We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (161878)12/7/2021 2:40:33 PM
From: LoneClone  Read Replies (1) | Respond to of 192834
 
Osisko Development Intersects 12.60 g/t Au Over 10.15 Meters, Including 97.80 g/t Au Over 0.50 Meter and 102.00 g/t Au Over 0.50 Meter on Island Mountain Shaft Zone

ca.finance.yahoo.com

Osisko Development Corp
Tue., December 7, 2021, 5:38 a.m.·26 min read

Figure 1: Cariboo deposit areas overview map



Figure 1: Cariboo deposit areas overview map
Figure 1: Cariboo deposit areas overview mapFigure 2: Mosquito Detail Map



Figure 2: Mosquito Detail Map
Figure 2: Mosquito Detail MapFigure 3: Shaft Zone select drilling highlights



Figure 3: Shaft Zone select drilling highlights

MONTREAL, Dec. 07, 2021 (GLOBE NEWSWIRE) -- Osisko Development Corp. (“Osisko Development” or the “Company”) (TSX.V-ODV) is pleased to announce drilling results from the 2021 exploration and category conversion drill program campaign at its Cariboo Gold Project (“Cariboo”) in central British Columbia.

Summary

  • A total of 152,000 meters were drilled at the Cariboo Gold Project in 2021. Drilling is now complete for the year.

  • Recent assay results include holes IM-21-102 to IM-21-154 from Mosquito and Shaft Zones on Island Mountain (Figure 1). Nine of these holes test both the Shaft and Valley deposits (Table 1 and Figure 3).

  • IM-21-109 intersected 21.33 g/t Au over 5.80 meters including a sample of 117.00 g/t Au over 0.95 meter at Shaft Zone.

  • IM-21-126 intersected multiple mineralized vein corridors including 8.90 g/t Au over 8.80 meters, 15.99 g/t Au over 4.10 meters and one of the deepest intercepts to date of 34.50 g/t Au over 1.40 meters at a depth of 803.30 meters (vertical depth of 630.00 meters) and extending several vein corridors down dip.

  • IM-21-145 intersected 12.60 g/t Au over 10.15 meters including samples of 97.80 g/t Au over 0.50 meters and 102.00 g/t Au over 0.50 meter increasing confidence within a mineralized vein corridor.

  • Detailed drilling results and a drill hole location plan map are presented at the end of this release.

