SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Nevtah/Tower Oil Intl.- NTAH -- Ignore unavailable to you. Want to Upgrade?


To: SnakeInATuxedo who wrote (1551)6/23/1998 2:39:00 PM
From: Howard Kirk  Respond to of 3817
 
WELL NAME: #1 M.J. Borchers
LOCATION: Eli Mitchell Survey, Abstract 251,
Gonzales County, Texas
STATUS: Down for Repairs
CUMULATIVE PRODUCTION: 180,000 BO
PRODUCING FORMATION: Austin Chalk
PROJECT: Replace older engine with newly rebuilt 175 hp Waukesha engine and repair pump and pay Salt Water Disposal Costs.
EXPECTED RESULTS: Increased oil production and reduced lease
operating expenses due to more available
horse power, reduced engine oil
consumption, and reduced down time and
maintenance.
COST: $40,000.00
ESTIMATED DAILY PRODUCTION RATE: 240 B/D
OIL PRICE: 18.00 / BBL
PROJECT PAYOUT: 1 to 3 months

*************************************************************

As you can see, NTAH estimated 240 B/D, but at present is getting around 85 B/D.

This is not part of the stripper well technology that we have been reading about. The info is taken from NTAH Web site.

Howard