SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (172361)6/14/2023 12:21:12 PM
From: LoneClone  Read Replies (1) | Respond to of 194042
 
Wesdome Exploration Drilling Continues to Expand High Grade 300 East Zone Down Plunge at the Eagle River Mine Returning 40.7 Grams Per Tonne Gold Cut Over 6.0 Metres True Width

ca.finance.yahoo.com

Wesdome Gold Mines
Wed, June 14, 2023 at 4:00 a.m. PDT

Figure One



3D View of 300E Zone

TORONTO, June 14, 2023 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX: WDO) (“Wesdome” or the “Company”) today announces results from the ongoing underground exploration drilling program at the Company’s wholly-owned Eagle River Mine in Wawa, Ontario.

Ongoing extension and definition drilling of the 300 East Zone has continued to confirm the continuity of the geometry and the consistency of the high-grade mineralization down plunge. The 300 East Zone, previously defined from the 750 m-level to 1,400 m-level, has now been extended to the 1,600 m-level and remains open down plunge (Figure 1). The width of the quartz veining is typically less than 1.5 metres true width; however, recent drilling along the eastern margin of the 300 East Zone has returned wider widths. This occurs in an area that is interpreted to be at the intersection of several structures having different orientations and/or folding resulting in wider zones of gold mineralization. These wider widths and more complex geometry are similar to that of the previously mined 303 Lens located approximately 400 m up plunge from this area, which was mostly mined in 2019.

Highlights of the recent drilling are found below and are summarized in Table 1.

  • Hole 925-E-231: 77.6 g/t Au over 9.4 m core length (40.7 g/t Au cut, 6.0 m true width)

  • Including 225.1 g/t Au over 3.0 m core length

  • Hole 925-E-233: 42.6 g/t Au over 4.9 m core length (42.3 g/t Au cut, 1.7 m true width)

  • Including 62.8 g/t Au over 3.3 m core length

  • Hole 771-E-33: 150.7 g/t Au over 2.8 m core length (51.7 g/t Au cut, 1.6 m true width)

  • Including 497.8 g/t Au over 0.7 m core length

  • All assays cut to 140.0 g/t Au. True widths are estimated.

    Warwick Morley-Jepson, Board Chair and Interim CEO commented, “These results continue to confirm the geometry and high grades of the 300 East Zone. The objective of drilling this zone is to define a second, higher-grade lens similar to the previously mined 303 Lens that could potentially positively impact gold production. The 303 Lens was mined primarily in 2019 and average muck grade was 46.1 g/t.

    Additionally, the drilling of the 300 East Zone confirms the continuity of the mineralization at depth, thus suggesting that many other similar zones, such as 808, 811, 818, 711 and 7 East, have this same potential to continue at depth.

    Elsewhere at Eagle River, the Company is following up on multiple encouraging drill intersections last year both west of and along strike of, and subparallel to the Falcon 7 zone, including the western extension of the 311 West and 5 zones in the volcanic rocks. Any resources discovered in this area could meaningfully enhance the future operational flexibility of the asset.

    Meanwhile, we remain focused in 2023 on converting a large, inferred base into indicated and measured resources and subsequently reserves.”

    TECHNICAL DISCLOSURE AND QA/QC

    The sampling of, and assay data, from drill core is monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Underground drill samples are transported in sealed bags to the Eagle River Mine assay office in Wawa, Ontario. Samples are analyzed for gold using standard fire assay technique with gravimetric finish. Wesdome inserts blanks and certified reference standards into the sample sequence for quality control at the laboratory. The QA/QC procedure is described in more detail in the 2022 Technical Report filed on SEDAR on April 22, 2022.

    The technical content of this release has been compiled, reviewed, and approved by Aliou Sene, P.Geo., Chief Mine Geologist at Eagle River Complex of the Company a "Qualified Person" as defined in National Instrument 43-101 -Standards of Disclosure for Mineral Projects.