  • Assay Highlights

  • 6.69 g/t Au over 6.60 meters in hole IM-21-103

  • 38.74 g/t Au over 1.10 meters in hole IM-21-103 including

  • 81.90 g/t Au over 0.50 meter

  • 10.29 g/t Au over 3.90 meters in hole IM-21-104 including

  • 61.50 g/t Au over 0.50 meter

  • 22.20 g/t Au over 1.50 meters in hole IM-21-104

  • 4.37 g/t Au over 9.20 meters in hole IM-21-108

  • 21.33 g/t Au over 5.80 meters in hole IM-21-109 including

  • 117.00 g/t Au over 0.95 meter

  • 20.49 g/t Au over 2.20 meters in hole IM-21-111 including

  • 53.70 g/t Au over 0.60 meter

  • 42.40 g/t Au over 0.50 meter in hole IM-21-113

  • 35.94 g/t Au over 1.10 meters in hole IM-21-114

  • 64.90 g/t Au over 0.55 meter in hole IM-21-114

  • 41.40 g/t Au over 0.50 meter in hole IM-21-114

  • 32.34 g/t Au over 1.05 meters in hole IM-21-114 including

  • 65.30 g/t Au over 0.50 meter

  • 56.80 g/t Au over 0.50 meter in hole IM-21-119

  • 39.60 g/t Au over 1.00 meter in hole IM-21-123 including

  • 60.70 g/t Au over 0.50 meter

  • 6.20 g/t Au over 4.95 meters in hole IM-21-123

  • 10.54 g/t Au over 5.95 meters in hole IM-21-125

  • 8.90 g/t Au over 8.80 meters in hole IM-21-126 including

  • 38.40 g/t Au over 0.70 meter

  • 15.99 g/t Au over 4.10 meters in hole IM-21-126 including

  • 40.40 g/t Au over 0.90 meter and

  • 35.70 g/t Au over 0.80 meter

  • 34.50 g/t Au over 1.40 meters in hole IM-21-126

  • 19.43 g/t Au over 5.00 meters in hole IM-21-128 including

  • 71.60 g/t Au over 0.50 meter and

  • 42.10 g/t Au over 0.75 meter

  • 51.30 g/t Au over 0.60 meter in hole IM-21-132

  • 7.14 g/t Au over 5.85 meters in hole IM-21-134 including

  • 64.20 g/t Au over 0.50 meter

  • 9.74 g/t Au over 3.45 meters in hole IM-21-135

  • 10.12 g/t Au over 4.50 meters in hole IM-21-139 including

  • 33.60 g/t Au over 1.10 meters

  • 59.10 g/t Au over 0.50 meter in hole IM-21-140

  • 5.61 g/t Au over 10.70 meters in hole IM-21-140 including

  • 40.20 g/t Au over 1.40 meters

  • 12.18 g/t Au over 5.75 meters in hole IM-21-141

  • 31.07 g/t Au over 1.65 meters in hole IM-21-144 including

  • 55.40 g/t Au over 0.50 meter

  • 19.35 g/t Au over 3.55 meters in hole IM-21-144 including

  • 34.90 g/t Au over 0.85 meter and

  • 41.30 g/t Au over 0.80 meter

  • 6.63 g/t Au over 6.85 meters in hole IM-21-144 including

  • 27.50 g/t Au over 1.30 meters

  • 12.60 g/t Au over 10.15 meters in hole IM-21-145 including

  • 97.80 g/t Au over 0.50 meter and

  • 102.00 g/t Au over 0.50 meter

  • 9.37 g/t Au over 6.90 meters in hole IM-21-146

  • 16.27 g/t Au over 4.45 meters in hole IM-21-151 including

  • 31.50 g/t Au over 1.30 meters

  • 10.17 g/t Au over 4.20 meters in hole IM-21-151

  • Chris Lodder, President of Osisko Development commented, “We have now completed our exploration and delineation drill program for 2021. We have received the majority of the assay results to be modelled in the mineral resource and to support the completion of the feasibility study to advance our project. These recent results from 53 holes will add confidence to the model and generate further exploration targets.”

    Vein corridors are defined as a high-density network of mineralized quartz veins within the axis of the last folding event and hosted within a brittle meta-sandstone or calcareous meta-sandstone. Vein corridors are modelled at a minimum thickness of 2 meters and average about 4.5 meters true width. Individual mineralized veins within these corridors have widths varying from centimeters to several meters and strike lengths from a few meters to over 50 meters. These corridors have been defined from surface to a vertical depth averaging 300 meters and remain open for expansion at depth and along strike. Gold grades are intimately associated with quartz vein-hosted pyrite as well as pyritic, intensely silicified wall rock haloes in close proximity to the veins.

    True widths are estimated to be 60% to 75% of reported core length intervals. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays. Complete assay highlights are presented in Table 1, drill hole locations are listed in Table 2.

    Qualified Persons

    Per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration of Osisko Development Corp., is a Qualified Person and has prepared, validated, and approved the technical and scientific content of this news release.

    Quality Assurance – Quality Control

    Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at a secured facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd.

    Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

    About Osisko Development Corp.

    Osisko Development Corp. is uniquely positioned as a premier gold development company in North America to advance the Cariboo Gold Project and other Canadian and Mexican properties, with the objective of becoming the next mid-tier gold producer. The Cariboo Gold Project, located in central British Columbia, is Osisko Development's flagship asset with measured and indicated resources of 21.44 Mt at 4.6 Au g/t for a total of 3.2 million ounces of gold and inferred resource of 21.69 Mt at 3.9 Au g/t for a total of 2.7 million ounces of gold (see NI 43-101 Technical Report and mineral resource estimate effective October 5th, 2020). The considerable exploration potential at depth and along strike distinguishes the Cariboo Gold Project relative to other development assets as does the historically low, all-in discovery costs of US $19 per ounce. The Cariboo Gold Project is advancing through permitting as a 4,750 tonnes per day underground operation with a feasibility study on track for completion in the first half of 2022. Osisko Development's project pipeline is complemented by potential near-term production targeted from the San Antonio gold project, located in Sonora Mexico and early exploration stage properties including the Coulon Project and James Bay Properties located in Québec as well as the Guerrero Properties located in Mexico. Osisko Development began trading on the TSX Venture Exchange under the symbol “ODV” on December 2, 2020 and the Company’s 14,789,373 outstanding share purchase warrants were listed on the TSX Venture Exchange under the symbol “ODV.WT” on October 25, 2021.

