SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (162994)1/20/2022 1:49:42 PM
From: LoneClone  Read Replies (1) | Respond to of 192642
 
ValOre Drills 53 m at 1.18 g/t 2PGE+Au from Surface at Cedro PGE Deposit

ca.finance.yahoo.com

ValOre Metals Corporation
Tue, January 18, 2022, 4:00 a.m.·9 min read

Assays from metallurgical drilling confirm historical results

Map of 2021 Metallurgical Drill Hole Locations at Cedro PGE Deposit



Map of 2021 Metallurgical Drill Hole Locations at Cedro PGE Deposit

VANCOUVER, British Columbia, Jan. 18, 2022 (GLOBE NEWSWIRE) -- ValOre Metals Corp. (“ValOre”; TSX-V: VO; OTC: KVLQF; Frankfurt: KEQ0, “the Company”) today provided an update on metallurgical testwork program at ValOre’s 100%-owned Pedra Branca Platinum Group Elements (“PGE”, “2PGE+Au”) Project (“Pedra Branca”) in northeastern Brazil.

“Confirmatory drilling results from Cedro returned broad, well mineralized palladium-platinum intercepts from surface, and down-dip at depth,” stated ValOre’s VP of Exploration, Colin Smith. “ValOre’s team has commenced selecting a composite sample for Cedro, to be included in the on-going testwork program at ALS Metallurgy Kamloops. Preliminary results from testwork performed on the Cuiru deposit are expected next month.”

Key Points on Metallurgical Testwork Program:

  • Four HQ-size core drill holes totaling 332 metres (“m”) at the Cedro PGE deposit area were drilled, logged, sampled and assayed to support ongoing metallurgical testwork;

  • All 4 drill holes confirmed the historically reported geology and returned broad, consistently mineralized PGE intercepts including:

  • 53 m at 1.18 grams per tonne palladium + platinum + gold (“g/t 2PGE+Au”) from surface, incl. 7.0 m at 2.64 g/t 2PGE+Au from 44 m in drill hole DD21CD24A

  • 62 m at 0.90 g/t 2PGE+Au from 58 m, incl. 31 m at 1.40 g/t 2PGE+Au from 82 m in drill hole DD21CD05A

  • 52 m at 1.03 g/t 2PGE+Au from 19 m in drill hole DD21CD89A

  • 70 m at 0.71 g/t 2PGE+Au from surface, incl. 29 m at 1.12 g/t 2PGE+Au in drill hole DD21CD42A;

  • Metallurgical drilling campaign concluded, totaling 922 m in 14 holes, including 6 holes at Esbarro (378 m), and 4 holes at Curiu (213 m), in addition to the 332 m in 4 holes at Cedro;

  • Drill core for the remaining two PGE deposits which form part of the 2019 inferred resource, Trapia and Santo Amaro, will be collected from the 2020 and 2021 resource expansion drill programs;

  • Testwork program at ALS Metallurgy Kamloops (“ALS”) commenced in November 2021, with a primary focus on mineralogy and conventional processing circuits, and preliminary results expected in February 2022.

  • *Reported core assay interval lengths are estimated to represent 95-100% true width

    2021 Metallurgical Drill Program

    Four HQ-size core drill holes (totaling 332 m) were completed at the Cedro deposit (151,000 ounces [“oz”] 2PGE+Au contained in an inferred resource of 4.2 million tonnes [“Mt”] grading 1.10 g/t 2PGE+Au) to provide PGE mineralized material for ongoing metallurgical testwork. In addition, 6 holes (378 m) were drilled into the Esbarro deposit (394,000 oz 2PGE+Au in 9.9 Mt grading 1.23 g/t 2PGE+Au), and 4 holes (213 m) were drilled into the Curiu deposit (100,000 oz 2PGE+Au in 1.6 Mt grading 1.93 g/t 2PGE+Au). CLICK HERE for news release dated October 4, 2021, for assay results from the Esbarro and Curiu drill program.

    All drill holes confirmed the historically reported mineralized ultramafic (“UM”) intrusion and returned broad, consistently mineralized 2PGE+Au intercepts, originating at surface and at depth, down dip. See Table 1 and 2 below for a complete table of Cedro drill core assays and Figure 1 for a map of the metallurgical drill hole locations at Cedro.

    Table 1: Drill Core 2PGE+Au Assays from the 2021 Metallurgical Drill Program at Cedro

    Hole ID

    From
    (m)

    To
    (m)

    Length
    (m)

    Au
    (g/t)

    Pd
    (g/t)

    Pt
    (g/t)

    2PGE+Au
    (g/t)

    Summary Interval

    Gram*
    Metre

    DD21CD05A

    57.68

    119.65

    61.97

    0.03

    0.54

    0.34

    0.90

    62 m at 0.90 g/t 2PGE+Au from 58 m
    incl. 31 m at 1.40 g/t 2PGE+Au from 82 m

    56

    82.00

    112.50

    30.50

    0.04

    0.88

    0.48

    1.40

    DD21CD24A

    0.00

    53.00

    53.00

    0.03

    0.79

    0.36

    1.18

    53 m at 1.18 g/t 2PGE+Au from surface
    incl. 7.0 m at 2.64 g/t 2PGE+Au from 44 m