    ABOUT WESDOME
    Wesdome is a Canadian focused gold producer with two high grade underground assets, the Eagle River mine in Ontario and the recently re-started Kiena mine in Quebec. The Company also retains meaningful exposure to the Moss Lake gold deposit in Ontario through its equity position in Goldshore Resources Inc. The Company’s primary goal is to responsibly leverage this operating platform and high-quality brownfield and greenfield exploration pipeline to build Canada’s next intermediate gold producer. Wesdome trades on the Toronto Stock Exchange under the symbol “WDO,” with a secondary listing on the OTCQX under the symbol “WDOFF.”

    For further information, please contact:









    Warwick Morley-Jepson

    or



    Lindsay Carpenter Dunlop

    Board Chair & Interim CEO





    VP Investor Relations

    416-360-3743 ext. 2029





    416-360-3743 ext. 2025

    w.morley-jepson@wesdome.com





    lindsay.dunlop@wesdome.com









    220 Bay St, Suite 1200







    Toronto, ON, M5J 2W4







    Toll Free: 1-866-4-WDO-TSX







    Phone: 416-360-3743, Fax: 416-360-7620







    Website : www.wesdome.com
















    FORWARD-LOOKING INFORMATION

    This news release contains “forward-looking information” which may include, but is not limited to, statements with respect to the benefits of achieving commercial production at Kiena, the Company’s expected capital expenditure in 2023, the timing around reaching the Kiena Deep A Zone, the Company’s ability to be cash flow positive and its annual production run rate. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

    Table 1 - Drill Hole Composites

    Hole

    Zone

    From (m)

    To (m)

    Width (m)

    True Width (m)

    Au g/t (Uncapped)

    Au g/t (Capped at 140 g/t)

    771-E-33

    300

    981.50

    984.50

    3.00

    1.50

    7.98

    7.98

    771-E-33

    300

    996.00

    998.80

    2.80

    1.61

    150.69

    51.68

    771-E-38

    300

    941.66

    944.27

    2.61

    1.50

    36.03

    35.41

    771-E-50

    300

    756.50

    758.84

    2.34

    1.50

    56.60

    46.12

    771-E-65

    300

    1050.60

    1053.60

    3.00

    1.50

    18.29

    18.29

    771-E-65

    300

    1128.90

    1133.30

    4.40

    1.50

    5.57

    5.57

    771-E-66

    300

    1098.20

    1101.20

    3.00

    1.50

    5.88

    5.88

    771-E-67

    300

    1102.05

    1104.70

    2.65

    1.70

    4.26

    4.26

    925-E-205

    300

    362.70

    365.70

    3.00

    1.50

    10.15

    10.15

    925-E-207

    300

    426.10

    430.50

    4.40

    1.50

    24.55

    14.20

    925-E-212

    300

    547.90

    553.30

    5.40

    2.28

    15.20

    10.48

    925-E-213

    300

    713.10

    714.70

    1.60

    1.50

    13.24

    13.24

    925-E-217

    300

    368.40

    371.40

    3.00

    1.50

    31.41

    15.56

    925-E-219

    300

    336.20

    339.75

    3.55

    1.50

    20.88

    20.88

    925-E-220

    300

    346.10

    350.50

    4.40

    1.50

    6.42

    6.42

    925-E-221

    300

    410.70

    415.10

    4.40

    1.50

    10.39

    10.39

    924-E-224

    300

    468.70

    473.30

    4.60

    1.57

    37.29

    37.29

    925-E-231

    300

    447.30

    456.70

    9.40

    6.04

    83.20

    40.68

    925-E-232

    300

    517.90

    522.30

    4.40

    1.50

    4.43

    4.43

    925-E-233

    300

    390.60

    395.50

    4.90

    1.68

    42.56

    42.31

    925-E-234

    300

    558.00

    563.70

    5.70

    3.66

    12.66

    12.66


    A photo accompanying this announcement is available at globenewswire.com

    PDF available: globenewswire.com