone would be cost prohibitive.

Utilities don't bill themselves for "peak demand charges" so, apart from cities, utilities were on track to become the monopoly owner of car chargers.

So until utility regulators decide what to do about "peak demand charges" privately-owned charging stations are not going to exist. This is what the 2016 article was really all about.

The even earlier editorial in the Los Angeles Times the article cited misunderstood the entire debate taking place at the time. To create private charging center the editorial proposed would require the elimination of "Demand Charges". Without the elimination of these charges, car charger will be owned primarily by utilities.
.

The infrastructure installation charges of bringing electrical power lines to each customer varies hugely from a simple drop line charge to hundreds of thousands of Dollars for a new substation to supply a large customer depending on the location. A market dictated by these charges would see car chargers installed not where they're needed, but where existing power lines make infrastructure charges affordable.

This doesn't make sense as a matter of public policy, so the PUC has authorized infrastructure investment programs to make the cost of each car charging station the same, regardless of location, with additional subsidies for lower income neighborhoods where charging stations would not otherwise be built.



To: elmatador who wrote (2244)4/2/2019 7:57:08 AM
From: Cogito Ergo Sum  Respond to of 13781
 
There are charging stations all over Toronto Some stores/locaions like HD (Example) have cut back on them.. due to lack of use.. E cars not ready for Canada weather.. nor US Maine.. Vermont.. Minnesota etc etc.. Hybrid E cars OK...

Nice thing about IC engines in cold climates is that all that waste heat is no longer waste energy in cold times...

E car proponents thought process too simplistic.. I would love an E car.. but I would need live elsewhere..