    For further information, please contact Osisko Development Corp.:

    Jean Francois Lemonde
    VP Investor Relations
    jflemonde@osiskodev.com
    Tel: 514-299-4926

    Forward-looking Statements

    Certain statements contained in this press release may be deemed “forward-looking statements” within the meaning of applicable Canadian and U.S. securities laws. These forward-looking statements, by their nature, require Osisko Development to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Forward-looking statements are not guarantees of performance. Words such as “may”, “will”, “would”, “could”, “expect”, “believe”, “plan”, “anticipate”, “intend”, “estimate”, “continue”, or the negative or comparable terminology, as well as terms usually used in the future and the conditional, are intended to identify forward-looking statements. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including management’s perceptions of historical trends, current conditions and expected future developments, results of further exploration work to define and expand mineral resources, expected conclusions of optimization studies, that vein corridors continue to be defined as a high-density network of mineralized quartz within the axis of the last folding event and hosted within the sandstones and that the deposit remains open for expansion at depth and down plunge, as well as other considerations that are believed to be appropriate in the circumstances. Osisko Development considers its assumptions to be reasonable based on information currently available, but cautions the reader that their assumptions regarding future events, many of which are beyond the control of Osisko Development, may ultimately prove to be incorrect since they are subject to risks and uncertainties that affect Osisko Development and its business. Such risks and uncertainties include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management’s geological modelling; the ability of to complete further exploration activities, including drilling; property and royalty interests in the Cariboo gold deposit; the ability of the Corporation to obtain required approvals; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions and the responses of relevant governments to the COVID-19 outbreak and the effectiveness of such responses.

    For additional information with respect to these and other factors and assumptions underlying the forward- looking statements made in this news release concerning Osisko Development, see the Filing Statement available electronically on SEDAR (www.sedar.com) under Osisko Development's issuer profile. The forward-looking statements set forth herein concerning Osisko Development reflect management's expectations as at the date of this news release and are subject to change after such date. Osisko Development disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, other than as required by law.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

    Table 1: Cariboo Gold Project 2021 Length Weighted Drill Hole Gold Composites

    HOLE ID


    FROM M

    TO (M)

    LENGTH (M)

    AU (G/T)

