SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (168901)12/5/2022 2:59:23 PM
From: LoneClone  Read Replies (1) | Respond to of 192593
 
Fortuna increases Sunbird Resource and identifies new regional prospects at Séguéla, Côte d´Ivoire

ca.finance.yahoo.com

Fortuna Silver Mines Inc.
Mon, December 5, 2022 at 2:00 a.m.·16 min read

Figure 1



Sunbird Deposit long-section looking west showing recent drilling results. Note the southerly plunge aspect to the high-grade mineralization that remains open at depth.
Figure 2



Sunbird Deposit cross-section 892865mN (looking north). Note the high-grade mineralization remains open at depth.
Figure 3


Sunbird Deposit cross-section 892775mN (looking north). Note the high-grade mineralization remains open at depth.
Figure 4



Séguéla Project regional plan showing recent drilling results

VANCOUVER, British Columbia, Dec. 05, 2022 (GLOBE NEWSWIRE) -- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) is pleased to provide an update on its exploration program at the Séguéla gold Project located in Côte d’Ivoire. Sunbird´s new resource estimation is in addition to Séguéla’s current Mineral Reserves of 12.1 Mt averaging 2.80 g/t Au containing 1.09 Moz (refer to Fortuna´s news release dated March 17, 2022).

Paul Weedon, Senior Vice President of Exploration at Fortuna, commented, “Drilling at Séguéla has continued to highlight the exploration potential of the project including the definition of a maiden Indicated Mineral Resource and a substantial increase in the Inferred Mineral Resource at the Sunbird Deposit. Successful regional exploration work has identified two new prosects, at Barana and Badior, and additional high-grade results from Kestrel.” Mr. Weedon continued, “Ongoing extension drilling at Sunbird continues to expand the mineralized footprint, extending the southern high-grade shoot a further 75 meters along strike with drill hole SGDD109 intersecting 10.2 g/t gold over a true width of 9.1 meters and drill hole SGDD110 intersecting 10.2 g/t gold over a true width of 7.0 meters. Additionally, drilling has also confirmed the continuity of mineralization between the central and southern high-grade shoots, with intersections such as drill hole SGDD106 intersecting 6.5 g/t gold over a true width of 15.4 meters.” Mr. Weedon concluded, “Regional exploration drilling has advanced two new discoveries, Barana and Badior, with results including 11.5 g/t gold over a true width of 15.4 meters from drill hole SGRC1521 at Badior. Furthermore, continued exploration at the previously identified Kestrel Prospect has extended mineralization an additional 200 meters along strike with highlights including 20.3 g/t gold over a true width of 3.5 meters from drill hole SGRC1537.”

Sunbird Deposit Mineral Resource

Exploration drilling at Sunbird since the release of the maiden Inferred Mineral Resource (refer to Fortuna news releases dated March 15, 2022, June 7, 2022, and September 12, 2022) has resulted in an upgraded estimate, including a maiden Indicated Mineral Resource of 3.2 million tonnes at an average grade of 2.74 g/t gold containing 279,000 ounces and an Inferred Mineral Resource of 4.2 million tonnes at an average grade of 3.74 g/t gold containing 506,000 ounces (refer to Table 1).

Table 1. Sunbird Mineral Resources

Mineral Resources Measured, Indicated and Inferred

Property

Classification

Tonnes
(000)

Au
(g/t)

Au
(koz)

Sunbird Deposit

Measured

-

-

-

Indicated

3,260,000

2.74

279,000

Inferred

4,219,000

3.74

506,000


Notes:

  • Mineral Reserves and Mineral Resources are as defined by the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves

  • Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

  • Factors that could materially affect the reported Mineral Resources include changes in metal price and exchange rate assumptions; changes in local interpretations of mineralization; changes to assumed metallurgical recoveries, overall slope angles, mining dilution and recovery used to generate the pit design; and assumptions as to the continued ability to access the site, retain mineral and surface rights titles, maintain environmental and other regulatory permits, and maintain the social license to operate at Séguéla

  • Mineral Resources are estimated and reported as of November 21, 2022

  • Mineral Resources are reported in-situ constrained within an optimized pit shell at a cut-off grade of 0.45 g/t Au based on an assumed gold price of $1,700/oz, metallurgical recovery rate of 94.5%, mining cost of $3.04/t, processing and G&A costs of $21.44/t, and refining/selling costs including state and third-party royalties of $113.64/oz Au. The pit design was completed based on overall slope angle of 36. 8° for oxide material, 44.2° for transitional material and 53.3° for fresh material.

  • Matthew Cobb is the Qualified Person responsible for Mineral Resources, being an employee of Roxgold Inc.

