We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Formerly About Advanced Micro Devices -- Ignore unavailable to you. Want to Upgrade?


To: ryanaka who wrote (1169170)10/7/2019 6:33:07 PM
From: Wharf Rat  Read Replies (2) | Respond to of 1572105
 
They say that when the people lead, the leaders will follow,
=
4 Takeaways From Amazon’s Huge Electric Delivery Van Order
Will 100,000 plugged-in delivery vans break the grid? No, but the Amazon-Rivian deal does pose questions for utilities.

” Even if this scenario were to occur, an additional 2 gigawatts during peak periods would not create significant strain on wholesale markets across the U.S., especially as these vehicles would likely do most of their charging at night, when wind power is more abundant and power demand is typically at its lowest.

Yet while the wholesale market can accommodate 2 gigawatts of additional demand, even a fraction of that demand could exceed the local capacity available to individual sites (i.e., the distribution grid near fleet depots). Increased demand at depot facilities could necessitate extensive electrical service upgrades for the local network.

The severity of this challenge could range from a head-scratcher — a warehouse next to a underloaded substation taking on 10 vehicles (or 200 kilowatts of potential demand) — to a migraine — a fulfillment center in an urban center requiring 200 vehicles or 4 megawatts of worst-case scenario load in an already-congested location.”

greentechmedia.com