We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Naxos Resources (NAXOF) -- Ignore unavailable to you. Want to Upgrade?


To: Kim W. Brasington who wrote (11477)4/2/1998 7:37:00 AM
From: Steve Skapik  Read Replies (1) | Respond to of 20681
 
Kim,

Thanks for bringing some resolutionitude to the issue regarding the Pilot Plant capabilities. However, could you comment on the relative priorities on demonstrating recovery methods between J/L and something more standard? Were all happy to see the drilling and assay work being stepped up but do resources exist to develop recovery simultaneously and what is required to work on standard recovery methods?

Regards and Respect,

Steve



To: Kim W. Brasington who wrote (11477)4/3/1998 3:09:00 AM
From: nader khader  Read Replies (1) | Respond to of 20681
 
Mr. Kim Brasington,

Thanks for the clarification. From what I understand, while it will take 70 days to complete the new drilling, we will see results of that drilling as it is being done. For instance, when samples are retrieved from one hole, the material will be immediately shipped to the labs for processing and assaying, and the results obtained will then be released to the public We will not have to wait until the entire drilling is completed. Please correct me if I am wrong. Thank you.

Nader Khader