  • Totals may not add due to rounding procedures


  • This upgraded Mineral Resource estimate incorporates an additional 41 diamond and reverse circulation drill holes totaling 14,520 meters to the maiden Inferred Mineral Resource, all of which were drilled by Fortuna during 2022. The estimation methodology was consistent with that set out in the Fortuna news release dated March 15, 2022.

    Sunbird Deposit drill highlights include:

  • SGRD1410: 4.1 g/t gold over an estimated true width of 23.1 meters from 325 meters

  • SGDD106: 6.5 g/t gold over an estimated true width of 15.4 meters from 413 meters

  • SGDD107: 6.0 g/t gold over an estimated true width of 11.2 meters from 420 meters

  • SGDD109: 10.2 g/t gold over an estimated true width of 9.1 meters from 141 meters

  • SGDD110: 10.2 g/t gold over an estimated true width of 7.0 meters from 279 meters

  • Drilling further down-dip and along strike at Sunbird has continued to intersect high-grade mineralization beyond the previously reported intersections (refer to Fortuna news release dated September 12, 2022), extending drill defined mineralization associated with the central high grade core a further 150 meters down-plunge where it remains open at depth, approximately 400 meters below surface (refer to Figure 1).

    Recent drilling has also shown that the two main high-grade ore shoots, which previously were modeled as separate shoots, are part of a continuous lode with a strike length of at least 700 meters, further reinforcing the potential for underground mining at Sunbird. Drilling will continue throughout the fourth quarter of 2022 to test the projected extensions at depth, with infill drilling to reduce drill hole spacing to further improve resource confidence planned for the first quarter of 2023.

    Drilling on the upper southern margins of the southern high-grade core has extended mineralization an additional 75 meters to the south, with drill hole SGDD109 intersecting 10.2 g/t gold over a true width of 9.1 meters, remaining open along strike to the south as well as down-plunge. Sunbird´s mineralization consists of a set of near vertical quartz dominant veins demonstrating good continuity down-dip and along strike, reflecting the strong structural control present; consistent with the majority of the deposits drilled at Séguéla to date (refer to Figures 2 and 3). Refer to Appendix 1 for full results received for this recent 12-hole, 4,062-meter drill program.


    Figure 1:
    Sunbird Deposit long-section looking west showing recent drilling results. Note the southerly plunge aspect to the high-grade mineralization that remains open at depth.



    Sunbird Deposit long-section looking west showing recent drilling results. Note the southerly plunge aspect to the high-grade mineralization that remains open at depth.

    globenewswire.com


    Figure 2:
    Sunbird Deposit cross-section 892865mN (looking north). Note the high-grade mineralization remains open at depth.



    Sunbird Deposit cross-section 892865mN (looking north). Note the high-grade mineralization remains open at depth.

    globenewswire.com


    Figure 3:
    Sunbird Deposit cross-section 892775mN (looking north). Note the high-grade mineralization remains open at depth.



    Sunbird Deposit cross-section 892775mN (looking north). Note the high-grade mineralization remains open at depth.

    globenewswire.com


    Séguéla Project Regional Exploration


    New Discovery: Badior Prospect

    A 9-hole, 936-meter reconnaissance reverse circulation (RC) program was completed at Badior, a new prospect identified approximately 7 kilometers north of the Séguéla processing plant (refer to Figure 4).

    Badior Prospect drill highlights include:

  • SGRC1521: 11.5 g/t gold over an estimated true width of 15.4 meters from 105 meters

  • SGRC1524: 12.0 g/t gold over an estimated true width of 8.4 meters from 36 meters

  • SGRC1526: 4.2 g/t gold over an estimated true width of 9.1 meters from 144 meters

  • Drilling was designed to test a discrete gold-in-soil anomaly, which returned several very encouraging intersections along a 250-meter strike, including 11.5 g/t gold over a true width of 15.4 meters from 105 meters in drill hole SGRC1521 and 12.0 g/t gold over a true width of 8.4 meters from 36 meters in drill hole SGRC1524. Logging of the drill chips has shown mineralization and alteration is hosted in a similar lithology package as that which hosts the Antenna deposit. Mineralization remains open at depth and along strike to the south, with additional drilling planned for early 2023. Refer to Appendix 2 for full results.

    New Discovery: Barana Prospect

    A 7-hole, 887-meter reconnaissance RC program was completed at Barana, located approximately 8 kilometers north of the Séguéla processing plant (refer to Figure 4) and 1 kilometer away from the Badior prospect.

