SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (167800)10/7/2022 5:54:36 PM
From: LoneClone  Read Replies (1) | Respond to of 193020
 
SSR MINING ANNOUNCES POSITIVE EXPLORATION RESULTS FOR THE ÇAKMAKTEPE EXTENSION PROJECT (ARDICH), INCLUDING 28.3 METERS AT 8.23 G/T AU

newswire.ca

SSR Mining Inc. Oct 05, 2022, 07:00 ET

DENVER, Oct. 5, 2022 /CNW/ - SSR Mining Inc. (NASDAQ: SSRM) (TSX: SSRM) (ASX: SSR) ("SSR Mining" or the "Company") is pleased to announce positive results from 151 diamond drill holes for the Çakmaktepe Extension (Ardich) for the period from May 2021 to June 2022. These results build upon, and are subsequent to, the Çakmaktepe Extension Mineral Reserves reported in the Çöpler Technical Report Summary ("TRS") effective as of December 31, 2021, in which the Çakmaktepe Extension deposit contributed 1.2 million ounces of gold production to the Çöpler life of mine production profile beginning in 2023 for total development capital of $69 million. As outlined in the TRS, the Çakmaktepe Extension currently hosts 1.7 million ounces of Mineral Reserves, along with an additional 0.6 million ounces of Measured & Indicated Mineral Resources and 0.8 million ounces of Inferred Mineral Resources. Of the 151 diamond drill holes included in this news release, 34 were infill within the current Mineral Reserve pit, 82 targeted Mineral Reserve conversion within the existing Mineral Resource block model, and 35 were step-out intercepts identifying new mineralization outside of existing Mineral Resources.




Figure 1: Location map of the Çakmaktepe Extension Project. (CNW Group/SSR Mining Inc.)



Figure 2: Drill hole locations and surface outline of Reserve Pit Boundary. (CNW Group/SSR Mining Inc.)



Figure 3: Section showcasing highlighted drill holes against the Reserve pit shell. (CNW Group/SSR Mining Inc.)





The drilling program aimed to both upgrade and expand the existing Mineral Reserves and Resources at Çakmaktepe Extension (see Figure 2 and 3) (Table 1), with highlight drill intercepts including:



  • AR461: 8.23 g/t Au over 28.3 meters from 138.0 meters,
  • including: 21.09 g/t Au over 4.0 meters from 154.0 meters,
  • including: 24.95 g/t Au over 3.0 meters from 162.0 meters.
  • AR514: 2.46 g/t Au over 53.0 meters from 160.0 meters.
  • AR536: 2.38 g/t Au over 55.8 meters from 110.6 meters.
  • AR544: 5.24 g/t Au over 27.1 meters from 130.3 meters.
  • AR558: 5.20 g/t Au over 27.6 meters from 149.1 meters,
  • including: 13.66 g/t Au over 4.2 meters from 160.4 meters.
  • Rod Antal, President and CEO of SSR Mining said, "Çöpler has evolved significantly over its more than 10-year operating life, and the Çakmaktepe Extension project represents the next phase of growth for the asset. As highlighted in the 2021 TRS, the Çakmaktepe Extension will add 1.2 million ounces over 15+ years of production for an expected $69M in development capital, representing one of the highest return growth projects in the entire sector. These drill holes provide both improved confidence for the Çakmaktepe Extension mine plan and set the stage for additional growth at the project. We will incorporate these results into an updated Mineral Reserve and Resource statement for the deposit in an updated Technical Report Summary for Çöpler expected in 2023.

    In addition to the positive drill results, we have continued to de-risk the Çakmaktepe Extension project startup during the third quarter of 2022 with the receipt of the Environmental Impact Assessment ("EIA") for the first phase of the project. Clearly, Çöpler's best days lie ahead, with value accretive growth opportunities like our C2 project on the horizon and a wealth of exploration targets to advance across the district in the years to come."

    The Çakmaktepe Extension was discovered in 2017 and is located 1.5km north of the Çakmaktepe mine and 6km from the Çöpler operations, enabling both oxide and sulfide ore to be processed with existing Çöpler Mine processing infrastructure (see Figure 1). The 2022 drilling plan aims to deliver additional Mineral Reserve and Resource growth at Çakmaktepe Extension beyond the mine plan incorporated into the 2021 TRS. The deposit remains open to the southwest and at depth, and the site team has also advanced additional metallurgical testing at the project with the focus on improving oxide recoveries.

    Overview of Mineralization Style
    The Çakmaktepe Extension deposit is a listwanite-dolomite hosted gold replacement mineralization occurring along thrust fault zones between listwanite, ophiolite, dolomite, cataclastite, hornfels, and limestone. Mineralization and alteration extend in a NW-SE direction, parallel to major high angle fault structures controlling both mineralization and block rotations. Gold grades increase at dolomite-listwanite contacts and within silica-rich (jasperoid) listwanites. The mineralization is predominantly oxide (67% of existing Mineral Reserves) with sulfide mineralization confined to pyrite-rich jasperoid zones. Based on available drill data, the main mineralized zone appears tabular and almost flat lying.

    As exploration advances and the geological understanding of the Çakmaktepe and Çakmaktepe Extension deposits increases, it appears that there is probable structural connectivity between the areas, potentially creating an expanded "Greater Çakmaktepe" development pathway.

    Drilling
    SSR Mining has drilled 578 diamond core holes at the Çakmaktepe Extension between August 2017 and June 2022, totaling 121,536 meters. The majority of these drill holes were drilled within SSR Mining's 80% owned and managed licenses and approximately 88% of the existing Çakmaktepe Extension Mineral Reserves are located on ground held 80% by SSR Mining, with the remainder located on ground 50% held by SSR Mining.1

    The 151 holes announced in this news release total 34,496m of drilling that was completed between May 2021 and June 2022 (hole IDs AR428-AR578). These holes targeted Mineral Reserve conversion and potential Mineral Reserve and Resource growth at the Çakmaktepe Extension. The Çakmaktepe Extension mineralization dips gently towards the southeast and is interpreted to become deeper due to faulting and topography.

    Drilling Highlights


    Table 1: Significant gold intercepts at the Çakmaktepe Extension project.

