SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Yamana Resources INC. T- YRI -- Ignore unavailable to you. Want to Upgrade?


To: Stephen O who wrote (1979)1/26/1999 9:35:00 AM
From: Neil Irwin  Read Replies (1) | Respond to of 2346
 
Thanks for correcting me on Black Hawk. However, Barrick can increase its interest to 40% on completion of the feasibility study. BTW, Manantial Espejo is estimated at 7.9 million tonnes grading 191 g/t silver and 2.87 g/t gold, or about 88.6 million ounces of silver-equivalent. The average grade is about 360 g/t silver equivalent, or about one third of Veta Martha's grade of 1050 g/t.

I'd like to correct the NPV that I estimated last night. The $20M was the gross profit, but I forgot to remove the capital cost. This would reduce it to $12M. Using a 5% interest rate, a 3 year period to build the mine, and ignoring the interest cost of the capital cost, the NPV of the project would be about $9M, or about $0.25 per share. As Curtis said, "not a WOW", but it is a good start.

Neil.