    Barana Prospect drill highlights include:

  • SGRC1531: 2.3 g/t gold over an estimated true width of 5.6 meters from 86 meters

  • SGRC1533: 4.1 g/t gold over an estimated true width of 4.9 meters from 64 meters

  • Drilling was designed to test an extensive 1-kilometer long gold-in-soil anomaly, which returned several very encouraging intersections along a 750-meter strike, including 4.1 g/t gold over a true width of 4.9 meters from 64 meters in drill hole SGRC1533. Mineralization remains open at depth and along strike to the north and south. Logging of the drill chips has shown mineralization and alteration is hosted in a similar lithology package as that which hosts Antenna. Refer to Appendix 3 for full results.

    Kestrel Prospect Drill Results

    Following on from the initial Kestrel drilling program (refer to Fortuna news release dated September 12, 2022), a 10-hole, 1,262-meter RC program was completed at Kestrel (refer to Figure 4).

    Kestrel Prospect drill highlights include:

  • SGRC1536: 4.2 g/t gold over an estimated true width of 5.6 meters from 159 meters

  • SGRC1537: 20.3 g/t gold over an estimated true width of 3.5 meters from 164 meters

  • Mineralization has been defined along a 200-meter strike, with a central high-grade core reflecting a similar structural setting as that at Koula and Sunbird, and where it remains open at depth. Kestrel is hosted in the same lithological package that hosts the Koula, Sunbird and Ancien deposits. Refer to Appendix 4 for full results.


    Figure 4:
    Séguéla Project regional plan showing recent drilling results



    Séguéla Project regional plan showing recent drilling results

    globenewswire.com


    Quality Assurance & Quality Control (QA-QC)

    All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

    All RC drilling at Séguéla used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5% representative sample for submission to the analytical laboratory. The residual 87.5% samples were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the company-controlled core yard.

    All diamond drilling (DD) drill holes at Séguéla were drilled with HQ sized diamond drill bits. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the company core yard at the project site. The other half was sampled, catalogued and placed into sealed bags and securely stored at the site until shipment.

    All Séguéla RC and DD core samples were shipped to ALS Laboratories’ preparation laboratory in Yamoussoukro for preparation and then, via commercial courier, to ALS’s facility in Ouagadougou, Burkina Faso for finishing. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed for all Séguéla samples. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the ALS laboratory inserted its own quality control samples.

    Qualified Person

    Paul Weedon, Senior Vice President of Exploration for Fortuna Silver Mines Inc., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon has verified the data disclosed, and the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

    About Fortuna Silver Mines Inc.

    Fortuna Silver Mines Inc. is a Canadian precious metals mining company with four operating mines in Argentina, Burkina Faso, Mexico and Peru, and a fifth mine under construction in Côte d'Ivoire. Sustainability is integral to all our operations and relationships. We produce gold and silver and generate shared value over the long-term for our stakeholders through efficient production, environmental protection, and social responsibility. For more information, please visit our website.

    ON BEHALF OF THE BOARD

    Jorge A. Ganoza
    President, CEO and Director
    Fortuna Silver Mines Inc.

    Investor Relations:
    Carlos Baca | info@fortunasilver.com | Twitter: @Fortuna_Silver | LinkedIn: fortunasilvermines

    Forward looking Statements

    This news release contains forward looking statements which constitute “forward looking information” within the meaning of applicable Canadian securities legislation and “forward looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward looking Statements”). All statements included herein, other than statements of historical fact, are Forward looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward looking Statements. The Forward looking Statements in this news release may include, without limitation, statements about the Company’s plans for the Séguéla gold Project and mineral properties, including the Sunbird deposit and other areas of mineralization at Séguéla; the anticipated exploration and other development programs at the Sunbird deposit and at other mineral prospects and areas at the Séguéla gold Project, together with the investment, nature, implementation and timing thereof; the timing for, and anticipated results of the exploration programs at the Séguéla gold Project, and the intention to expand mineralization at the Séguéla gold Project; the Company’s business strategy, plans and outlook; the merit of the Company’s mines and mineral properties; mineral resource and reserve estimates; timelines; the future financial or operating performance of the Company; expenditures; approvals and other matters. Often, but not always, these Forward looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.

    Forward looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; the duration and effects of the COVID-19 pandemic on our operations and workforce and the effects on the global economy and society; changes in prices for silver, gold and other metals; the timing of the Company’s proposed exploration programs at the Sunbird deposit and at the Séguéla gold Project in general; the success of the Company’s proposed exploration programs; technological and operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; fluctuations in prices for energy, labor, materials, supplies and services; fluctuations in currencies; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; our ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; governmental and other approvals; political unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

    Forward looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to expectations regarding the results from the exploration programs conducted at the Séguéla gold Project; expected trends in mineral prices and currency exchange rates; the accuracy of the Company’s information derived from its exploration programs at the Séguéla gold Project; current mineral resource and reserve estimates; the presence and continuity of mineralization at the Séguéla gold Project; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained; that there will be no significant disruptions affecting operations and such other assumptions as set out herein. Forward looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that Forward looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward looking Statements.

    Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

    Reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves.

    Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.


    APPENDIX 1.
    Sunbird Deposit drill results, Séguéla gold Project, Côte d’Ivoire

    HoleID

    Easting (WGS84_29N)

    Northing (WGS84_29N)

    Elevation (m)

    EOH Depth
    (m)

    UTM Azimuth

    Dip

    Depth From (m)

    Depth To (m)

    Downhole Interval (m)

    EST1
    (m)

    Au (ppm)

    Hole Type2

    SGRD1410

    742619

    892864

    540

    389.5

    90

    -60

    325

    358

    33

    23.1

    4.1

    RCD













    incl

    349

    350

    1

    0.7

    22.7

    RCD













    and

    354

    355

    1

    0.7

    39.3

    RCD













    and

    356

    357

    1

    0.7

    17.8

    RCD

    SGDD104

    742505

    892785

    534

    550.3

    90

    -60

    NSI3









    DD

    SGDD105

    742545

    892610

    560

    480.3

    90

    -60

    125

    128

    3

    2.1

    2.7

    DD















    413

    435

    22

    15.4

    1.8

    DD













    incl

    418

    419

    1

    0.7

    10.5

    DD

    SGDD106

    742550

    892735

    550

    450.4

    90

    -60

    370

    371

    1

    0.7

    7.3

    DD















    413

    435

    22

    15.4

    6.5

    DD













    incl

    429

    432

    3

    2.1

    22.8

    DD

    SGDD107

    742540

    892785

    543

    477.9

    90

    -60

    365

    366

    1

    0.7

    6.6

    DD















    420

    436

    16

    11.2

    6.0

    DD













    incl

    427

    428

    1

    0.7

    49.1

    DD

    SGDD108

    742690

    892660

    547

    150.6

    90

    -60

    NSI3









    DD

    SGDD109

    742645

    892610

    566

    222.4

    90

    -60

    141

    154

    13

    9.1

    10.2

    DD













    incl

    149

    154

    5

    3.5

    23.7

    DD

    SGDD110

    742590

    892560

    574

    321.5

    90

    -60

    225

    237

    12

    8.4

    2.4

    DD















    279

    289

    10

    7

    10.2

    DD













    incl

    281

    283

    2

    1.4

    36.4

    DD













    and

    285

    286

    1

    0.7

    14.2

    DD

    SGDD111

    742600

    892810

    553

    44

    90

    -60

    Not sampled

    Hole abandoned







    DD

    SGDD112

    742600

    892810

    553

    350.4

    90

    -60

    295

    300

    5

    3.5

    1.2

    DD















    309

    310

    1

    0.7

    13.6

    DD

    SGDD113

    742620

    892860

    541

    300.5

    90

    -60

    266

    281

    15

    10.5

    2.0

    DD













    incl

    279

    280

    1

    0.7

    13.3

    DD

    SGDD114

    742630

    892910

    530

    324.5

    90

    -60

    84

    86

    2

    1.4

    3.7

    DD















    283

    286

    3

    2.1

    3.2

    DD















    292

    298

    6

    4.2

    9.9

    DD













    incl

    296

    297

    1

    0.7

    25.6

    DD


    Notes:

  • EST: Estimated true width

  • RCD: Reserve circulation with diamond tail | DD: Diamond drilling

  • NSI: No significant intercepts


  • APPENDIX 2.
    Badior Prospect drill results, Séguéla gold Project, Côte d’Ivoire

    HoleID

    Easting (WGS84_29N)

    Northing (WGS84_29N)

    Elevation (m)

    EOH Depth
    (m)

    UTM Azimuth

    Dip

    Depth From (m)

    Depth To (m)

    Downhole Interval (m)

    EST1
    (m)

    Au (ppm)