    Hole ID

    From

    (m)

    To

    (m)

    Interval
    (m)


    Gold

    (Au g/t)

    Oxidation

    State

    EOH Depth

    (m)

    Comments

    AR446

    171.00

    191.90

    20.90

    4.80

    Mixed

    280.90

    44/56 Oxide - Sulfide

    including

    188.50

    190.50

    2.00

    12.20

    Sulfide



    237.30

    240.30

    3.00

    0.78

    Oxide


    AR452

    184.00

    191.00

    7.00

    1.70

    Oxide

    254.90


    193.80

    198.00

    4.20

    3.26

    Oxide


    206.00

    226.00

    20.00

    4.38

    Mixed

    75/25 Oxide-Sulfide,
    includes 1.3 meters
    isolated core loss

    including

    214.00

    216.00

    2.00

    12.40

    Sulfide


    AR461

    138.00

    166.30

    28.30

    8.23

    Mixed

    201.80

    51/49 Oxide - Sulfide

    including

    150.00

    151.00

    1.00

    12.15

    Sulfide


    including

    154.00

    158.00

    4.00

    21.09

    Sulfide


    including

    162.00

    165.00

    3.00

    24.95

    Mixed

    67/33 Oxide - Sulfide

    AR464

    186.00

    207.30

    21.30

    2.42

    Oxide

    320.00


    210.50

    213.50

    3.00

    25.88

    Sulfide


    including

    210.50

    212.50

    2.00

    37.25

    Sulfide



    240.70

    252.70

    12.00

    0.36

    Sulfide


    AR482

    151.50

    188.40

    36.90

    2.72

    Oxide

    212.30


    AR514

    160.00

    213.00

    53.00

    2.46

    Mixed

    272.00

    70/30 Oxide - Sulfide

    including

    191.00

    191.80

    0.80

    11.55

    Sulfide


    AR536

    110.60

    166.40

    55.80

    2.38

    Mixed

    187.60

    56/44 Oxide - Sulfide

    including

    144.30

    145.30

    1.00

    10.30

    Sulfide



    184.60

    185.60

    1.00

    5.45

    Sulfide


    AR544

    130.30

    157.40

    27.10

    5.24

    Mixed

    192.50

    56/44 Oxide - Sulfide

    including

    138.30

    139.10

    0.80

    12.30

    Sulfide


    including

    147.00

    148.00

    1.00

    23.00

    Oxide


    AR558

    149.10

    176.70

    27.60

    5.20

    Mixed

    204.00

    63/37 Oxide - Sulfide,
    includes 0.7 meters
    isolated core loss

    including

    160.40

    164.60

    4.20

    13.66

    Mixed

    48/52 Oxide - Sulfide

    AR570

    145.00

    150.40

    5.40

    5.73

    Mixed

    269.20

    46/54 Oxide - Sulfide

    including

    145.00

    145.80

    0.80

    11.40

    Oxide



    157.40

    166.00

    8.60

    4.00

    Sulfide


    including

    164.00

    165.00

    1.00

    14.10

    Sulfide



    175.00

    204.60

    29.60

    1.60

    Mixed

    59/41 Oxide - Sulfide

    208.70

    224.80

    16.10

    1.93

    Mixed

    52/48 Oxide - Sulfide






    Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in
    Table 1. All thicknesses are down hole length and true widths are not known at this stage. The complete drill assay results and
    further technical information relating to this news release can be found below.




    Technical Procedural Information
    Sampling, Assaying and QA/QC
    The Çakmaktepe Extension drilling program started in 2017. Diamond drill core is sampled as half core at 1m intervals or geological contacts. Sampling interval varies between 0.5 meters and 3.3 meters with an average of 1.37 meters length. The samples were submitted to ALS Global laboratories in Izmir, Türkiye for sample preparation and analysis which is an ISO/IEC 7025:2005 certified and accredited laboratory. Bureau Veritas (Acme) laboratory, in Ankara, Türkiye was used for umpire check sample analysis. Gold was analyzed by fire assay with an AAS finish, and the multi-element analyses were determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10 g/t, the fire assay process was repeated with a gravimetric finish for coarse gold. The drill and geochemical samples were collected in accordance with accepted industry standards. SSR Mining conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays. External review of data and processes relating to Çakmaktepe Extension was completed by independent consultant Dr. Erdem Yetkin, P.Geo. in September 2022. There were no adverse material results detected and the QA/QC indicates the information collected is acceptable, and the database can be used for further studies.

    Metallurgical Test Work
    Metallurgical test work and recovery assumptions are reported in the 2021 TRS and include heap leach for oxide ores and flotation and pressure oxidation of sulfide ore.

    Qualified Person
    The exploration results disclosed in this news release were prepared under the supervision and approved by Dr. Cengiz Y. Demirci, AIPG Registered Member and a CPG (Certified Professional Geologist), and VP Exploration at SSR Mining. Dr. Demirci has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and is a qualified person for purposes of Subpart 1300 of Regulation S-K ("S-K 1300") and National Instrument 43-101 ("NI 43-101").

    External review of data and processes relating to the Çakmaktepe Extension was completed in September 2022 by independent consultant Dr. Erdem Yetkin, P.Geo. a qualified person for purposes of S-K 1300 and NI 43-101. There were no adverse material results detected and Dr. Yetkin is of the opinion that the QA/QC indicates the information collected is acceptable, and the database can be used for announcing the exploration results.

    You are encouraged to also review the 2021 Çöpler TRS, which is available on SSR Mining's Current Report on Form 8-K filed with the Securities and Exchange Commission's EDGAR system ( sec.gov) on September 29, 2022.

    End Notes

  • The Çöpler gold mine is owned and operated by Anagold Madencilik Sanayi ve Ticaret Anonim Sirketi (Anagold). SSR Mining controls 80% of the shares of Anagold, Lidya Madencilik Sanayi ve Ticaret A.S. ("Lidya"), controls 18.5%, and a bank wholly owned by Çalik Holdings A.S., holds the remaining 1.5%. Exploration tenures surrounding the project area and mining at Çakmaktepe are subject to joint venture agreements between SSR Mining and Lidya that have varying interest proportions. SSR Mining controls 50% of the shares of Kartaltepe Madencilik Sanayi ve Ticaret Anonim Sirketi and 50% of Tunçpinar Madencilik Sanayi ve Ticaret Anonim Sirketi. The other 50% is controlled by Lidya.

  • About SSR Mining
    SSR Mining Inc. is a leading, free cash flow focused gold company with four producing assets located in the USA, Türkiye, Canada, and Argentina, combined with a global pipeline of high-quality development and exploration assets. In 2021, the four operating assets produced approximately 794,000 gold-equivalent ounces. SSR Mining is listed under the ticker symbol SSRM on the NASDAQ and the TSX, and SSR on the ASX.

    SSR Mining Contacts:

    F. Edward Farid, Executive Vice President, Chief Corporate Development Officer
    Alex Hunchak, Director, Corporate Development and Investor Relations

    SSR Mining Inc.
    E-Mail: invest@ssrmining.com
    Phone: +1 (888) 338-0046

    To receive SSR Mining's news releases by e-mail, please register using the SSR Mining website at www.ssrmining.com.

    Cautionary Note Regarding Forward-Looking Information
    Except for statements of historical fact relating to us, certain statements contained in this news release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively "forward-looking information") within the meaning of applicable securities laws. Forward-looking information may be contained in this document and our other public filings. Forward-looking information relates to statements concerning our outlook and anticipated events or results and, in some cases, can be identified by terminology such as "may", "will", "could", "should", "expect", "plan", "anticipate", "believe", "intend", "estimate", "projects", "predict", "potential", "continue" or other similar expressions concerning matters that are not historical facts.

