SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (161843)12/7/2021 12:07:36 PM
From: LoneClone  Read Replies (1) | Respond to of 192641
 
Bam Bam Completes 2021 Drill Program at Majuba Hill Project in Nevada

newsfilecorp.com

Vancouver, British Columbia--(Newsfile Corp. - December 6, 2021) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to report that the 2021 core and reverse-circulation ("RC") drill program is complete for the Majuba Hill Project in Pershing County Nevada. 2021 Drilling focused on three areas:

  • Majuba Known Copper Oxide
  • Copper-Gold Target (New Porphyry Discovery-BBR News Nov. 8, 2021)
  • DeSoto Copper Oxide Target


  • Sixteen holes were drilled for a total of 4,539.5 meters (14,893.5 feet).



    Figure 1

    To view an enhanced version of Figure 1, please visit:
    orders.newsfilecorp.com

    All RC and core samples have been processed and delivered to the ALS Sample Prep Facilities in Reno and Elko, Nevada. Assay results will be reported when they are complete.

    David Greenway, President and CEO, commented: "I am pleased with the 2021 drilling program. The visual results we were able to report from the core in the Copper-Gold Discovery area is very exciting for the development of a significant copper porphyry deposit at Majuba Hill."

    HoleTargetTypeAzimuthAngleLength (m)Length (ft)
    MHB-10Known OxideRC0-90257.6845
    MHB-11Known OxideRC0-70152.4500
    MHB-12Known OxideRC0-45213.4700
    MHB-13Known OxideRC0-90208.8685
    MHB-14Known OxideRC0-90356.61170
    MHB-15Known OxideRC0-90304.81000
    MHB-16Known OxideRC0-90196.3644
    MHB-17Known OxideRC0-90243.8800
    MHB-18Known OxideRC0-90243.8800
    MHB-19Known OxideRC110-4554.9180
    MHB-20Copper-GoldCore10-70310.01017
    MHB-21Known OxideRC252-80454.21490
    MHB-22Copper-GoldCore140-60549.41802.5
    MHB-23Known OxideRC0-90304.81000
    MHB-24Known OxideRC90-45243.8800
    MHB-25DeSotoRC0-90140.2460
    MHB-26DeSotoRC0-90304.81000


    Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

    The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

    Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps.

    Qualified Person

    The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

    About Bam Bam Resources Corp.

    Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

    The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

    Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

    On Behalf of the Board of Bam Bam Resources Corp.

    "David Greenway"

    David C. Greenway
    President & CEO

    For further information, please contact:
    Joel Warawa
    VP of Corporate Communications
    E: jw@bambamresources.com
    P: 1 (855) 475-0745

    Forward-Looking Statements

    This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.