SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (170005)2/9/2023 1:25:55 PM
From: LoneClone  Read Replies (1) | Respond to of 192929
 
Class 1 Nickel announces the completion of phase 1 drilling at the Somanike Project (Marbridge Mine), near Val-d’Or, Quebec.

ca.finance.yahoo.com

Class 1 Nickel and Technologies Limited
Wed, February 8, 2023 at 4:30 a.m. PST·7 min read

Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.



Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.
Figure 2: Completed drilling at Marbridge.



Figure 2: Completed drilling at Marbridge.
Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.



Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.
Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.



Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.

TORONTO, Feb. 08, 2023 (GLOBE NEWSWIRE) -- Class 1 Nickel and Technologies Ltd. (CSE: NICO/OTCQB: NICLF) ("Class 1 Nickel" or the "Company") is pleased to announce the completion of 40 drill holes (16,510m) on its Somanike Nickel-Copper Project (“Somanike”), located near Val-d’Or, Quebec (Canada). Assays are pending for all drill holes and are expected in Q1 2023.

Key Points:

  • Diamond drilling has intersected sulphide mineralization in 23 drill holes. Mineralization is within and, in close proximity to ultramafic rocks. The host rocks are komatiitic flows and can be correlated with the horizons in the mine sequences at Mine 1, Mine 2, Mine 3 and Mine 4.

  • Drilling has confirmed that Mine 1 is in a separate stratigraphic/structural sequence from Mine 2, Mine 3 and Mine 4 that are in the hanging wall to Mine 1.

  • Down hole time domain (BHEM) geophysical surveys on holes drilled to date have identified multiple off-hole anomalies for follow-up.

  • Drone mag and LIDAR surveys have been completed over the main Marbridge area. These have identified magnetic trends that demonstrate both definition of known nickel-bearing ultramafic rocks and the significant continuation of ultramafic rocks into under-explored areas.

  • The Company’s primary objective is to make a major discovery of high-grade magmatic nickel sulphides in an environment of known nickel mineralization with significant opportunity for new discoveries.



    Figure 1
    Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.



    Figure 2
    Figure 2: Completed drilling at Marbridge.



    Figure 3
    Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.



    Figure 4
    Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.

    David Fitch, President & CEO, stated, “We are very pleased to have completed comprehensive drilling both below and adjacent to the four historical mines at Marbridge. The application of modern borehole geophysics has successfully demonstrated its viability in targeting sulphide mineralization. We know from the drilling to date that we are in a very fertile geological environment with abundant ultramafic rocks that host sulphide mineralization”.

    The drill program was conducted by Forage GeoNord from Dolbeau-Mistassini, Québec and Forage LaMontagne Fortier from Rouyn-Noranda, Québec, under the supervision of ABG Exploration Inc. (Alex Belo Géologue Inc.) of Laval, Québec.

    Table 1: Drill hole locations (NAD 83, Zone 17).