    TARGET

    IM-21-102


    17.00

    18.00

    1.00

    3.96

    Shaft

    IM-21-103


    44.00

    47.90

    3.90

    3.36

    Mosquito


    Including

    46.85

    47.90

    1.05

    7.05




    83.40

    90.00

    6.60

    6.69



    Including

    83.40

    83.90

    0.50

    50.10



    and

    88.30

    89.00

    0.70

    10.80



    and

    89.00

    90.00

    1.00

    11.35




    103.70

    104.80

    1.10

    38.74



    Including

    104.30

    104.80

    0.50

    81.90




    119.80

    120.30

    0.50

    5.46




    124.90

    125.40

    0.50

    4.97




    164.00

    165.70

    1.70

    12.93



    Including

    164.00

    164.70

    0.70

    30.60


    IM-21-104


    238.00

    241.90

    3.90

    10.29

    Shaft


    Including

    238.50

    239.00

    0.50

    61.50



    and

    241.00

    241.90

    0.90

    8.40




    255.00

    255.60

    0.60

    36.40




    332.80

    333.90

    1.10

    3.70




    346.00

    346.90

    0.90

    12.55




    425.00

    426.50

    1.50

    22.20


    IM-21-105


    84.00

    84.70

    0.70

    3.87

    Shaft

    IM-21-106


    204.45

    205.05

    0.60

    3.02

    Shaft

    IM-21-107


    46.00

    46.50

    0.50

    8.56

    Shaft



    54.75

    55.25

    0.50

    5.83




    64.60

    65.30

    0.70

    4.23




    108.00

    108.90

    0.90

    12.75


    IM-21-108


    181.45

    184.55

    3.10

    3.35

    Shaft



    201.60

    202.10

    0.50

    9.81




    300.70

    301.25

    0.55

    3.35




    314.50

    315.00

    0.50

    4.32




    337.60

    338.15

    0.55

    3.44




    339.00

    339.50

    0.50

    3.64




    386.50

    387.00

    0.50

    5.93

    Valley



    398.80

    408.00

    9.20

    4.37



    Including

    398.80

    399.35

    0.55

    18.60



    and

    402.15

    402.65

    0.50

    13.15



    and

    407.30

    408.00

    0.70

    23.00




    417.35

    418.10

    0.75

    11.45




    421.90

    422.50

    0.60

    9.48


    IM-21-109


    113.80

    114.30

    0.50

    3.32

    Shaft



    143.50

    149.30

    5.80

    21.33



    Including

    143.50

    144.00

    0.50

    22.60



    and

    148.35

    149.30

    0.95

    117.00


    IM-21-110


    39.90

    41.10

    1.20

    6.50

    Shaft



    46.00

    46.50

    0.50

    17.70




    70.50

    72.55

    2.05

    7.58



    Including

    70.50

    71.30

    0.80

    15.75


    IM-21-111


    122.70

    124.90

    2.20

    20.49

    Shaft


    Including

    124.30

    124.90

    0.60

    53.70




    222.70

    224.00

    1.30

    3.69


    IM-21-112


    38.10

    38.90

    0.80

    16.30

    Shaft

    IM-21-113


    69.30

    71.10

    1.80

    4.79

    Shaft


    Including

    69.30

    70.05

    0.75

    5.99




    289.75

    291.90

    2.15

    5.86



    Including

    289.75

    290.50

    0.75

    15.00




    296.25

    298.00

    1.75

    9.26



    Including

    297.50

    298.00

    0.50

    19.55




    311.15

    311.65

    0.50

    42.40




    336.00

    336.80

    0.80

    7.67




    441.60

    445.95

    4.35

    3.36



    Including

    444.40

    445.10

    0.70

    15.50


    IM-21-114


    17.00

    17.50

    0.50

    4.92

    Shaft



    21.15

    22.00

    0.85

    3.43




    37.60

    38.70

    1.10

    35.94




    58.90

    59.45

    0.55

    64.90




    65.15

    65.70

    0.55

    4.73




    77.50

    78.00

    0.50

    6.79




    103.15

    103.90

    0.75

    25.60




    108.00

    108.50

    0.50

    41.40




    115.10

    116.15

    1.05

    32.34



    Including

    115.10

    115.60

    0.50

    65.30


    IM-21-115

    No Significant Assays





    Shaft

    IM-21-116


    112.85

    114.15

    1.30

    3.10

    Shaft



    121.60

    122.10

    0.50

    10.20




    204.40

    205.90

    1.50

    14.06



    Including

    205.00

    205.90

    0.90

    18.05


    IM-21-118


    88.65

    89.30

    0.65

    4.41

    Shaft



    297.25

    297.75

    0.50

    12.35




    302.00

    306.50

    4.50

    3.81



    Including

    302.00

    302.50

    0.50

    17.45




    396.95

    397.45

    0.50

    3.01

    Valley



    444.50

    445.25

    0.75

    6.62




    452.00

    452.50

    0.50

    7.36


    IM-21-119


    113.20

    114.10

    0.90

    10.55

    Shaft



    129.80

    130.35

    0.55

    13.45




    154.50

    155.00

    0.50

    56.80


    IM-21-120


    88.20

    88.70

    0.50

    28.70

    Shaft



    235.80

    236.30

    0.50

    24.90




    253.50

    254.25

    0.75

    11.75




    285.00

