We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ARP - V Argentina Gold -- Ignore unavailable to you. Want to Upgrade?


To: waldo who wrote (1131)11/5/1998 10:29:00 PM
From: waldo  Respond to of 3282
 
From ABX's 9 month report: (Thnx Frank :>)

>>"The Pierina mine is on track to become Barrick's lowest cost mine in the
fourth quarter. In addition, drilling at the Pascua project continues to
expand reserves and drilling has recently been resumed to test the
promising exploration targets on the Lama property in Argentina, across the
border from Pascua.

And:
Pascua Project, Chile/Argentina
The primary objective for 1998 for this project is to expand the reserve
base and to determine the potential of the Lama property on the Argentinean
side of the border, adjacent to Pascua.
The underground drill program undertaken in the second and third quarters
extended the Brecha Frontera and Pascua ore bodies into Argentina on the
Lama property. A surface drill program of approximately 14,000 metres has
begun to further delineate the extensions into Argentina.
At Penelope, on the Lama property in Argentina two kilometres from Pascua,
a 14,000-metre drill program has begun. The objective of the program is to
expand the zone identified in the second quarter before drilling ceased for
the winter season. The first two drill holes intersected a zone of
high-grade mineralization, which was confirmed by surface sampling.
Pilot tests on Pascua ore were completed in the third quarter. The pilot
plant was the final test required to confirm recovery rates and cost
assumptions for the proposed plant. Based on the results the final plant
specifications are being completed. <<