We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Winspear Resources -- Ignore unavailable to you. Want to Upgrade?


To: gg cox who wrote (6151)6/22/1998 5:34:00 PM
From: ddl  Respond to of 26850
 
Hi Peter, I'm new to this thread and your post is very interesting. I also have been doing a bit of math on this play and it finally struck me that the sample sizes from this dike are very small (average 10 - 50 pounds per drill hole).
So I asked myself, is this sampling of only the dike itself, as it must be? If so, the grade is then very high because they are reporting only on the "cream".
It would be nice to be able to extract just the cream, all 3MM tons of it, but in reality, what can they expect to have to extract in total tonnage to get 3 tons of cream?
Eric mentioned a strip rate of 14/1 if I remember correctly, I don't know, but if it is 14/1, then the actual value of this find must be liquidated by a factor of 14.
I would hope not for everyone's sake, but I imagine this should be an important factor. Can anyone help decipher this?
Good luck to all as I hope to jump in when I get a clearer picture. - denis



To: gg cox who wrote (6151)6/22/1998 7:13:00 PM
From: E. Charters  Read Replies (1) | Respond to of 26850
 
Trouble is base capital cost and infrastructure
versus applicable mining rate. It is possible
to mine flat veins by a a variety of methods.
It may be possible to strip 20 times the veins'
thickness off the top. But it all has to pay a
minimum mill. Hell I would try it with a basic
5 million dollar panning plant. But every time
I hear the mine plans up there I get bigger figures
than eleven. Beats me. But I think the vein
geometry will give them a negative return.,

What I would do is flat panel stope it laterally
and from ring drill galleries above the sill. Slush
laterally off the top into a scram drift and load it
onto a conveyor to surface. Costs would be about
$25 a ton which is acceptible to this kind of
material. Rate would be 7500 tons a week with
3 scrams running. A Panning-float sortex plant
would cost about 25 million to put in place.
Underground would be about 15 million. Costs per
Carat all up might be anywhere from 20 to 60 bucks
depending on grade.