    63

    44.00

    51.00

    7.00

    0.01

    1.86

    0.77

    2.64

    DD21CD42A

    0.00

    70.00

    70.00

    0.02

    0.45

    0.24

    0.71

    70 m at 0.71 g/t 2PGE+Au from surface
    incl. 29 m at 1.12 g/t 2PGE+Au from surface
    and 2.8 m at 1.61 g/t 2PGE+Au from 43 m

    50

    0.00

    29.20

    29.20

    0.01

    0.71

    0.40

    1.12

    43.25

    46.00

    2.75

    0.01

    1.05

    0.55

    1.61

    DD21CD89A

    19.15

    70.75

    51.60

    0.06

    0.63

    0.34

    1.03

    52 m at 1.03 g/t 2PGE+Au from 19 m
    incl. 2.8 m at 5.95 g/t 2PGE+Au, 0.11 g/t Rh from 46 m

    53

    45.70

    48.50

    2.80

    0.01

    4.31

    1.63

    5.95


    *Reported core assay interval lengths are estimated to represent 95-100% true width

    Table 2: Historical vs. 2021 Twin Core Assays Comparison

    DDH Type

    Hole ID

    Summary Interval

    Gram*Metre

    Historical

    DD01CD05

    62 m at 0.84 g/t 2PGE+Au from 59 m

    52

    2021 Twin

    DD21CD05A

    62 m at 0.90 g/t 2PGE+Au from 58 m

    56

    Historical

    DD07CD24

    52 m at 1.34 g/t 2PGE+Au from 1.4 m

    69

    2021 Twin

    DD21CD24A

    53 m at 1.18 g/t 2PGE+Au from surface

    63

    Historical

    DD08CD42

    71 m at 0.89 g/t 2PGE+Au from surface

    63

    2021 Twin

    DD21CD42A

    70 m at 0.71 g/t 2PGE+Au from surface

    50

    Historical

    DD10CD89

    51 m at 1.14 g/t 2PGE+Au from 14 m

    58

    2021 Twin

    DD21CD89A

    52 m at 1.03 g/t 2PGE+Au from 19 m

    53


    Figure 1: Map of 2021 Metallurgical Drill Hole Locations at Cedro PGE Deposit is available at globenewswire.com

    ALS Metallurgy Testwork Program

    CLICK HERE for news release dated October 4, 2021, for more information regarding the ALS testwork program.

    CLICK HERE for more information regarding ALS Metallurgy Kamloops.

    Quality Control/Quality Assurance (“QA/QC”) and Grade Interval Reporting

    CLICK HERE for a summary of ValOre’s policies and procedures related to QA/QC and grade interval reporting.

    Qualified Person (QP)

    The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Colin Smith, P.Geo., ValOre’s QP and Vice President of Exploration.

    About ValOre Metals Corp.

    ValOre Metals Corp. (TSX-V: VO) is a Canadian company with a portfolio of high-quality exploration projects. ValOre’s team aims to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration, process improvement, and innovation.

    In May 2019, ValOre announced the acquisition of the Pedra Branca Platinum Group Elements (PGE) property, in Brazil, to bolster its existing Angilak uranium, Genesis/Hatchet uranium and Baffin gold projects in Canada.

    The Pedra Branca PGE Project comprises 51 exploration licenses covering a total area of 55,984 hectares (138,339 acres) in northeastern Brazil. At Pedra Branca, 5 distinct PGE+Au deposit areas host, in aggregate, a current Inferred Resource of 1,067,000 ounces 2PGE+Au contained in 27.2 million tonnes grading 1.22 g/t 2PGE+Au ( CLICK HERE for ValOre’s July 23, 2019 news release). All the currently known Pedra Branca inferred PGE resources are potentially open pittable.

    Comprehensive exploration programs have demonstrated the "District Scale" potential of ValOre’s Angilak Property in Nunavut Territory, Canada that hosts the Lac 50 Trend having a current Inferred Resource of 2,831,000 tonnes grading 0.69% U3O8, totaling 43.3 million pounds U3O8. For disclosure related to the inferred resource for the Lac 50 Trend uranium deposits, please CLICK HERE for ValOre's news release dated March 1, 2013.

    ValOre’s team has forged strong relationships with sophisticated resource sector investors and partner Nunavut Tunngavik Inc. (NTI) on both the Angilak and Baffin Gold Properties. ValOre was the first company to sign a comprehensive agreement to explore for uranium on Inuit Owned Lands in Nunavut Territory and is committed to building shareholder value while adhering to high levels of environmental and safety standards and proactive local community engagement.

    On behalf of the Board of Directors,

    “Jim Paterson”

    James R. Paterson, Chairman and CEO

    ValOre Metals Corp.

    For further information about ValOre Metals Corp., or this news release, please visit our website at www.valoremetals.com or contact Investor Relations at 604.653.9464, or by email at contact@valoremetals.com.

    ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit: globenewswire.com

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    This news release contains “forward-looking statements” within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.