SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (179090)5/23/2024 2:33:56 PM
From: LoneClone  Read Replies (1) | Respond to of 193757
 
Foremost Lithium Successfully Completes its Winter Drill Program at its Zoro Lithium Project in Manitoba, Canada

ca.finance.yahoo.com

Foremost Lithium Resource & Technology Ltd.
Thu, May 23, 2024 at 5:45 a.m. PDT·8 min read

FMST
+0.38%

FMSTW
0.00%

Summary:

  • Over 5,800 meters completed over 21 diamond drill holes

  • Drilling results demonstrate continuity of lithium mineralization along Dyke 1, extending the previous mineralized body by 150 meters to over 400 meters in several 50-meter steps out providing promising potential for new resource calculation

  • Dyke 1 is still open in all directions indicating potential for continued resource expansion and subsequent future drill programs

VANCOUVER, British Columbia, May 23, 2024 (GLOBE NEWSWIRE) -- Foremost Lithium Resource & Technology Ltd. (NASDAQ: FMST) (CSE: FAT) (“Foremost Lithium”, “Foremost” or the “Company”), a North American hard-rock lithium exploration company, is pleased to announce that is has successfully completed its 2024 winter diamond drilling program on its Zoro property, which was previously announced in the Company’s press release dated February 13, 2024. The Company completed 5,826 meters, 21 diamond drill holes targeting untested mineralization to the south-east of Dyke 1, the Company's maiden inferred resource of 1,074,567 tons at a grade of 0.91% Li2O, with a cut-off of 0.3%, as outlined in the Company’s filed Regulation SK-1300 Technical Report Summary (2023) and NI-43-101 Technical Report (2018).

Drilling results have demonstrated the continuity of lithium mineralization along Dyke 1, targeting new, untested areas proximal to the dyke, as well as infill areas along strike and at depth. In the west, the body is comprised of multiple near surface lithium-bearing pegmatites that range up to an apparent 17.9 m thickness; Multiple 50-meter step-outs, perpendicular to the strike of Dyke 1, were used to assess lateral continuity as well as the presence of at depth, extending Dyke 1 from a previous 265-meter strike length to greater than 400 meters. Spodumene was confirmed in drill core in several of the 50 metre step out extensions, providing promising potential for new resource calculation.

“We are pleased to announce the conclusion of a successful drill program on our Zoro Property, which we believe is likely to reflect a continuity of mineralized lithium along Dyke 1,” said Jason Barnard, President & CEO of Foremost Lithium. “As global lithium trends continue to straighten, we look forward to the final assay results, which provide the potential for us to pursue additional resource expansion on the Zoro property.”

The Company reported initial assay results (see press release dated April 08, 2024) on the first two holes confirming lithium mineralization spanning a cumulative length of 25.92 metres including 1.09% Li2O across 10 metres on drill hole FL24-010 and 1.52% Li2O in drill hole FL24-009 across 5.02 meters. A total of 973 drill core samples have been collected for assay and shipped to SGS Laboratories in Burnaby for detailed analysis. All remaining assays are still pending and are anticipated to be reviewed and completed in approximately 4 to 6 weeks.

Drilling Details*

Hole ID

Prospect

Easting (m)

Northing (m)

Elevation (m)

Azimuth (deg.)

Dip (deg.)

Depth (m)

FL24-001

Dyke 8

459503

6080341

291

68

55

125

FL24-002

Dyke 8

459487

6080307

290

68

65

176

FL24-003

Dyke 8

459496

6080388

291

77

55

125

FL24-004

Dyke 8

459494

6080256

291

100

65

149

FL24-005

Dyke 8

459435

6080198

295

93

45

119

FL24-006

Dyke 8

459440

6080115

296

102

45

125

FL24-007

Dyke 1

458332

6079101

280

74

45

248

FL24-008

Dyke 1

458274

6079080

280

73

55

395

FL24-009

Dyke 1

458369

6078943

287

77

55

308

FL24-010

Dyke 1

458369

6078943

287

77

45

287

FL24-011

Dyke 1

458383

6078886

286

76

45

300

FL24-012

Dyke 1

458383

6078886

286

74

55

311

FL24-013

Dyke 1

458323

6078872

288

76

60

449

FL24-014

Dyke 1

458398

6078833

286

75

45

299

FL24-015

Dyke 1

458332

6078826

288

75

55

425

FL24-016

Dyke 1

458349

6078773

287

75

45

395

FL24-017

Dyke 1

458407

6078788

286

75

45

350

FL24-018

Dyke 1

458461

6078856

286

75

45

200

FL24-019

Dyke 1

458322

6078872

288

70

52

350

FL24-020

Dyke 1

458276

6079080

273

95

52

350

FL24-021

Dyke 1

458322

6078873

288

68

52

350


*Data Verification / Quality Assurance and Quality Control

Due to the vertical orientation and variable nature of mineralization at the Company’s Dyke 1 deposit, the reported drill intersection lengths, derived from linear measurements along the drill core, may not accurately represent the true width of the mineralized zones. Best practice drilling techniques and geological interpretation were utilized to intersect mineralization in an orientation that approximates the true width as closely as feasible.