    Hole Type2

    SGRC1518

    743118

    902000

    387

    60

    270

    -60

    NSI3









    RC

    SGRC1519

    743145

    902000

    385

    120

    270

    -60

    NSI3









    RC

    SGRC1520

    743062

    901901

    388

    67

    270

    -60

    NSI3









    RC

    SGRC1521

    743096

    901901

    387

    127

    270

    -60

    43

    46

    3

    2.1

    11.6

    RC













    incl

    44

    46

    2

    1.4

    16.8

    RC















    105

    127

    22

    15.4

    11.5

    RC













    incl

    107

    108

    1

    0.7

    26.0

    RC













    and

    111

    112

    1

    0.7

    15.5

    RC













    and

    114

    118

    4

    2.8

    40.7

    RC

    SGRC1522

    743170

    902101

    382

    60

    270

    -60

    NSI3









    RC

    SGRC1523

    743201

    902100

    379

    103

    270

    -60

    NSI3









    RC

    SGRC1524

    743060

    901799

    389

    128

    270

    -60

    36

    48

    12

    8.4

    12.0

    RC













    incl

    36

    37

    1

    0.7

    14.8

    RC













    and

    44

    47

    3

    2.1

    40.9

    RC

    SGRC1525

    743011

    901800

    389

    103

    270

    -60

    NSI3









    RC

    SGRC1526

    743108

    901801

    387

    168

    270

    -60

    144

    157

    13

    9.1

    4.2

    RC













    incl

    145

    146

    1

    0.7

    10.7

    RC













    and

    147

    148

    1

    0.7

    12.4

    RC


    Notes:

  • EST: Estimated true width

  • RC: Reverse circulation

  • NSI: No significant intercepts


  • APPENDIX 3.
    Barana Prospect drill results, Séguéla gold Project, Côte d’Ivoire

    HoleID

    Easting (WGS84_29N)

    Northing (WGS84_29N)

    Elevation (m)

    EOH Depth
    (m)

    UTM Azimuth

    Dip

    Depth From (m)

    Depth To (m)

    Downhole Interval (m)

    EST1
    (m)

    Au (ppm)

    Hole Type2

    SGRC1527

    743754

    903600

    376

    120

    270

    -60

    NSI3









    RC

    SGRC1528

    743707

    903200

    383

    120

    270

    -60

    2

    7

    5

    3.5

    1.5

    RC

    SGRC1529

    743750

    903200

    385

    120

    270

    -60

    87

    90

    3

    2.1

    4.1

    RC

    SGRC1530

    743671

    902800

    373

    121

    270

    -60

    8

    14

    6

    4.2

    2.6

    RC

    SGRC1531

    743722

    902800

    374

    120

    270

    -60

    40

    44

    4

    2.8

    2.2

    RC















    56

    60

    4

    2.8

    1.4

    RC















    86

    94

    8

    5.6

    2.3

    RC

    SGRC1532

    743901

    902090

    378

    151

    270

    -60

    NSI3









    RC

    SGRC1533

    743779

    902551

    367

    135

    270

    -60

    64

    71

    7

    4.9

    4.1

    RC













    incl

    66

    68

    2

    1.4

    12.0

    RC


    Notes:

  • EST: Estimated true width

  • RC: Reverse circulation

  • NSI: No significant intercepts


  • APPENDIX 4.
    Kestrel Prospect drill results, Séguéla gold Project, Côte d’Ivoire

    HoleID

    Easting (WGS84_29N)

    Northing (WGS84_29N)

    Elevation (m)

    EOH Depth
    (m)

    UTM Azimuth

    Dip

    Depth From (m)

    Depth To (m)

    Downhole Interval (m)

    EST1
    (m)

    Au (ppm)

    Hole Type2

    SGRC1534

    742009

    893950

    436

    60

    270

    -55

    NSI3









    RC

    SGRC1535

    742038

    893951

    435

    109

    270

    -55

    92

    94

    2

    1.4

    2.5

    RC

    SGRD1536

    742056

    893851

    435

    174.4

    270

    -55

    159

    167

    8

    5.6

    4.2

    RCD













    incl

    160

    161

    1

    0.7

    10.2

    RCD

    SGRD1537

    742058

    893749

    440

    190.5

    270

    -55

    164

    169

    5

    3.5

    20.3

    RCD













    incl

    164

    165

    1

    0.7

    100.5

    RCD

    SGRC1538

    741991

    893749

    443

    70

    270

    -55

    NSI3









    RC

    SGRD1539

    742025

    893749

    443

    130.3

    270

    -55

    NSI3









    RCD

    SGRC1540

    742017

    893847

    437

    100

    270

    -55

    NSI3









    RC

    SGRC1541

    741992

    893849

    441

    67

    270

    -55

    24

    27

    3

    2.1

    4.5

    RC

    SGRD1542

    742068

    893899

    430

    180.4

    270

    -55

    NSI3









    RCD

    SGRD1543

    742060

    893797

    440

    180.4

    270

    -55

    171

    173

    2

    1.4

    3.3

    RCD


    Notes:

  • EST: Estimated true width

  • RC: Reverse circulation | RCD: Reserve circulation with diamond tail

  • NSI: No significant intercepts