    Forward-looking information and statements in this news release are based on certain key expectations and assumptions made by us. Although we believe that the expectations and assumptions on which such forward-looking information and statements are based are reasonable, undue reliance should not be placed on the forward-looking information and statements because we can give no assurance that they will prove to be correct. Forward-looking information and statements are subject to various risks and uncertainties which could cause actual results and experience to differ materially from the anticipated results or expectations expressed in this news release. The key risks and uncertainties include, but are not limited to: local and global political and economic conditions; governmental and regulatory requirements and actions by governmental authorities, including changes in government policy, government ownership requirements, changes in environmental, tax and other laws or regulations and the interpretation thereof; developments with respect to the COVID-19 pandemic, including the duration, severity and scope of the pandemic and potential impacts on mining operations; and other risk factors detailed from time to time in our reports filed with the Securities and Exchange Commission on EDGAR and the Canadian securities regulatory authorities on SEDAR.

    Forward-looking information and statements in this news release include any statements concerning, among other things: preliminary cost reporting in this document; production, operating, cost, and capital expenditure guidance; our operational and development targets and catalysts and the impact of any suspension on operations; forecasts and outlook, including related to production guidance; timing and expectations regarding the impact of any interruptions caused on our operations; the results of any gold reconciliations; the ability to discover additional oxide gold ore; matters relating to proposed exploration; communications with local stakeholders; maintaining community and government relations; negotiations of joint ventures; negotiation and completion of transactions; commodity prices; Mineral Resources, Mineral Reserves, conversion of Mineral Resources, realization of Mineral Reserves, and the existence or realization of Mineral Resource estimates; the development approach; the timing and amount of future production; the timing of studies, announcements, and analysis; the timing of construction and development of proposed mines and process facilities; capital and operating expenditures; economic conditions; availability of sufficient financing; exploration plans; receipt of regulatory approvals; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.

    Such forward-looking information and statements are based on a number of material factors and assumptions, including, but not limited in any manner to, those disclosed in any other of our filings on EDGAR and SEDAR, and include: the inherent speculative nature of exploration results; the ability to explore; communications with local stakeholders; maintaining community and governmental relations; status of negotiations of joint ventures; weather conditions at our operations; commodity prices; the ultimate determination of and realization of Mineral Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals, titles, licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to adequate services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds; availability of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; lack of social opposition to our mines or facilities; lack of legal challenges with respect to our properties; the timing and amount of future production; the ability to meet production, cost, and capital expenditure targets; timing and ability to produce studies and analyses; capital and operating expenditures; economic conditions; availability of sufficient financing; the ultimate ability to mine, process, and sell mineral products on economically favorable terms; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or conditions. While we consider these factors and assumptions to be reasonable based on information currently available to us, they may prove to be incorrect.

    The above list is not exhaustive of the factors that may affect any of the Company's forward-looking information. You should not place undue reliance on forward-looking information and statements. Forward-looking information and statements are only predictions based on our current expectations and our projections about future events. Actual results may vary from such forward-looking information for a variety of reasons including, but not limited to, risks and uncertainties disclosed in our filings on our website at www.ssrmining.com, on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on the ASX at www.asx.com.au and other unforeseen events or circumstances. Other than as required by law, we do not intend, and undertake no obligation to update any forward-looking information to reflect, among other things, new information or future events. The information contained on, or that may be accessed through, our website is not incorporated by reference into, and is not a part of, this document.

    Qualified Persons
    The scientific and technical information concerning our mineral projects in this news release have been reviewed and approved by a "qualified person" under S-K 1300. For details on the "qualified persons" approving such information, a description of the key assumptions, parameters and methods used to estimate mineral reserves and mineral resources for SSR Mining Inc.'s material properties included in this news release, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant factors, please review the Technical Report Summaries for each of the Company's material properties which are available at www.sec.gov.



    Table 2: All drill holes completed at the Çakmaktepe Extension project between May 2021 and June 2022.

    Hole ID

    From

    (m)

    To

    (m)

    Interval

    (m)

    Gold

    (Au g/t)

    Oxidation

    Stage

    EOH Depth

    (m)

    Comments

    AR428

    201.00

    215.00

    14.00

    1.42

    Oxide

    229.40


    AR429

    119.20

    124.20

    5.00

    0.48

    Oxide

    196.40


    AR430

    42.00

    52.40

    10.40

    0.71

    Oxide

    173.00


    AR431

    48.00

    51.00

    3.00

    1.00

    Oxide

    149.70


    AR432

    194.00

    199.40

    5.40

    5.50

    Oxide

    334.50

    Includes 0.6 meter
    isolated core loss

    including

    195.60

    196.40

    0.80

    13.70

    Oxide



    213.00

    220.40

    7.40

    1.32

    Sulfide


    238.00

    242.80

    4.80

    1.10

    Sulfide


    AR433

    18.10

    31.00

    12.90

    1.67

    Oxide

    125.50


    37.00

    63.10

    26.10

    1.26

    Oxide


    AR434

    126.50

    131.50

    5.00

    0.33

    Oxide

    164.80


    AR435

    151.80

    158.80

    7.00

    0.39

    Oxide

    250.00


    AR436

    N.S.I

    183.50


    AR437

    N.S.I

    206.00


    AR438

    N.S.I

    224.40


    AR439

    126.70

    143.00

    16.30

    1.79

    Mixed

    184.10

    37/63 Oxide - Sulfide

    146.00

    152.00

    6.00

    2.14

    Oxide


    AR440

    193.00

    196.00

    3.00

    0.91

    Oxide

    321.90


    AR441

    70.00

    76.30

    6.30

    1.34

    Oxide

    257.50


    95.00

    104.00

    9.00

    0.50

    Mixed

    33/67 Oxide - Sulfide

    140.00

    145.00

    5.00

    0.80

    Oxide


    AR442

    50.00

    56.00

    6.00

    0.50

    Oxide

    176.00


    99.00

    102.00

    3.00

    0.42

    Oxide


    AR443

    202.70

    211.70

    9.00

    5.44

    Sulfide

    211.70


    including

    209.90

    210.90

    1.00

    13.95

    Oxide


    AR444

    202.20

    221.00

    18.80

    0.84

    Mixed

    240.30

    73/27 Oxide Sulfide

    AR445

    N.S.I

    198.00


    AR446

    171.00

    191.90

    20.90

    4.80

    Mixed

    280.90

    44/56 Oxide - Sulfide

    including

    188.50

    190.50

    2.00

    12.20

    Sulfide



    237.30

    240.30

    3.00

    0.78

    Oxide


    AR447

    72.30

    76.30

    4.00

    2.11

    Oxide

    146.10


    AR448

    61.00

    75.00

    14.00

    0.86

    Oxide

    254.50


    115.00

    120.00

    5.00

    0.67

    Mixed

    56/44 Oxide - Sulfide

    AR449

    N.S.I

    111.00

    Abandoned hole.

