To: Robert Pool who wrote (4266 ) 6/4/1998 7:59:00 PM From: Robert Pool Read Replies (1) | Respond to of 6467
The missing page 55 55 1 before detailed drawings could be provided of the 2 plant suitable for construction. 3 Q Okay. And, in fact, in addition to doing the 4 design criteria manual, your company in fact did 5 engineering design for plants; is that correct? 6 A We did --. Back in the -- when we were first 7 working for Thermo Tech, we did some preliminary 8 designs of plants, and currently, since January, 9 we have been looking at the Richmond plant 10 drawings and doing some basic, you know, 11 modifications to suit local building codes. 12 Q Okay. I'm just going to give you, if I might, a 13 copy of a brief of documents that I put together 14 for you to have a look at. 15 A Do you want this other one back? 16 Q You can hang onto that one there. 17 A Okay. 18 MR. LUNNY: There's one for the court and... 19 I had these copied at lunch-time, and I may 20 have ended up again coming up one short. Heads 21 will roll, my lord. 22 MR. BOWES: Well, it's a little difficult for me, my 23 lord, not knowing what documents he's going to 24 be -- 25 MR. LUNNY: Oh, I've found it. Here we go. I had it 26 all the time. My own head will roll for that. 27 Q Have you got that little -- 28 A Yes. 29 Q -- book in front of you? I want to just take you 30 to some of these. And I -- if you don't know the 31 particular news release, let's not worry. It's 32 the contents of the news release that I'm 33 concerned about. 34 If you go to tab 1, this is way back in 35 199O. Thermo Tech used to be Consolidated Thermo 36 Tech -- 37 A Um-hum. 38 Q -- International Inc.; isn't that right? 39 A I'm aware of that, yeah. 40 Q All right. In the second -- last line of the 41 first paragraph, it says the company -- "As well, 42 the company has contracted a local engineering 43 firm for the design of a turnkey plant." 44 A Yes. 45 Q Was that your firm? 46 A When was the date of this? 1990? 47 Q Right. 48 A I honestly don't remember whether --