    286.00

    1.00

    4.52




    302.05

    302.55

    0.50

    3.02




    518.90

    519.50

    0.60

    8.49




    523.20

    524.00

    0.80

    5.76




    579.25

    580.40

    1.15

    14.55




    584.50

    585.00

    0.50

    8.81




    631.30

    631.80

    0.50

    5.30




    657.25

    658.10

    0.85

    4.80


    IM-21-121


    116.60

    117.60

    1.00

    8.55

    Shaft


    Including

    116.60

    117.10

    0.50

    10.35


    IM-21-122


    123.80

    125.50

    1.70

    13.13

    Shaft


    Including

    124.40

    125.50

    1.10

    18.75


    IM-21-123


    63.00

    64.00

    1.00

    39.60

    Shaft


    Including

    63.50

    64.00

    0.50

    60.70




    151.10

    156.05

    4.95

    6.20



    Including

    153.10

    153.60

    0.50

    18.05



    and

    155.40

    156.05

    0.65

    12.40



    and

    155.40

    156.05

    0.65

    12.40


    IM-21-124

    No Significant Assays





    Shaft

    IM-21-125


    71.45

    72.95

    1.50

    5.56

    Shaft



    272.05

    274.10

    2.05

    8.48




    344.30

    345.00

    0.70

    13.60




    384.25

    390.20

    5.95

    10.54

    Valley


    Including

    386.50

    387.20

    0.70

    16.80



    and

    387.20

    387.70

    0.50

    19.75



    and

    389.70

    390.20

    0.50

    20.50




    396.65

    398.70

    2.05

    6.59



    Including

    398.20

    398.70

    0.50

    21.30




    409.55

    410.20

    0.65

    7.62




    415.40

    419.25

    3.85

    4.57



    Including

    415.40

    416.30

    0.90

    9.14



    and

    416.30

    417.20

    0.90

    8.36




    424.60

    429.80

    5.20

    3.87



    Including

    426.20

    427.35

    1.15

    10.40




    437.15

    438.10

    0.95

    4.24


    IM-21-126


    425.90

    434.70

    8.80

    8.90

    Shaft


    Including

    426.45

    426.95

    0.50

    11.55



    and

    426.95

    427.80

    0.85

    10.45



    and

    432.60

    433.10

    0.50

    15.20



    and

    433.10

    433.80

    0.70

    38.40



    and

    433.80

    434.70

    0.90

    16.90




    473.15

    475.15

    2.00

    10.19



    Including

    474.00

    475.15

    1.15

    14.75




    488.50

    489.00

    0.50

    7.52




    490.05

    490.55

    0.50

    3.52




    555.55

    556.05

    0.50

    7.90




    567.90

    569.00

    1.10

    7.12




    572.25

    573.05

    0.80

    21.60




    580.90

    585.00

    4.10

    15.99



    Including

    580.90

    581.80

    0.90

    40.40



    and

    584.20

    585.00

    0.80

    35.70




    653.55

    654.15

    0.60

    3.56




    685.90

    686.70

    0.80

    6.83




    745.30

    745.85

    0.55

    7.39




    787.25

    791.00

    3.75

    4.85



    Including

    787.25

    787.75

    0.50

    20.90




    803.30

    804.70

    1.40

    34.50




    820.90

    822.65

    1.75

    14.70



    Including

    820.90

    821.50

    0.60

    19.80



    and

    821.50

    822.00

    0.50

    20.10




    828.20

    831.25

    3.05

    7.69



    Including

    829.50

    830.50

    1.00

    20.00




    849.70

    850.20

    0.50

    12.10




    911.85

    913.25

    1.40

    4.15




    930.80

    931.30

    0.50

    5.10




    933.50

    934.55

    1.05

    6.19


    IM-21-127


    119.25

    120.30

    1.05

    3.26

    Shaft



    156.50

    157.60

    1.10

    4.05


    IM-21-128


    30.50

    32.00

    1.50

    24.86

    Shaft


    Including

    30.50

    31.00

    0.50

    35.10



    and

    31.50

    32.00

    0.50

    39.40




    49.00

    54.00

    5.00

    19.43



    Including

    49.50

    50.00

    0.50

    27.00



    and

    50.00

    50.50

    0.50

    71.60



    and

    50.50

    51.00

    0.50

    14.90



    and

    51.00

    51.75

    0.75

    42.10




    86.90

    87.60

    0.70

    11.20




    208.70

    212.50

    3.80

    7.88



    Including

    209.40

    210.15

    0.75

    28.20




    224.30

    224.80

    0.50

    14.35




    243.50

    244.50

    1.00

    6.33




    251.50

    252.40

    0.90

    4.83




    264.00

    264.50

    0.50

    3.96




    335.70

    338.20

    2.50

    3.80



    Including

    335.70

    336.20

    0.50

    8.55




    456.50

    457.50

    1.00

    4.26




    613.50

    614.05

    0.55

    4.85




    630.00

    630.70

    0.70

    3.37


    IM-21-129

    No Significant Assays





    Shaft

    IM-21-130


    72.00

    72.50

    0.50

    8.32

    Shaft

    IM-21-131


    201.50

    202.00

    0.50

    4.51

    Shaft



    282.50

    283.50