    AR450

    100.80

    111.00

    10.20

    1.21

    Oxide

    153.80


    AR451

    125.00

    129.40

    4.40

    0.92

    Oxide

    286.00


    192.90

    198.00

    5.10

    1.60

    Sulfide


    AR452

    184.00

    191.00

    7.00

    1.70

    Oxide

    254.90


    193.80

    198.00

    4.20

    3.26

    Oxide


    206.00

    226.00

    20.00

    4.38

    Mixed

    75/25 Oxide-Sulfide,
    includes 1.3 meter
    isolated core loss

    including

    214.00

    216.00

    2.00

    12.40

    Sulfide


    AR453

    92.90

    109.80

    16.90

    4.98

    Oxide

    218.40


    including

    98.90

    100.90

    2.00

    17.80

    Sulfide


    AR454

    124.20

    141.20

    17.00

    3.26

    Oxide

    198.00


    AR455

    92.00

    96.80

    4.80

    1.26

    Oxide

    153.50


    AR456

    168.50

    178.10

    9.60

    1.40

    Mixed

    200.80

    73/27 Oxide - Sulfide

    AR457

    175.00

    184.00

    9.00

    2.26

    Sulfide

    312.00


    187.50

    188.80

    1.30

    3.01

    Sulfide


    199.00

    217.00

    18.00

    0.80

    Sulfide


    232.00

    238.00

    6.00

    1.08

    Sulfide


    AR458

    68.80

    99.00

    30.20

    1.23

    Mixed

    238.30

    65/35 Oxide - Sulfide

    131.00

    136.00

    5.00

    0.85

    Sulfide


    AR459

    84.10

    99.00

    14.90

    0.78

    Mixed

    161.00

    65/35 Oxide - Sulfide

    AR460

    58.20

    59.50

    1.30

    3.43

    Oxide

    260.00


    114.10

    121.60

    7.50

    1.80

    Sulfide


    127.60

    133.00

    5.40

    2.10

    Sulfide


    AR461

    138.00

    166.30

    28.30

    8.23

    Mixed

    201.80

    51/49 Oxide - Sulfide

    including

    150.00

    151.00

    1.00

    12.15

    Sulfide


    including

    154.00

    158.00

    4.00

    21.09

    Sulfide


    including

    162.00

    165.00

    3.00

    24.95

    Mixed

    67/33 Oxide - Sulfide

    AR462

    N.S.I

    165.20


    AR463

    N.S.I

    119.30


    AR464

    186.00

    207.30

    21.30

    2.42

    Oxide

    320.00


    210.50

    213.50

    3.00

    25.88

    Sulfide


    including

    210.50

    212.50

    2.00

    37.25

    Sulfide



    240.70

    252.70

    12.00

    0.36

    Sulfide


    AR465

    149.00

    160.70

    11.70

    0.78

    Mixed

    272.80

    32/68 Oxide - Sulfide

    165.70

    168.70

    3.00

    0.37

    Sulfide


    186.20

    195.20

    9.00

    1.93

    Oxide


    AR466

    169.20

    176.20

    7.00

    0.56

    Oxide

    269.50


    194.20

    197.40

    3.20

    2.34

    Oxide


    207.50

    221.40

    13.90

    0.88

    Oxide


    224.00

    233.00

    9.00

    0.88

    Oxide


    AR467

    200.50

    216.50

    16.00

    2.54

    Mixed

    275.40

    32/68 Oxide - Sulfide

    220.00

    223.00

    3.00

    0.33

    Oxide


    AR468

    93.10

    103.20

    10.10

    1.71

    Oxide

    159.80


    106.00

    111.60

    5.60

    0.71

    Mixed

    68/32 Oxide - Sulfide

    AR469

    N.S.I

    96.50


    AR470

    261.30

    273.30

    12.00

    0.35

    Oxide

    293.30


    AR471

    N.S.I

    131.00


    AR472

    N.S.I

    207.50


    AR473

    252.00

    255.00

    3.00

    0.33

    Sulfide

    265.00


    AR474

    64.15

    73.50

    9.35

    1.71

    Oxide

    182.60


    79.40

    87.00

    7.60

    0.43

    Oxide


    99.80

    104.80

    5.00

    0.34

    Sulfide


    AR475

    106.20

    124.50

    18.30

    1.24

    Oxide

    262.00

    Includes 0.6 meter
    isolated core loss

    129.50

    143.40

    13.90

    0.66

    Oxide

    Includes 0.3 meter
    isolated core loss

    197.00

    201.00

    4.00

    0.31

    Oxide


    AR476

    170.70

    176.30

    5.60

    1.60

    Mixed

    226.50

    59/41 Oxide - Sulfide

    204.00

    216.80

    12.80

    4.27

    Mixed

    41/59 Oxide - Sulfide

    AR477

    149.80

    152.90

    3.10

    2.71

    Oxide

    271.20


    170.50

    175.00

    4.50

    0.73

    Oxide


    190.00

    191.00

    1.00

    3.69

    Sulfide


    263.60

    266.60

    3.00

    0.41

    Sulfide


    AR478

    N.S.I

    100.00


    AR479

    195.50

    205.80

    10.30

    2.18

    Sulfide

    288.20


    210.80

    223.40

    12.60

    1.09

    Mixed

    63/37 Oxide - Sulfide

    234.00

    240.80

    6.80

    1.11

    Oxide


    259.20

    267.80

    8.60

    0.68

    Mixed

    71/29 Oxide - Sulfide

    AR480

    230.50

    234.80

    4.30

    0.89

    Oxide

    302.00


    238.60

    241.70

    3.10

    0.41

    Oxide


    245.50

    258.80

    13.30

    0.66

    Oxide


    AR481

    84.50

    92.80

    8.30

    1.80

    Oxide

    247.70


    96.80

    114.40

    17.60

    1.22

    Oxide


    AR482

    151.50

    188.40

    36.90

    2.72

    Oxide

    212.30


    AR483

    192.60

    195.60

    3.00

    0.93

    Oxide

    250.00


    AR484

    176.30

    196.60

    20.30

    1.75

    Mixed

    316.60

    33/67 Oxide - Sulfide

    200.10

    203.60

    3.50

    0.77

    Oxide


    227.60

    238.30

    10.70

    0.68

    Sulfide


    259.40

    262.40

    3.00

    0.73

    Oxide


    AR485

    164.30

    169.90

    5.60

    1.00

    Oxide

    242.40


    172.90

    184.60

    11.70

    1.07

    Oxide


    215.60

    220.60

    5.00

    0.35

    Oxide


    AR486

    109.90

    116.90

    7.00

    1.22

    Oxide

    254.00


    AR487

    79.80

    83.80

    4.00

    0.47

    Oxide

    309.30


    88.80

    93.80

    5.00

    0.51

    Oxide


    246.90

    257.90

    11.00

    2.71

    Sulfide


    AR488

    147.50

    181.10

    33.60