    Hole Name

    Easting

    Northing

    Elevation

    Length

    Azimuth

    Dip

    NICO22-013

    707857.00

    5358682.68

    314.86

    397.00

    215.00

    -55.00

    NICO22-014

    708238.11

    5358605.70

    315.50

    834.00

    210.00

    -70.00

    NICO22-015

    708640.74

    5358525.81

    319.31

    585.00

    200.00

    -67.00

    NICO22-016

    708634.16

    5358530.08

    319.97

    615.00

    0.00

    -45.00

    NICO22-017

    706939.67

    5359108.07

    314.66

    446.00

    260.00

    -70.00

    NICO22-018

    706934.49

    5359109.10

    315.17

    288.00

    317.00

    -65.00

    NICO22-019

    706933.92

    5359107.09

    314.89

    483.00

    220.00

    -65.00

    NICO22-020

    706938.78

    5359161.43

    315.69

    318.00

    20.00

    -50.00

    NICO22-021

    708634.37

    5358528.97

    319.59

    192.00

    0.00

    -55.00

    NICO22-022

    708000.46

    5358758.78

    320.41

    303.00

    235.00

    -45.00

    NICO22-023

    708634.39

    5358528.77

    319.64

    352.00

    0.00

    -60.00

    NICO22-024

    708596.44

    5358660.78

    316.54

    455.00

    195.00

    -50.00

    NICO22-025

    707964.72

    5358725.67

    319.78

    37.00

    215.00

    -45.00

    NICO22-026

    707964.91

    5358725.90

    319.70

    36.00

    215.00

    -60.00

    NICO22-027

    707950.59

    5358722.17

    319.73

    150.00

    215.00

    -65.00

    NICO22-028

    707949.94

    5358722.43

    319.61

    153.00

    285.00

    -65.00

    NICO22-029

    707977.17

    5358853.69

    324.26

    660.00

    215.00

    -50.00

    NICO22-030

    708636.95

    5358704.12

    319.80

    357.00

    195.00

    -50.00

    NICO22-031

    708772.78

    5358700.69

    317.24

    321.00

    200.00

    -55.00

    NICO22-032

    708344.88

    5358764.27

    317.41

    585.00

    190.00

    -60.00

    NICO22-033

    708772.74

    5358700.49

    317.35

    426.00

    200.00

    -45.00

    NICO22-034

    708772.86

    5358700.87

    317.20

    486.00

    200.00

    -65.00

    NICO22-035

    708772.97

    5358701.30

    317.30

    423.00

    235.00

    -60.00

    NICO22-036

    708344.85

    5358763.58

    317.54

    603.00

    200.00

    -45.00

    NICO22-037

    708213.24

    5358869.09

    320.12

    539.00

    230.00

    -60.00

    NICO22-038

    708772.87

    5358700.62

    317.32

    666.00

    160.00

    -65.00

    NICO22-039

    708566.69

    5358779.82

    317.47

    495.00

    180.00

    -50.00

    NICO22-040

    708908.90

    5358455.08

    314.80

    21.00

    195.00

    -45.00

    NICO22-041

    708921.88

    5358451.24

    314.82

    34.20

    195.00

    -60.00

    NICO22-042

    708921.87

    5358451.62

    314.72

    46.00

    195.00

    -85.00

    NICO22-043

    709088.83

    5358493.44

    314.79

    594.00

    210.00

    -45.00

    NICO22-044

    709090.17

    5358493.96

    314.82

    398.00

    260.00

    -65.00

    NICO22-045

    709089.56

    5358492.49

    314.80

    492.00

    200.00

    -50.00

    NICO22-046

    708596.44

    5358661.82

    316.73

    708.00

    250.00

    -67.00

    NICO22-047

    708486.46

    5358619.81

    317.93

    444.00

    227.00

    -55.00

    NICO22-048

    708600.39

    5358667.17

    316.69

    749.00

    215.00

    -70.00

    NICO22-049

    708597.79

    5358663.77

    316.98

    741.00

    295.00

    -80.00

    NICO22-050

    708490.18

    5358850.98

    317.78

    606.00

    210.00

    -62.00

    NICO22-051

    708950.90

    5358709.54

    314.75

    501.00

    200.00

    -50.00

    NICO22-052

    709222.15

    5358449.23

    310.65

    201.00

    20.00

    -50.00


    About Somanike Project

    The Somanike Project consists of 148 mining titles (mining rights area) covering 6,882 hectares within a large NW-trending ultramafic complex within the Abitibi Greenstone Belt that hosts several nickel sulphide occurrences, recognized nickel targets, ultramafic trends, and geophysical anomalies. The project is located in the prolific and mining-friendly Abitibi region of northwestern Quebec approximately 25 km north of the mining centre at Malartic, 40 km northwest of Val-d’Or, and 60 km east of Rouyn-Noranda.

    The Somanike Project includes Quebec’s first nickel mine, the historical Marbridge Mine, which was a high-grade nickel mine operated by Falconbridge Nickel. The Marbridge Mine occurs within a large NW-trending deformed and altered ultramafic complex. The Falconbridge Nickel reported production of 702,366 tons grading 2.28% Ni and 0.10% Cu from 1962 to 1968, prior to being placed on care and maintenance in 1968. The Mine consisted of two shafts accessing four separate mineralized zones over a combined strike length of 1000 m. The mineralized material was trucked 25 km south and processed at the Canadian Malartic plant. Since 1968, leading groups have reviewed Marbridge data and reports and unanimously concluded that mining ceased in mineralization and the four nickel sulphide zones remain open to expansion by drilling along strike and down-dip/plunge.

    Qualified Person

    The technical information in this news release has been reviewed and approved by Alexandr Beloborodov (P.Geo.), geological consultant of the Company, who is a Qualified Person under the definitions established by National Instrument 43-101.

    About Class 1 Nickel

    Class 1 Nickel and Technologies Limited (CSE: NICO/OTCQB: NICLF) is a Mineral Resource Company focused on the exploration and development of its 100% owned Somanike komatiite hosted nickel-copper sulphide project in Quebec, which includes the historical Marbridge Mine. The Company also owns the Alexo-Dundonald Project, a portfolio of komatiite-hosted magmatic nickel-copper-cobalt sulphide deposits located near Timmins, Ontario.

    For more information, please contact:

    Mr. David Fitch, President & CEO
    T: +61 400 631 608
    E: dfitch@class1nickel.com

    For additional information please visit our website at www.class1nickel.com and our Twitter feed: @Class1Nickel.

    Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of this press release.

    This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks involved in the mineral exploration and development industry, including those risks set out in the Company’s management’s discussion and analysis as filed under the Company’s profile at www.sedar.com. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including that all necessary governmental and regulatory approvals will be received as and when expected. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

    Photos accompanying this announcement are available at:

    globenewswire.com

    globenewswire.com

    globenewswire.com

    globenewswire.com