Location of diamond drill holes from the Winter 2024 drill campaign superimposed on magnetic Root-To-Pole (RPT) geophysical data.

Figure 1: Location of diamond drill holes from the Winter 2024 drill campaign superimposed on magnetic Root-To-Pole (RPT) geophysical data.

Dyke 1 – Future Potential

The body is still open in all directions indicating potential for continued resource expansion and subsequent future drill programs. Foremost will be reporting the results of all assays on a subsequent news release.

Qualified Person

Technical information in this news release has been reviewed and approved by Matthew Carter, P.Geo., who is a Qualified Person as identified by Canadian National Instrument 43-101-Standards of Disclosure for Mineral Projects and as defined by the Securities and Exchange Commission’s Regulation S-K 1300 rules for resource deposit disclosure.

About Foremost Lithium

Foremost Lithium (NASDAQ: FMST) (CSE: FAT) (FSE: F0R0) (WKN: A3DCC8) is a hard-rock lithium exploration company focused on empowering the North American clean energy economy. Foremost’s strategically located lithium properties extend over 43,000 acres in Snow Lake, Manitoba, and hosts a property in a known active lithium camp situated on over 11,400 acres in Quebec called Lac Simard South.

Foremost’s four flagship Lithium Lane Projects as well as its Lac Simard South project are located at the tip of the NAFTA superhighway to capitalize on the world's growing EV appetite, strongly positioning the Company to become a premier supplier of North America's lithium feedstock. As the world transitions towards decarbonization, the Company's objective is the extraction of lithium oxide (Li2O), and to subsequently play a role in the production of high-quality lithium hydroxide (LiOH), to help power lithium-based batteries, critical in developing a clean-energy economy. Foremost Lithium also has the Winston Gold/Silver Property in New Mexico USA. Learn More at www.foremostlithium.com.

Contact and Information

Company
Jason Barnard, President and CEO
+1 (604) 330-8067
info@foremostlithium.com

Investor Relations
Lucas A. Zimmerman
Managing Director
MZ Group - MZ North America
(949) 259-4987
FMST@mzgroup.us
www.mzgroup.us

Follow us or contact us on social media:
Twitter: @foremostlithium
Linkedin: https://www.linkedin.com/company/foremost-lithium-resource-technology/
Facebook: https://www.facebook.com/ForemostLithium

The Canadian Securities Exchange has neither approved nor disapproved the contents of this news release and accepts no responsibility for the adequacy or accuracy hereof.

Forward-Looking Statements

Except for the statements of historical fact contained herein, the information presented in this news release and oral statements made from time to time by representatives of the Company are or may constitute “forward-looking statements” as such term is used in applicable United States and Canadian laws and including, without limitation, within the meaning of the Private Securities Litigation Reform Act of 1995, for which the Company claims the protection of the safe harbor for forward-looking statements. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any other statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates” or “intends,” or stating that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved) are not statements of historical fact and should be viewed as forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, the availability of capital to fund programs and the resulting dilution caused by the raising of capital through the sale of shares, accidents, labor disputes and other risks of the automotive industry including, without limitation, those associated with the environment, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities or claims limitations on insurance coverage. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Although the Company believes that the expectations reflected in such forward-looking statements are based upon reasonable assumptions, it can give no assurance that its expectations will be achieved. Forward-looking information is subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected. Many of these factors are beyond the Company’s ability to control or predict. Important factors that may cause actual results to differ materially and that could impact the Company and the statements contained in this news release can be found in the Company’s filings with the Securities and Exchange Commission. The Company assumes no obligation to update or supplement any forward-looking statements whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release and in any document referred to in this news release. This news release shall not constitute an offer to sell or the solicitation of an offer to buy securities. and information. Please refer to the Company's most recent filings under its profile at www.sedarplus.ca. for further information respecting the risks affecting the Company and its business.

A photo accompanying this announcement is available at globenewswire.com