    2.06

    Mixed

    195.50

    68/32 Oxide - Sulfide

    AR489

    84.80

    136.50

    51.70

    1.37

    Mixed

    208.40

    68/32 Oxide - Sulfide

    142.50

    153.50

    11.00

    0.82

    Oxide


    AR490

    N.S.I

    293.00


    AR491

    140.10

    140.80

    0.70

    4.43

    Oxide

    240.00


    155.80

    160.40

    4.60

    0.47

    Oxide


    AR492

    118.10

    149.00

    30.90

    1.62

    Mixed

    214.20

    74/26 Oxide - Sulfide

    including

    119.10

    120.10

    1.00

    17.15

    Oxide



    153.00

    158.50

    5.50

    0.76

    Oxide


    174.00

    183.50

    9.50

    3.57

    Oxide


    AR493

    N.S.I

    130.00

    SRK Piezometer water
    well

    AR494

    179.70

    206.00

    26.30

    2.89

    Mixed

    331.60

    73/27 Oxide - Sulfide

    including

    181.70

    183.70

    2.00

    16.08

    Sulfide



    220.60

    224.80

    4.20

    0.49

    Mixed

    52/48 Oxide - Sulfide

    235.80

    239.80

    4.00

    0.39

    Oxide


    AR495

    121.30

    140.00

    18.70

    0.96

    Oxide

    268.40


    AR496

    72.30

    75.30

    3.00

    0.82

    Oxide

    213.00


    95.20

    99.20

    4.00

    0.85

    Oxide


    105.20

    111.20

    6.00

    0.40

    Oxide


    195.00

    202.00

    7.00

    0.72

    Sulfide


    AR497

    199.90

    218.70

    18.80

    0.81

    Oxide

    288.30


    227.00

    232.60

    5.60

    0.73

    Oxide


    242.00

    249.70

    7.70

    0.49

    Oxide


    268.70

    271.70

    3.00

    0.41

    Oxide


    AR498

    175.90

    184.70

    8.80

    0.66

    Oxide

    260.60


    187.70

    197.90

    10.20

    0.54

    Oxide


    AR499

    114.00

    117.00

    3.00

    1.11

    Oxide

    270.00


    127.40

    131.50

    4.10

    0.56

    Oxide


    134.80

    139.80

    5.00

    0.74

    Oxide


    181.00

    190.20

    9.20

    1.73

    Mixed

    67/33 Oxide - Sulfide

    AR500

    199.50

    204.40

    4.90

    3.67

    Sulfide

    278.00


    224.50

    229.40

    4.90

    0.34

    Mixed

    41/59 Oxide - Sulfide

    AR501

    210.70

    225.60

    14.90

    1.81

    Oxide

    275.50


    AR502

    212.90

    218.50

    5.60

    0.45

    Sulfide

    223.50


    AR503

    107.90

    138.20

    30.30

    1.95

    Oxide

    230.10


    including

    111.50

    112.50

    1.00

    13.70

    Oxide


    AR504

    200.00

    228.00

    28.00

    2.80

    Sulfide

    310.60


    including

    226.00

    227.00

    1.00

    14.00

    Sulfide



    264.60

    267.60

    3.00

    0.39

    Oxide


    AR505

    195.50

    205.50

    10.00

    2.20

    Mixed

    305.10

    70/30 Oxide - Sulfide

    225.70

    228.70

    3.00

    0.84

    Sulfide


    256.20

    261.10

    4.90

    0.42

    Oxide


    271.90

    275.90

    4.00

    0.44

    Mixed

    50/50 Oxide - Sulfide

    279.40

    283.40

    4.00

    0.51

    Oxide


    AR506

    39.30

    48.40

    9.10

    0.46

    Oxide

    302.00


    98.00

    103.90

    5.90

    0.46

    Oxide


    AR507

    N.S.I

    331.60


    AR508

    192.50

    213.20

    20.70

    0.74

    Oxide

    275.10


    217.80

    218.80

    1.00

    4.62

    Sulfide


    AR509

    174.00

    188.40

    14.40

    3.38

    Mixed

    230.00

    50/50 Oxide - Sulfide

    including

    182.00

    182.70

    0.70

    11.60

    Sulfide


    AR510

    197.70

    209.80

    12.10

    1.51

    Oxide

    272.20


    215.80

    220.80

    5.00

    0.44

    Mixed

    40/60 Oxide - Sulfide

    AR511

    N.S.I

    413.00


    AR512

    164.40

    172.40

    8.00

    1.90

    Oxide

    293.00


    175.40

    178.40

    3.00

    0.66

    Oxide


    204.80

    220.20

    15.40

    0.76

    Mixed

    64/36 Oxide - Sulfide

    238.30

    248.30

    10.00

    0.81

    Oxide


    AR513

    N.S.I

    113.20

    Abandoned hole.

    AR514

    160.00

    213.00

    53.00

    2.46

    Mixed

    272.00

    70/30 Oxide - Sulfide

    including

    191.00

    191.80

    0.80

    11.55

    Sulfide


    AR515

    178.00

    201.70

    23.70

    1.76

    Mixed

    271.10

    62/38 Oxide - Sulfide,
    includes 0.9 meter
    isolated core loss

    AR516

    N.S.I

    289.10


    AR517

    71.50

    75.50

    4.00

    0.30

    Oxide

    250.40


    151.00

    163.90

    12.90

    3.77

    Oxide


    including

    159.00

    161.00

    2.00

    12.30

    Oxide


    AR518

    150.10

    178.40

    28.30

    2.22

    Oxide

    200.00


    AR519

    N.S.I

    85.00

    Abandoned hole.

    AR520

    N.S.I

    258.10


    AR521

    171.80

    181.80

    10.00

    0.97

    Mixed

    220.10

    53/47 Oxide - Sulfide

    AR522

    120.50

    123.50

    3.00

    0.70

    Oxide

    230.50


    AR523

    108.00

    112.00

    4.00

    0.69

    Sulfide

    246.30


    127.00

    136.60

    9.60

    1.01

    Sulfide


    AR524

    168.80

    182.10

    13.30

    3.95

    Sulfide

    209.30


    including

    175.50

    176.50

    1.00

    11.90

    Sulfide


    AR525

    211.20

    230.80

    19.60

    1.27

    Mixed

    250.80

    59/41 Oxide - Sulfide,
    includes 1.1 meter
    isolated core loss

    AR526

    206.60

    224.00

    17.40

    1.27

    Mixed

    232.00

    39/61 Oxide - Sulfide

    AR527

    122.00

    130.00

    8.00

    2.39

    Oxide

    172.60


    139.20

    144.10

    4.90

    1.65

    Oxide


    AR528

    189.00

    200.30

    11.30

    0.75

    Oxide

    226.90


    AR529

    152.00

    170.00

    18.00

    0.87

    Oxide

    210.00


    AR530

    N.S.I

    152.20

    Abandoned hole.

