SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Shore Gold C.sgf -- Ignore unavailable to you. Want to Upgrade?


To: Tupulak who wrote (315)4/5/1998 11:39:00 PM
From: Lilian Debray  Read Replies (1) | Respond to of 550
 
On September 15th, 1997 Shore Gold announced its phase II drilling program. They may be getting close to releasing the results:

"Based on the extremely encouraging results of the Phase I program, the Phase II drill program commenced in the fall of 1997. This program includes taking a mini-bulk sample using large-diameter core (3.3 inches in diameter), as well as continuing with further definition and exploratory drilling. The first two large-diameter core holes have now been completed and the core has been delivered to the Saskatchewan Research Council for processing. These samples will be run through a bulk sample plant and all diamonds with one dimension measuring greater than 0.8 mm recovered. Initial results are expected early in 1998. Drilling is also expected to resume early in 1998."
shoregold.com.