SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Winstar Comm. (WCII) -- Ignore unavailable to you. Want to Upgrade?


To: TheSlowLane who wrote (3975)2/24/1998 10:59:00 PM
From: Steven Bowen  Read Replies (1) | Respond to of 12468
 
With LMDS, if you have line of sight, all you have to do is stick a little (8 in by 8 in ?) antenae in your window. Will P-MP work similar to this without roof antenaes?

Steve, how does the math work out

"- When P-MP comes on line in 1999, each of the anticipated 8000 P-P buildings they expect to have, will become a "sector", capable of transmitting to an additional 15-20 buildings (at OC3 bandwidth). This translates to a "plant of 12,000 to 16,000 buildings"

Something like 30 switches times four hubs per switch times 25 to 50 buildings per hub to get P-P buildings times another 15 to 20 for P-MP?

15 to 20 buildings per 8000 P-P buildings is 120,000 to 160,000 buildings. Typo or math screwed up somewhere?

Also, I thought they were only talking one OC-3 per 100 MHz channel.
Also that highest P-P wireless link was only one DS-3. If they can only get one DS-3 (or somehow one OS-3) to each P-P building, can they still get this amount to each of the 15 to 20 P-MP buildings? Do you understand how all this works? It's totally over my head.