    AR531

    146.30

    152.30

    6.00

    0.52

    Oxide

    266.00


    AR532

    94.50

    106.20

    11.70

    1.65

    Oxide

    182.00


    109.00

    114.00

    5.00

    0.35

    Sulfide


    131.50

    135.00

    3.50

    0.60

    Mixed

    51/49 Oxide - Sulfide

    142.00

    153.00

    11.00

    0.38

    Oxide


    AR533

    16.50

    47.00

    30.50

    1.52

    Oxide

    178.00


    AR534

    92.50

    150.30

    57.80

    1.68

    Sulfide

    166.20


    AR535

    129.70

    158.40

    28.70

    1.91

    Mixed

    215.00

    73/27 Oxide - Sulfide

    162.60

    165.70

    3.10

    0.90

    Oxide


    174.40

    178.50

    4.10

    0.62

    Oxide


    AR536

    110.60

    166.40

    55.80

    2.38

    Mixed

    187.60

    56/44 Oxide - Sulfide

    including

    144.30

    145.30

    1.00

    10.30

    Sulfide



    184.60

    185.60

    1.00

    5.45

    Sulfide


    AR537

    127.50

    173.20

    45.70

    1.42

    Oxide

    230.00


    179.10

    186.30

    7.20

    2.93

    Sulfide


    AR538

    89.00

    112.70

    23.70

    3.63

    Oxide

    166.00

    98.00 - 101.40 Sulfide

    including

    90.10

    91.00

    0.90

    11.50

    Oxide


    AR539

    169.50

    196.10

    26.60

    1.61

    Sulfide

    211.20


    202.10

    206.10

    4.00

    1.39

    Sulfide


    AR540

    130.60

    164.80

    34.20

    2.78

    Oxide

    171.10


    AR541

    101.90

    117.60

    15.70

    3.29

    Mixed

    174.40

    54/46 Oxide - Sulfide

    134.70

    136.00

    1.30

    6.15

    Oxide


    AR542

    100.20

    119.00

    18.80

    3.13

    Oxide

    149.00


    including

    108.00

    109.00

    1.00

    10.35

    Oxide


    AR543

    182.80

    187.20

    4.40

    0.64

    Oxide

    223.00

    Includes 0.3 meter
    isolated core loss

    AR544

    130.30

    157.40

    27.10

    5.24

    Mixed

    192.50

    56/44 Oxide - Sulfide

    including

    138.30

    139.10

    0.80

    12.30

    Sulfide


    including

    147.00

    148.00

    1.00

    23.00

    Oxide


    AR545

    190.40

    200.00

    9.60

    1.53

    Sulfide

    275.00


    207.00

    219.00

    12.00

    0.66

    Oxide


    222.00

    226.00

    4.00

    1.97

    Mixed

    57/43 Oxide - Sulfide

    228.70

    232.80

    4.10

    0.41

    Mixed

    59/41 Oxide - Sulfide

    AR546

    87.80

    91.40

    3.60

    1.50

    Sulfide

    139.00


    AR547

    232.10

    241.00

    8.90

    1.25

    Sulfide

    347.00


    256.00

    273.20

    17.20

    1.05

    Oxide


    AR548

    185.70

    203.70

    18.00

    1.16

    Mixed

    234.90

    31/69 Oxide - Sulfide

    208.70

    223.00

    14.30

    0.41

    Oxide


    AR549

    247.20

    253.10

    5.90

    0.65

    Oxide

    321.50


    273.00

    285.00

    12.00

    0.71

    Sulfide


    AR550

    95.00

    104.70

    9.70

    0.82

    Oxide

    261.70


    142.00

    151.00

    9.00

    0.46

    Oxide


    AR551

    124.50

    146.00

    21.50

    2.51

    Oxide

    248.00

    Includes 0.5 meter
    isolated core loss

    177.00

    186.90

    9.90

    1.25

    Oxide


    AR552

    N.S.I

    391.50


    AR553

    N.S.I

    311.10


    AR554

    170.80

    200.50

    29.70

    1.60

    Oxide

    231.40

    Includes 1.4 meter
    isolated core loss

    AR555

    92.30

    99.30

    7.00

    1.20

    Oxide

    137.90


    119.80

    130.80

    11.00

    1.51

    Sulfide


    AR556

    196.10

    219.00

    22.90

    1.26

    Oxide

    237.30


    AR557

    N.S.I

    347.00


    AR558

    149.10

    176.70

    27.60

    5.20

    Mixed

    204.00

    63/37 Oxide - Sulfide,
    includes 0.7 meter
    isolated core loss

    including

    160.40

    164.60

    4.20

    13.66

    Mixed

    48/52 Oxide - Sulfide

    AR559

    246.20

    250.60

    4.40

    0.63

    Mixed

    332.30

    48/52 Oxide - Sulfide

    262.50

    265.50

    3.00

    0.61

    Sulfide


    280.00

    284.00

    4.00

    0.62

    Sulfide


    AR560

    16.50

    46.80

    30.30

    2.19

    Mixed

    98.60

    49/51 Oxide - Sulfide

    49.80

    57.10

    7.30

    1.38

    Mixed

    42/58 Oxide - Sulfide

    86.80

    95.50

    8.70

    0.70

    Oxide


    AR561

    202.00

    210.30

    8.30

    2.35

    Mixed

    259.00

    54/46 Oxide - Sulfide,
    includes 0.5 meter
    isolated core loss

    AR562

    164.20

    205.30

    41.10

    1.92

    Mixed

    256.50

    70/30 Oxide - Sulfide

    AR563

    24.00

    34.20

    10.20

    1.60

    Oxide

    130.00


    37.20

    65.60

    28.40

    1.10

    Oxide


    AR564

    251.70

    256.80

    5.10

    1.08

    Mixed

    304.00

    51/49 Oxide - Sulfide

    AR565

    231.00

    234.00

    3.00

    0.96

    Oxide

    330.60


    AR566

    2.70

    41.00

    38.30

    1.65

    Mixed

    107.50

    75/25 Oxide - Sulfide

    43.90

    52.00

    8.10

    0.93

    Oxide


    AR567

    162.40

    167.00

    4.60

    0.33

    Oxide

    230.00


    AR568

    160.20

    167.00

    6.80

    0.49

    Oxide

    258.40


    217.80

    220.80

    3.00

    2.51

    Oxide


    226.10

    229.10

    3.00

    0.67

    Oxide


    AR569

    81.40

    111.80

    30.40

    2.63

    Oxide

    143.50

    Includes 0.8 meter
    isolated core loss

    including

    105.20

    106.20

    1.00

    10.30

    Sulfide


    AR570

    145.00

    150.40

    5.40

    5.73

    Mixed

    269.20

    46/54 Oxide - Sulfide

    including

    145.00

    145.80

    0.80

    11.40

    Oxide



    157.40

    166.00

    8.60

    4.00

    Sulfide


    including

    164.00

    165.00

    1.00

    14.10

    Sulfide



    175.00

    204.60

    29.60

    1.60

    Mixed

    59/41 Oxide - Sulfide

    208.70

    224.80

    16.10

    1.93

    Mixed

    52/48 Oxide - Sulfide

    AR571

    94.00

    116.80

    22.80

    1.34

    Oxide

    125.50


    AR572

    197.30

    202.30

    5.00

    0.39

    Oxide

    300.00


    206.60

    215.60

    9.00

    0.64

    Oxide

    Includes 0.5 meter
    isolated core loss

    270.00

    276.00

    6.00

    0.35

    Oxide


    AR573

    189.70

    201.10

    11.40

    3.22

    Mixed

    277.70

    38/62 Oxide - Sulfide

    211.40

    215.00

    3.60

    1.98

    Sulfide


    221.70

    225.70

    4.00

    0.58

    Sulfide


    232.80

    240.50

    7.70

    0.85

    Mixed

    48/52 Oxide - Sulfide

    AR574

    N.S.I

    185.80


    AR575

    N.S.I

    184.60


    AR576

    151.00

    165.00

    14.00

    0.55

    Oxide

    179.10

    Includes 0.3 meter
    isolated core loss

    AR577

    161.60

    166.80

    5.20

    1.64

    Oxide

    169.80


    AR578

    N.S.I

    114.50







    Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in Table 1. All
    thicknesses are down hole length and true widths are not known at this stage.




