SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Tusk Energy (TKE) -- Ignore unavailable to you. Want to Upgrade?


To: viper who wrote (576)6/11/1998 10:04:00 PM
From: grayhairs  Read Replies (4) | Respond to of 1207
 
viper,

Gunpowder will burn tomorrow. Hopefully there will be a very tall flare
shortly thereafter.

By a "natural flow test" I assume you mean a "natural clean up flow" and
not a full fledged 4 PT Modified Isochronal Test. On a well like this
the later will cost at least $60,000 and would be useless if they later
acidize. My guess is still an industry standard procedure. Perforate. Swab
or blow well in. Short (12 hr) cleanup flow. Acidize. Second short (12 hr)
cleanup flow. Run Bombs. Shut in 24 hours minimum. Start 4 Pt test.

What rate do you mean when you say "monster"?? [I'm looking for something in
the order of 50 MMCF/d AFTER STIMULATION but do recognize that on
perforating the rate could very well be less than 10 MMCF/d.]

Later,
grayhairs

P.S. -- I'm off "bright and early in the a.m." to the B.C. interior for 3 days
of golf (hacking in my case!!). Hopefully we'll see a gap up Monday morning!!