    1.00

    3.71




    313.50

    314.35

    0.85

    14.75




    370.50

    371.00

    0.50

    10.30

    Valley



    374.00

    376.00

    2.00

    8.00



    Including

    374.00

    375.00

    1.00

    13.90




    484.65

    485.80

    1.15

    8.73




    534.00

    534.50

    0.50

    3.34




    588.10

    588.60

    0.50

    3.42


    IM-21-132


    56.75

    57.30

    0.55

    12.15

    Shaft



    89.65

    90.25

    0.60

    51.30


    IM-21-133


    50.85

    51.50

    0.65

    3.57

    Shaft



    54.65

    55.15

    0.50

    4.45




    68.80

    69.40

    0.60

    20.80




    103.30

    103.90

    0.60

    5.34




    249.00

    249.60

    0.60

    4.03




    402.70

    403.30

    0.60

    3.39


    IM-21-134


    300.30

    300.80

    0.50

    3.95

    Shaft



    365.00

    366.00

    1.00

    5.34

    Valley



    373.50

    374.00

    0.50

    3.07




    381.00

    382.50

    1.50

    11.07



    Including

    381.00

    381.50

    0.50

    27.90




    426.75

    427.25

    0.50

    42.70




    431.40

    432.00

    0.60

    4.76




    447.50

    448.00

    0.50

    3.13




    451.20

    451.75

    0.55

    9.13




    454.75

    455.25

    0.50

    9.23




    457.50

    463.35

    5.85

    7.14



    Including

    459.90

    460.40

    0.50

    64.20




    461.50

    462.00

    0.50

    8.93




    467.20

    469.70

    2.50

    7.01




    473.95

    474.45

    0.50

    3.34




    492.50

    493.00

    0.50

    13.85




    506.00

    506.50

    0.50

    3.36


    IM-21-135


    100.05

    103.50

    3.45

    9.74

    Shaft


    Including

    100.05

    100.55

    0.50

    32.00



    and

    102.20

    103.00

    0.80

    11.90




    291.50

    292.00

    0.50

    42.80




    421.10

    426.10

    5.00

    5.60

    Valley


    Including

    421.10

    421.60

    0.50

    11.95



    and

    421.60

    422.20

    0.60

    8.83



    and

    423.30

    423.80

    0.50

    20.80



    and

    425.60

    426.10

    0.50

    9.98




    506.15

    506.65

    0.50

    4.48


    IM-21-136


    93.55

    94.05

    0.50

    4.75

    Shaft



    167.80

    169.45

    1.65

    13.89



    Including

    168.45

    168.95

    0.50

    23.80



    and

    168.95

    169.45

    0.50

    17.25


    IM-21-137


    140.20

    140.70

    0.50

    7.01

    Shaft



    233.30

    234.90

    1.60

    12.86



    Including

    233.30

    233.85

    0.55

    28.50



    and

    233.85

    234.40

    0.55

    6.46


    IM-21-138


    155.00

    155.50

    0.50

    7.65

    Shaft



    170.45

    171.00

    0.55

    9.68




    197.00

    197.55

    0.55

    16.15


    IM-21-139


    154.50

    155.15

    0.65

    5.64

    Shaft



    204.00

    204.50

    0.50

    7.87




    232.40

    232.90

    0.50

    12.35




    316.00

    320.50

    4.50

    10.12



    Including

    318.80

    319.90

    1.10

    33.60




    392.35

    393.70

    1.35

    7.99



    Including

    393.00

    393.70

    0.70

    11.95




    413.50

    414.00

    0.50

    6.64


    IM-21-140


    99.00

    108.00

    9.00

    3.45

    Shaft


    Including

    99.00

    99.50

    0.50

    21.70




    265.00

    266.00

    1.00

    6.64




    282.80

    283.30

    0.50

    59.10




    393.00

    394.50

    1.50

    9.67

    Valley



    411.30

    422.00

    10.70

    5.61



    Including

    414.10

    415.50

    1.40

    40.20


    IM-21-141


    131.50

    132.00

    0.50

    3.78

    Shaft



    212.50

    213.00

    0.50

    4.95




    214.20

    215.00

    0.80

    4.26




    231.25

    237.00

    5.75

    12.18



    Including

    231.25

    231.75

    0.50

    13.10



    and

    231.75

    232.30

    0.55

    21.80



    and

    235.40

    235.90

    0.50

    39.00



    and

    235.90

    236.40

    0.50

    43.80




    245.00

    245.50

    0.50

    3.85


    IM-21-142


    110.90

    111.60

    0.70

    5.76

    Shaft



    273.50

    275.20

    1.70

    4.03



    Including

    273.50

    274.00

    0.50

    8.31




    280.00

    280.50

    0.50

    6.10




    287.00

    287.55

    0.55

    4.79




    289.15

    289.85

    0.70

    3.69




    325.50

    326.10

    0.60

    4.05


    IM-21-143


    124.55

    126.15

    1.60

    10.67

    Shaft


    Including

    125.30

    126.15

    0.85

    18.55




    213.85

    218.50

    4.65

    3.89



    Including

    216.00

    216.50

    0.50

    11.05




    223.85

    224.35

    0.50

    11.00




    226.40

    227.00

    0.60

    24.60




    231.00

    235.00

    4.00

