We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Loral Space & Communications -- Ignore unavailable to you. Want to Upgrade?


To: Dragonfly who wrote (2738)4/24/1998 6:43:00 PM
From: brian h  Read Replies (2) | Respond to of 10852
 
Dragonfly,

I got all my numbers form 10 K per GSTRF and IRIDF. You keep pointing fingers saying this and that. I told everyone here I do not want to convince you any more. I did that. Again I thought it over and posted my thought again last night about the "real cost" of IRIDF and the possibility of cost overrun on GSTRF if you did read it. I directed my questions to Valueman, Bill H. and Maurice not you. I asked for comments. Then you gave those lines of "New Math". You are the one wants to turn it into personal.

As for the GSTRF's $2.7 billion project as of 12/31/97, that does include Space segments and ground segments (gateways, GOCC, and SOCC). If you care to go back to read GSTRF's 10 K again or go back to GSTRF thread's post #967, you understand what I am talking about. Here is some portion of it:

Globalstar expects the total ground segment expenditure to be approximately $710 million, net of such deferrals, through the In-Service Date.

In service date means the estimate date of G* system launch. You told us before about 600 million gateway costs to be excluded from $2.7 billion is totally false.

As for including all costs to calculate the total system costs, each gateway owner is going to invest $37 million to buy its gateways as China Telcomm just did. Once G* system is up and running, G* needs to recover $2.7 billion costs and a gateway owner, say China Telcom, needs to recover its costs of $37 million investment. Do you really think that is such a big deal to recover $37 million than recovering $2.7 billion?

The above anlysis excludes all day-day operation costs. According to IRIDF's 10 K figure, day to day operation costs was budgeted at $284 million (no.3 item from IRIDF and MOT's contract if you remember correctly) for 5 years. I do not think GSTRF's two GOCC and SOCC will require any more or any less than IRIDF's operating costs figure. As for a gateway owner's operating cost, it will be absorbed by a gateway owner anyway.

Further, please go back and check #2 item between IRIDF and MOT's contract, it stated MOT needed $2.88 billion to build gateway hardwares and softwares. On G* side, it is 710 million as state above build by QCOM. Spcae segments - I* 3.45 billion vs. G* $1.9 billion (15.6 million * 48 (sats costs) + 700 million (sats subcontracts cost) + 459 million (launch plus insurance costs))

G* system cost is 710 million + 1.9 billion = 2.7 billion

Brian H.










To: Dragonfly who wrote (2738)4/24/1998 6:55:00 PM
From: dougjn  Respond to of 10852
 
How tedious.