We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : American International Petroleum Corp -- Ignore unavailable to you. Want to Upgrade?


To: Razorbak who wrote (9534)3/2/1999 2:51:00 PM
From: Daniel P. Dwyer  Read Replies (1) | Respond to of 11888
 
Razorbak,

Thanks for posting the meat of the 8-K filing.

While the financing was pretty much what I had expected (more of the same), there are a few observations I would like to make. First, the warrants equal further dilution. Second, the company's ability to purchase these notes is a little troubling. First, we can only purchase $5 mil of the $10 mil. The offering specifically states that the mortgage will not be lifted from the refinery until the note is down to $3 mil. That leaves a difference of $2 mil, which stands in the way of conventional financing since I don't see how a conventional lender will lend without being first in line.

The option to convert is in the hands of the lender. With the exception of the $5 mil, we cannot deter further dilution, even if we wanted to. I do not understand that covenant. Why could we not have negotiated full repurchase based on the same conditions, which by the way penalize the company if the company's stock does well.

That's the negative view. The more positive view is that it does give the company time and money when the refinery is entering its seasonal sweet spot. PR contact Mike Dodge said that the refinery should do $25 million this year, and possibly $40 million, if the company secures the necessary barges and tanks. With this money, they may do just that. Grabbing that extra $15 million in revenue could add another $5 to $6 million to the bottom line, money enough to pay off the first $5 mil. With only $2 million between it and conventional financing, it is possible that a conventional lender will still lend, since the refinery's value as an operating asset will have increased sufficiently to make room for another mortgager. Just an observation.

I would still feel more comfortable with a better exit strategy from this kind of financing, but you got to do what you got to do to make money.

Dan Dwyer



To: Razorbak who wrote (9534)3/3/1999 7:48:00 PM
From: Tomas  Respond to of 11888
 
Oil&Gas Journal, this weeks issue: Low oil prices squeeze Caspian Sea projects

Investment in Caspian Sea oil and gas projects is likely to be delayed by low oil prices, but the region is still set to become a significant producer. This was the message presented at a London conference on Feb. 18 by Robert Priddle, executive director of the International Energy Agency.

Priddle noted that, while recent disappointing Caspian Sea drilling results have inspired talk of downgrading reserves estimates for the region, "Keep in mind, however, that many dry holes were drilled in the North Sea."

IEA reserves estimates for the Caspian Sea region, defined as Azerbaijan, Kazakhstan, Turkmenistan, and Uzbekistan, are among the more conservative, and thus do not require lowering yet, he said. IEA estimates that the four countries have combined Caspian Sea oil reserves of 15-40 billion bbl and gas reserves of 235-325 tcf: "This represents about 2% and 6%, respectively, of world proven reserves; (hence) the Caspian could be another North Sea but not another Middle East."

If investments in the Caspian region continue at their recent rate, and if sufficient export outlets are developed, IEA reckons Caspian region oil production could reach 3.9 million b/d by 2010, of which 2.3 million b/d would be available for export. If low oil prices continue, Priddle said, Caspian region oil flow would be closer to IEA's "low case" scenario for 2010, with output reaching 2.8 million b/d, of which 1.5 million b/d would be available for export. He added that Caspian Sea production costs are below those of Russia and the North Sea but more than those of the Middle East, putting it on a par with offshore West Africa.

"At best," said Priddle, "the Caspian region will account for about 4% of world oil supply in 2010. By way of comparison, in recent years, Middle East-OPEC has supplied more than 40%, and could supply more than 52%, of world consumption by 2010."

Priddle said that forecasting Caspian region gas production is extremely difficult, with output dependent on development of export markets, access to Gazprom pipelines, pace of new pipeline construction, and domestic consumption. He contends Turkey is the most likely gas export market for Caspian gas, with Turkish demand expected to provide sales potential.

IEA predicts Caspian region gas exports could reach a maximum of 84 billion cu m/year by 2010: "The level of reserves is not a binding constraint, and probably will not be for a long time."

Export dilemma

The Caspian Sea region is a potentially significant "marginal" supplier of oil and gas-in comparison with the Middle East-but what really sets it apart is the difficulty of getting oil and gas out of the area.

"The lack of export infrastructure is probably the most difficult problem facing investors in the region," said Priddle. "The construction of new export pipelines has become a priority. However, most routing options are fraught with technical, financial, legal and/or political difficulties. Many proposed pipelines must pass through, or take potentially expensive detours to avoid, politically troubled areas."

The most advanced export route from Kazakhstan is the Caspian Pipeline Consortium (CPC) project, work on which is now expected to begin in 1999 and be completed by 2001. The schedule has slipped several times. The CPC pipeline will have initial capacity of 560,000 b/d of oil and is expected to cost $2.24 billion. A major hurdle is obtaining rights of way through certain Russian regions along the route, although this is being overcome.

While the Azerbaijan International Operating Co. (AIOC) consortium is exporting oil from Chirag field by tanker and existing Russian pipelines, further export capacity is expected to be required by 2003 or 2004.

AIOC announced a short list of three potential routes for its "main oil pipeline" in July 1997: expanded versions of existing routes delivering early oil to Novorossiisk and Supsa and a new route to the Turkish Mediterranean port of Ceyhan. Priddle said the Azeri government and other local regimes prefer the Ceyhan route, while AIOC would like to continue putting off a decision on the route, as it has several times already: "It claims it will not need the main oil pipeline until 2004 and therefore should not have to start building it for at least another year."

The biggest drawback of the Ceyhan export route is its price, estimated at $2.2-3.7 billion, compared with $2.5 billion for a main export line to Novorossiisk and $1.8 billion to the Georgian Black Sea port of Supsa.

The Azeri government is keen to reduce pipeline construction costs, which can be recouped by AIOC, Priddle said: "Financing a large new pipeline would mean lower initial revenues for the Azeri government."