    3.73



    Including

    231.00

    231.70

    0.70

    12.10


    IM-21-144


    102.00

    102.90

    0.90

    3.13

    Shaft



    275.40

    277.05

    1.65

    31.07



    Including

    276.00

    276.50

    0.50

    55.40




    308.80

    309.30

    0.50

    21.50




    326.70

    327.20

    0.50

    6.05




    344.75

    348.30

    3.55

    19.35



    Including

    344.75

    345.25

    0.50

    11.85



    and

    346.65

    347.50

    0.85

    34.90



    and

    347.50

    348.30

    0.80

    41.30




    384.00

    390.85

    6.85

    6.63

    Valley


    Including

    387.50

    388.80

    1.30

    27.50




    403.00

    403.50

    0.50

    25.70




    414.00

    414.50

    0.50

    16.10




    423.65

    424.75

    1.10

    14.82



    Including

    423.65

    424.15

    0.50

    27.40




    441.00

    442.20

    1.20

    5.08



    Including

    441.50

    442.20

    0.70

    7.88




    493.45

    493.95

    0.50

    3.19




    559.75

    560.35

    0.60

    5.64


    IM-21-145


    140.00

    140.50

    0.50

    6.57

    Shaft



    241.05

    242.05

    1.00

    16.85



    Including

    241.55

    242.05

    0.50

    32.70




    260.70

    261.20

    0.50

    7.31




    278.45

    279.50

    1.05

    9.54




    300.70

    310.85

    10.15

    12.60



    Including

    300.70

    301.20

    0.50

    10.25



    and

    306.30

    306.80

    0.50

    97.80



    and

    307.35

    307.85

    0.50

    102.00



    and

    310.35

    310.85

    0.50

    36.70




    356.30

    357.00

    0.70

    8.05




    406.50

    407.50

    1.00

    3.16


    IM-21-146


    88.00

    89.00

    1.00

    4.30

    Shaft



    93.30

    94.00

    0.70

    25.60




    103.00

    103.50

    0.50

    3.37




    211.30

    214.60

    3.30

    4.33



    Including

    212.10

    213.10

    1.00

    8.30




    227.00

    227.50

    0.50

    3.61




    245.30

    248.40

    3.10

    3.50



    Including

    247.40

    248.40

    1.00

    9.50




    263.30

    270.20

    6.90

    9.37



    Including

    263.30

    264.80

    1.50

    10.10



    and

    264.80

    266.30

    1.50

    19.50



    and

    269.00

    270.20

    1.20

    11.55


    IM-21-147


    76.50

    78.00

    1.50

    5.05

    Shaft



    120.80

    121.40

    0.60

    3.38




    221.40

    222.50

    1.10

    9.02


    IM-21-148


    68.45

    69.65

    1.20

    10.75

    Shaft



    264.00

    271.80

    7.80

    3.74



    Including

    264.00

    265.00

    1.00

    16.10



    and

    267.00

    268.00

    1.00

    9.83




    309.50

    310.15

    0.65

    22.50




    365.00

    366.90

    1.90

    8.11



    Including

    366.10

    366.90

    0.80

    12.25




    390.50

    391.30

    0.80

    5.54




    399.60

    404.00

    4.40

    3.30

    Valley


    Including

    399.60

    400.20

    0.60

    12.00




    410.10

    411.10

    1.00

    8.24



    Including

    410.10

    410.60

    0.50

    13.85




    416.15

    417.10

    0.95

    5.31




    539.10

    540.10

    1.00

    10.40


    IM-21-149


    153.55

    154.15

    0.60

    9.87

    Shaft



    157.80

    158.70

    0.90

    5.44




    186.00

    191.00

    5.00

    4.65



    Including

    186.00

    186.50

    0.50

    6.79




    255.20

    256.45

    1.25

    10.75


    IM-21-150


    164.75

    165.25

    0.50

    5.11

    Shaft



    250.20

    250.70

    0.50

    7.09




    255.65

    256.35

    0.70

    7.75




    291.85

    292.35

    0.50

    10.10




    300.90

    301.40

    0.50

    15.20




    350.05

    350.55

    0.50

    5.31




    354.00

    354.50

    0.50

    5.72




    361.70

    366.00

    4.30

    3.02



    Including

    364.20

    364.85

    0.65

    10.70


    IM-21-151


    83.40

    84.15

    0.75

    8.44

    Shaft



    87.25

    89.20

    1.95

    6.40



    Including

    88.15

    89.20

    1.05

    9.44




    162.20

    166.65

    4.45

    16.27



    Including

    162.20

    163.50

    1.30

    31.50



    and

    163.50

    164.05

    0.55

    23.90




    186.00

    190.20

    4.20

    10.17



    Including

    189.70

    190.20

    0.50

    48.20




    249.50

    250.00

    0.50

    4.61


    IM-21-152


    164.50

    165.15

    0.65

    4.47

    Shaft



    167.70

    168.40

    0.70

    5.80


    IM-21-153

    No Significant Assays





    Shaft

    IM-21-154

    No Significant Assays





    Shaft



    Table 2: Drill Hole Locations and Orientations


    HOLE ID

    EASTING

    NORTHING

    ELEV

    DIP

    AZI

    DEPTH (M)