    Supporting Drilling Information to SSR Mining Announcement
    This document provides supporting drill collar locations and composite assay results for the Çakmaktepe Extension drilling program referenced in the announcement "SSR Mining Announces Positive Exploration Results for the Çakmaktepe Extension Project (Ardich), including 28.3 meters at 8.23 g/t Au", October 5, 2022.

    Drill collar locations are surveyed in UTM Zone 37N, ED50 grid using differential GPS in units of meters. All drilling was diamond core drilling with HQ and PQ core sizes. HQ is 63.5mm and PQ is 85 mm in diameter.



    Table 3: Drill Collar Coordinates

    Hole ID

    Easting

    Northing

    Elevation

    Azimuth

    Dip

    End of Hole

    (m)

    AR428

    463406.97

    4366890.30

    1228.47

    220

    -80

    229.40

    AR429

    463626.30

    4366351.00

    1289.18

    250

    -70

    196.40

    AR430

    463203.05

    4366569.49

    1347.97

    220

    -60

    173.00

    AR431

    462809.30

    4367110.00

    1310.39

    220

    -70

    149.70

    AR432

    463694.60

    4367227.00

    1208.49

    0

    -90

    334.50

    AR433

    463122.90

    4367255.00

    1216.10

    260

    -80

    125.50

    AR434

    463203.60

    4366569.00

    1348.78

    0

    -90

    164.80

    AR435

    463310.20

    4366901.00

    1250.25

    220

    -65

    250.00

    AR436

    463448.20

    4366337.00

    1338.24

    220

    -80

    183.50

    AR437

    463562.97

    4366361.42

    1293.26

    220

    -80

    206.00

    AR438

    463203.62

    4366569.18

    1347.87

    40

    -70

    224.40

    AR439

    463706.62

    4366475.35

    1293.01

    220

    -70

    184.10

    AR440

    463645.36

    4367257.19

    1200.95

    60

    -70

    321.90

    AR441

    464224.06

    4366590.32

    1355.88

    340

    -75

    257.50

    AR442

    463125.30

    4366698.97

    1337.58

    220

    -60

    176.00

    AR443

    463513.81

    4366801.55

    1214.09

    220

    -60

    211.70

    AR444

    463438.27

    4366862.91

    1221.73

    230

    -80

    240.30

    AR445

    463446.59

    4366407.43

    1313.96

    0

    -90

    198.00

    AR446

    463718.80

    4366612.80

    1273.34

    310

    -80

    280.90

    AR447

    463353.16

    4367401.06

    1139.47

    100

    -60

    146.10

    AR448

    464224.02

    4366588.74

    1355.93

    85

    -75

    254.50

    AR449

    463750.86

    4366659.63

    1251.62

    165

    -80

    111.00

    AR450

    463365.60

    4366514.00

    1307.50

    0

    -90

    153.80

    AR451

    463644.90

    4367257.00

    1201.07

    0

    -90

    286.00

    AR452

    463677.87

    4366570.96

    1271.93

    320

    -80

    254.90

    AR453

    463471.28

    4367443.96

    1107.31

    215

    -65

    218.40

    AR454

    463387.54

    4366949.65

    1226.61

    110

    -85

    198.00

    AR455

    463397.19

    4366579.15

    1278.35

    0

    -90

    153.50

    AR456

    463719.41

    4366876.41

    1222.67

    75

    -70

    200.80

    AR457

    463644.92

    4367257.72

    1201.54

    240

    -80

    312.00

    AR458

    464096.64

    4366539.01

    1354.38

    130

    -85

    238.30

    AR459

    463257.50

    4366689.00

    1293.08

    0

    -90

    161.00

    AR460

    463468.10

    4367446.00

    1107.48

    260

    -70

    260.00

    AR461

    463637.00

    4366678.00

    1238.55

    100

    -70

    201.80

    AR462

    463170.90

    4366786.00

    1299.73

    0

    -90

    165.20

    AR463

    463663.50

    4366496.00

    1271.22

    40

    -80

    119.30

    AR464

    463697.70

    4367224.00

    1207.58

    240

    -70

    320.00

    AR465

    463464.40

    4367479.00

    1108.93

    0

    -90

    272.80

    AR466

    463916.80

    4366525.00

    1354.33

    170

    -80

    269.50

    AR467

    463367.40

    4366855.00

    1242.21

    150

    -85

    275.40

    AR468

    463334.30

    4366687.00

    1270.36

    220

    -70

    159.80

    AR469

    463664.20

    4366495.00

    1270.93

    40

    -80

    96.50

    AR470

    463786.50

    4367198.00

    1210.99

    280

    -80

    293.30

    AR471

    463999.30

    4366911.00

    1240.24

    25

    -75

    131.00

    AR472

    463405.20

    4366660.00

    1259.31

    220

    -70

    207.50

    AR473

    463511.90

    4367504.00

    1131.69

    270

    -85

    265.00

    AR474

    464066.90

    4366658.00

    1307.14

    150

    -75

    182.60

    AR475

    463999.00

    4366481.00

    1362.56

    0

    -90

    262.00

    AR476

    463646.40

    4366620.00

    1250.82

    220

    -70

    226.50

    AR477

    463787.00

    4367198.00

    1212.78

    0

    -90

    271.20

    AR478

    463575.00

    4367457.00

    1153.95

    15

    -80

    100.00

    AR479

    463576.00

    4367454.00

    1154.11

    240

    -70

    288.20

    AR480

    463971.90

    4366457.00

    1376.60

    270

    -75

    302.00

    AR481

    463630.80

    4366431.00

    1266.54

    0

    -80

    247.70

    AR482

    463444.90

    4366798.00

    1225.07

    0

    -75

    212.30

    AR483

    463633.92

    4366564.01

    1255.45

    0

    -90

    250.00

    AR484

    463532.00

    4367452.17

    1134.93

    250

    -80

    316.60

    AR485

    464207.90

    4366747.46

    1305.24

    50

    -75

    242.40

    AR486

    463622.90

    4366517.00

    1252.46

    270

    -70

    254.00

    AR487

    463543.36

    4367395.39

    1146.03

    70

    -80

    309.30

    AR488

    463444.99

    4366797.94

    1224.85

    0

    -90

    195.50

    AR489

    463691.45

    4366430.99

    1296.49

    80

    -80

    208.40

    AR490

    463453.94

    4367535.60

    1104.37

    270

    -85

    293.00

    AR491

    464206.31

    4366746.34

    1305.52

    0

    -90

    240.00

    AR492

    463623.09

    4366516.75

    1252.78

    0

    -90

    214.20

    AR493

    463362.63

    4366930.88

    1234.71

    0

    -90

    130.00

    AR494

    463633.44

    4367321.20

    1189.82

    220

    -80

    331.60

    AR495

    463674.92

    4366293.49

    1313.76

    300

    -85

    268.40

    AR496

    464381.46

    4366585.90

    1387.01

    325

    -75

    213.00

    AR497

    463967.10

    4366379.94

    1416.48

    0

    -90

    288.30

    AR498

    463319.29

    4366953.76

    1236.76

    0

    -90

    260.60

    AR499

    464270.03

