SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Donner Minerals (DML.V) -- Ignore unavailable to you. Want to Upgrade?


To: Terry J. Crebs who wrote (4746)5/23/1998 6:37:00 AM
From: Ed Pakstas  Respond to of 11676
 
Thanks Terry... With out knowing the DFR trading patterns leading up to the discovery, I was almost positive that there would have been all kinds of wild gyrations prior to them finding the good stuff, even though it was in a different price range...:-)...ed



To: Terry J. Crebs who wrote (4746)5/23/1998 9:26:00 AM
From: 1king  Read Replies (1) | Respond to of 11676
 
Hey T.

I thought Boulle and his bed-buddies were dragging you over to Europa for a red-ball BBQ. If you will flog that African shit DD told me about you must really be bored. Give my best to Rosie, BTW who is Joe working with now.

Re: Drilling Question

That be borehole stuff, you know, under the ground <g>. "Geometric alternatives" come about after a certain number of willy-nilly holes get drilled. The holes are probed and the effective area of exploration for each hole is interpreted and plotted. Leading edges or geometric centres of conductive bodies are also plotted. A new layer of "systematic drilling" is created by filling in gaps (i.e. outside the radius plotted for the old holes) interpreted to contain enough room for an "economic" hit and/or within the interpreted conductive bodies. All this while maintaining optimized (for borehole geophysics and rough ore economic geometry) equi-distant collar locations.

Question for T.

What would you consider an appropriate step-out given 15m massive at 200m depth. Feel free to check my web page (drilling) mentioned in earlier posts for info you may feel pertinent.

A)10m B)25m C)50m D)100m E)200m F)250m G)500m

Pick one, in a one line response.

1King

BTW You should give them a call, it sounds like they need your help.