    IM-21-102

    594249

    5884675

    1415

    -50

    148

    216

    IM-21-103

    593874

    5884956

    1384

    -56

    305

    222

    IM-21-104

    594442

    5884654

    1396

    -61

    135

    459

    IM-21-105

    594290

    5884534

    1441

    -70

    335

    207

    IM-21-106

    594462

    5884272

    1439

    -51

    339

    282

    IM-21-107

    594288

    5884534

    1440

    -57

    327

    201

    IM-21-108

    594989

    5884349

    1303

    -50

    121

    550

    IM-21-109

    594461

    5884271

    1439

    -55

    327

    225

    IM-21-110

    594291

    5884535

    1442

    -63

    330

    207

    IM-21-111

    594442

    5884657

    1394

    -58

    122

    666

    IM-21-112

    594461

    5884271

    1438

    -49

    322

    225

    IM-21-113

    594724

    5884483

    1378

    -66

    136

    531

    IM-21-114

    594289

    5884535

    1443

    -58

    348

    234

    IM-21-115

    594461

    5884271

    1440

    -44

    320

    222

    IM-21-116

    594542

    5884315

    1427

    -59

    322

    261

    IM-21-117

    594287

    5884531

    1438

    -63

    292

    150

    IM-21-118

    594988

    5884349

    1299

    -46

    113

    588

    IM-21-119

    594287

    5884531

    1440

    -65

    269

    195

    IM-21-120

    594545

    5884315

    1427

    -57

    112

    789

    IM-21-121

    594791

    5884446

    1371

    -50

    132

    201

    IM-21-122

    594287

    5884531

    1439

    -57

    265

    192

    IM-21-123

    594791

    5884446

    1371

    -43

    124

    219

    IM-21-124

    594287

    5884531

    1438

    -48

    257

    183

    IM-21-125

    594988

    5884348

    1302

    -45

    134

    522

    IM-21-126

    594442

    5884657

    1395

    -52

    112

    960

    IM-21-127

    594287

    5884532

    1439

    -53

    254

    195

    IM-21-128

    594791

    5884446

    1371

    -55

    130

    652

    IM-21-129

    594287

    5884532

    1438

    -45

    253

    192

    IM-21-130

    594288

    5884533

    1438

    -44

    105

    180

    IM-21-131

    594988

    5884348

    1303

    -44

    134

    621

    IM-21-132

    594287

    5884533

    1438

    -55

    115

    180

    IM-21-133

    594287

    5884533

    1438

    -45

    125

    468

    IM-21-134

    594998

    5884373

    1303

    -55

    114

    546

    IM-21-135

    594997

    5884375

    1300

    -52

    120

    812

    IM-21-136

    594581

    5884261

    1421

    -55

    342

    205

    IM-21-137

    594672

    5884232

    1391

    -66

    126

    330

    IM-21-138

    594580

    5884261

    1421

    -46

    333

    207

    IM-21-139

    594580

    5884261

    1420

    -53

    336

    435

    IM-21-140

    594996

    5884375

    1300

    -56

    128

    597

    IM-21-141

    594672

    5884232

    1390

    -67

    134

    357

    IM-21-142

    594580

    5884261

    1420

    -53

    326

    350

    IM-21-143

    594671

    5884232

    1391

    -68

    139

    339

    IM-21-144

    594995

    5884374

    1301

    -57

    131

    577

    IM-21-145

    594580

    5884261

    1422

    -58

    331

    507

    IM-21-146

    594674

    5884232

    1390

    -58

    142

    303

    IM-21-147

    594671

    5884232

    1390

    -66

    145

    300

    IM-21-148

    594995

    5884376

    1299

    -58

    136

    615

    IM-21-149

    594672

    5884231

    1392

    -60

    148

    324

    IM-21-150

    594580

    5884261

    1421

    -53

    331

    474

    IM-21-151

    594672

    5884231

    1391

    -61

    153

    279

    IM-21-152

    594287

    5884534

    1439

    -45

    147

    177

    IM-21-153

    594286

    5884533

    1438

    -53

    150

    252

    IM-21-154

    594671

    5884231

    1389

    -63

    158

    282


    Figure 1: Cariboo deposit areas overview map is available at globenewswire.com

    Figure 2: Mosquito Detail Map is available at globenewswire.com

    Figure 3: Shaft Zone select drilling highlights is available at globenewswire.com