    4366504.13

    1414.42

    290

    -70

    270.00

    AR500

    463632.38

    4367323.29

    1189.77

    140

    -80

    278.00

    AR501

    463916.04

    4366406.52

    1397.62

    180

    -80

    275.50

    AR502

    463807.60

    4366453.00

    1341.48

    30

    -75

    223.50

    AR503

    463494.70

    4366536.00

    1266.12

    0

    -90

    230.10

    AR504

    463599.06

    4367386.15

    1166.95

    150

    -80

    310.60

    AR505

    463721.11

    4367194.86

    1209.65

    0

    -90

    305.10

    AR506

    462981.76

    4366851.67

    1329.50

    220

    -70

    302.00

    AR507

    463693.43

    4367392.53

    1168.57

    0

    -90

    331.60

    AR508

    463695.94

    4367226.34

    1207.55

    180

    -80

    275.10

    AR509

    463456.19

    4366739.72

    1234.36

    220

    -75

    230.00

    AR510

    463646.26

    4367260.31

    1200.87

    150

    -80

    272.20

    AR511

    463541.67

    4367549.90

    1140.02

    0

    -90

    413.00

    AR512

    463808.25

    4366452.40

    1341.47

    30

    -75

    293.00

    AR513

    463611.00

    4366625.91

    1238.29

    0

    -90

    113.20

    AR514

    463513.90

    4366801.00

    1213.94

    70

    -60

    272.00

    AR515

    463637.90

    4366676.67

    1240.33

    255

    -85

    271.10

    AR516

    463326.10

    4367532.00

    1111.68

    70

    -75

    289.10

    AR517

    463955.50

    4366561.00

    1334.01

    175

    -70

    250.40

    AR518

    463512.90

    4366801.00

    1214.52

    0

    -90

    200.00

    AR519

    463610.74

    4366627.26

    1238.07

    0

    -90

    85.00

    AR520

    463292.37

    4366801.79

    1267.84

    0

    -90

    258.10

    AR521

    463565.04

    4366632.93

    1229.64

    0

    -90

    220.10

    AR522

    463380.58

    4366789.44

    1243.04

    220

    -60

    230.50

    AR523

    463330.83

    4367529.71

    1111.64

    190

    -75

    246.30

    AR524

    463574.34

    4366689.71

    1218.68

    310

    -80

    209.30

    AR525

    463379.92

    4366792.76

    1242.88

    130

    -80

    250.80

    AR526

    463439.58

    4366860.74

    1221.77

    230

    -70

    232.00

    AR527

    463747.05

    4366662.50

    1251.67

    120

    -70

    172.60

    AR528

    463457.05

    4366736.25

    1234.37

    130

    -85

    226.90

    AR529

    463461.16

    4366674.39

    1245.71

    220

    -85

    210.00

    AR530

    463610.64

    4366623.67

    1236.68

    220

    -70

    152.20

    AR531

    463532.91

    4366679.31

    1230.09

    220

    -60

    266.00

    AR532

    463016.51

    4367076.87

    1257.68

    100

    -80

    182.00

    AR533

    463058.53

    4367180.64

    1235.00

    180

    -75

    178.00

    AR534

    463201.32

    4367121.17

    1222.92

    180

    -70

    166.20

    AR535

    463280.05

    4367015.82

    1223.11

    60

    -80

    215.00

    AR536

    463477.17

    4366900.98

    1208.45

    190

    -80

    187.60

    AR537

    463279.72

    4367015.51

    1224.76

    0

    -90

    230.00

    AR538

    463425.49

    4366995.89

    1209.03

    320

    -70

    166.00

    AR539

    463211.19

    4367051.72

    1228.43

    170

    -70

    211.20

    AR540

    463494.73

    4366937.87

    1199.80

    80

    -75

    171.10

    AR541

    463173.31

    4367080.70

    1231.37

    170

    -80

    174.40

    AR542

    463466.47

    4366967.77

    1203.15

    270

    -70

    149.00

    AR543

    463101.94

    4367008.63

    1256.26

    70

    -80

    223.00

    AR544

    463466.51

    4366967.55

    1203.14

    200

    -70

    192.50

    AR545

    463599.73

    4367384.47

    1167.10

    160

    -70

    275.00

    AR546

    463200.72

    4366879.28

    1268.55

    0

    -90

    139.00

    AR547

    463633.92

    4367326.89

    1189.51

    30

    -80

    347.00

    AR548

    463365.39

    4366926.56

    1234.88

    245

    -80

    234.90

    AR549

    463599.65

    4367384.92

    1167.10

    0

    -90

    321.50

    AR550

    463181.36

    4366945.17

    1253.00

    0

    -90

    261.70

    AR551

    463386.79

    4366953.26

    1227.06

    220

    -80

    248.00

    AR552

    463637.43

    4367433.91

    1162.55

    0

    -90

    391.50

    AR553

    463598.63

    4367385.80

    1166.81

    70

    -80

    311.10

    AR554

    463331.29

    4366952.67

    1236.52

    250

    -75

    231.40

    AR555

    463245.81

    4367158.41

    1215.91

    0

    -90

    137.90

    AR556

    463406.18

    4366889.57

    1228.72

    260

    -80

    237.30

    AR557

    463767.05

    4367318.34

    1186.95

    0

    -90

    347.00

    AR558

    463515.92

    4366801.68

    1214.02

    300

    -80

    204.00

    AR559

    463552.32

    4367485.48

    1144.85

    255

    -75

    332.30

    AR560

    463440.74

    4367084.39

    1185.98

    0

    -90

    98.60

    AR561

    463457.84

    4366734.98

    1233.88

    320

    -80

    259.00

    AR562

    463514.60

    4366746.42

    1222.47

    45

    -75

    256.50

    AR563

    463364.42

    4367107.39

    1195.39

    120

    -80

    130.00

    AR564

    463592.79

    4367429.80

    1160.64

    260

    -80

    304.00

    AR565

    463834.03

    4367236.63

    1202.73

    0

    -90

    330.60

    AR566

    463426.46

    4367118.89

    1182.99

    330

    -80

    107.50

    AR567

    463942.64

    4366963.15

    1229.19

    300

    -80

    230.00

    AR568

    463888.43

    4367030.40

    1213.80

    280

    -75

    258.40

    AR569

    463478.76

    4367057.23

    1186.27

    60

    -60

    143.50

    AR570

    463545.41

    4367395.11

    1146.72

    0

    -90

    269.20

    AR571

    463193.14

    4367182.33

    1217.94

    0

    -90

    125.50

    AR572

    463758.99

    4367243.70

    1204.85

    0

    -90

    300.00

    AR573

    463672.52

    4367242.06

    1205.12

    240

    -80

    277.70

    AR574

    463345.84

    4367577.95

    1097.15

    255

    -80

    185.80

    AR575

    463899.11

    4366966.44

    1223.68

    20

    -70

    184.60

    AR576

    463931.27

    4367014.17

    1219.88

    0

    -70

    179.10

    AR577

    463812.25

    4366895.75

    1227.52

    50

    -90

    169.80

    AR578

    463997.63

    4366807.88

    1260.67

    350

    -85

    114.50




    SOURCE SSR Mining Inc.