SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (140795)3/25/2020 5:58:35 PM
From: LoneClone  Read Replies (1) | Respond to of 194787
 
Cyprium Metals (ASX:CYM) Eelya South Drilling Results and Continuing Programmes

abnnewswire.net

WWW: www.cypriummetals.com Company Overview

Perth, Mar 25, 2020 AEST (ABN Newswire) - Cyprium Metals Limited ( ASX:CYM) is pleased to advise of the results of further Reverse Circulation ("RC") drilling that was completed to the end of February 2020 at the Eelya South prospect (refer to Table 1*), which returned an intersection 3.0m @ 3.78% Cu in drill hole 20ESRC014, that also included 6.68 g/t Au and 81.0 g/t Ag from 59m (refer to Figures 1 and 2*).

HIGHLIGHTS

Eelya South Drilling Highlights:

- 3.0m @ 3.78% Cu, 6.68 g/t Au & 81.0 g/t Ag in drill hole 20ESRC014 with from 59m

- 2.0m @ 10.12% Cu, 3.19 g/t Au & 92.0 g/t Ag in drill hole ERC19 with from 40m

Note: Rounding applied to the grades

This high-grade copper/gold southern Eelya South intersection in drill hole 20ESRC014 was drilled to test a structure, previously identified at Eelya South in the 1990's which returned an intersection of 2.0m @ 10.12% Cu, 3.19 g/t Au and 92.0 g/t Ag from 40m in drillhole ERC19 (refer to Figure 2*). These high-grade copper/gold drilling intersections are located less than 1 kilometre to the south of the surface sampling programme that was previously announced on 4 November 2019. The follow up RC drilling as outlined in Figure 2* at the prospective Eelya South tenement area is underway and will be completed by the end of March 2020.

Executive Director Barry Cahill commented "We are very pleased with the drilling programme at Eelya South, in particular with the 3 metres at 3.78% copper intersection result whilst testing drilling targets in an area that previously been subject to very limited drilling activities.

These shallow high-grade copper intersection results from the very prospective Eelya South prospect are within 6 kilometres of the Hollandaire copper deposits meaning the deposits are well within economic trucking distances of each other. We are continuing our drilling activities which are focused on expanding the mineralised copper footprint at the Cue Copper Project to bring us closer to the critical mass required to advance this project to a developmental stage.

We look forward to updating the market with the results of the current drilling programmes once the results have been received."

Earn-in and Joint Venture

Pursuant to an agreement between a wholly owned subsidiary of CYM and Musgrave Minerals Limited ( ASX:MGV), an option has been granted by Musgrave Minerals Limited to earn-in and joint venture for an 80% interest in the non-gold rights over the tenements at the Cue Copper Project (CYM ASX Release 25 March 2019).

*To view tables and figures, please visit:
abnnewswire.net

About Cyprium Metals Ltd

Cyprium Metals Limited (ASX:CYM) is poised to grow to a mid-tier mining business and manage a portfolio of Australian copper projects to deliver vital natural resources, strong shareholder returns and sustainable value for our stakeholders. We pursue this aim, in genuine partnerships with employees, customers, shareholders, local communities and other stakeholders, which is based on integrity, co-operation, transparency and mutual value creation.





Contact

Cyprium Metals Ltd
T: +61 8 6169 3050
WWW: www.cypriummetals.com

Link: EELYA SOUTH DRILLING RESULTS & CONTINUING PROGRAMMES






Related Companies

Musgrave Minerals Ltd
Cyprium Metals Ltd