SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ARP - V Argentina Gold -- Ignore unavailable to you. Want to Upgrade?


To: Mr. Oil who wrote (3215)3/25/1999 8:09:00 AM
From: LaFayette555  Respond to of 3282
 
I figured large pro funds could sell the HM short to get their $ now,
figured this could weight down HM for a time, my self I did NOT do that.

When the deal is consumed we will end up with HM shares that trade in US - one can then sell the HM and keep the US$ in a US account.



To: Mr. Oil who wrote (3215)3/25/1999 10:01:00 AM
From: Gord Bolton  Read Replies (2) | Respond to of 3282
 
FOR: ARGENTINA GOLD CORP.

VSE SYMBOL: ARP

MARCH 25, 1999

Argentina Gold: Hole 135 - Highest Grade Hole Drilled To
Date At Filo Federico; 197m of 5g/t Gold incl. 41m of
13.7g/t Gold; Significant Expansion of High Grade Zone at
Filo Federico

VANCOUVER, BRITISH COLUMBIA--Argentina Gold Corp. (the "Company")
is pleased to announce the results from Holes 135 and DDF1
drilled at the Western Filo Federico target.

Western Filo Federico - high grade east-west corridor opened up

Hole 135 returned a long, high grade, open-ended intercept at the
northeast sector of the Western Filo Federico target. This hole
is part of an east-west corridor comprising Holes 129, 121, 72,
58, 112 and 68 that all contain high grade intersections.

The drilling this season has rapidly expanded the possible starter
pit zone of Western Filo Federico and drilling continues, testing
for further expansion.

Linkage between the NW target and Western Filo Federico has been
confirmed by drilling and further drilling in this area will
define the continuity of the mineralization between these two
targets.

/T/

Hole Total Int- From To Gold Silver Gold Azimuth Co-
Depth erval(m) (m) (g/t) (g/t) Equiv. Angle ord-
(m) (m) x(g/t) inates

135 319 197 122 319 4.95 pend. 100 -70 2407044 E
incl. 41 197 238 13.72 6752639 N
Elev. 4305
(x) 50 g/t Ag = 1 g/t Au

/T/

Diamond core hole DDF1, a twin to reverse circulation Hole 72,
confirmed on average the results received from Hole 72. A direct
comparison was difficult due to poor recoveries in several
sections of Hole DDF1.

/T/

Hole Total Int- From To Gold Silver Gold Azimuth Co-
Depth erval(m) (m) (g/t) (g/t) Equiv. Angle ord-
(m) (m) x(g/t) inates

DDF1 230 146 5 151 1.81 pend. 125 -75 2406904 E
incl. 69 69 138 2.67 6752629 N
Elev. 4250

(x) 50 g/t Ag = 1 g/t Au

/T/

Drilling Continues

There are currently 3 reverse circulation rigs and 3 diamond rigs
on site. The following holes are complete with assays pending or
currently underway as indicated:

/T/

Western Filo Federico

Hole 134, collared 75 metres southeast of
Hole 114 (complete).
Hole 136, drilled from the same platform as
Hole 125 in a northwesterly direction (complete).
Hole 137, collared 50 metres northeast of Hole 55
(previous season) (complete).
Hole 138, collared 50 metres northeast of
Hole 125 (complete).
Hole 139, collared 60 metres west of Hole 121 (complete).
Hole 140, collared 50 metres southwest of
Hole 58 (complete).
Hole 142, drilled from the same platform as Hole 68
in a northwesterly direction (complete).
Hole 143, collared 70 metres west of Hole 128 (complete).
Hole 144, collared 50 metres northwest of
Hole 129 (complete).
Hole 145, collared 110 metres southwest of
Hole 128 (complete).
Hole 146, collared 90 metres west of Hole 129, is underway.
Hole 147, collared 50 metres southwest of
Hole 44 (complete).
Hole 149, collared 200 metres SSW of Hole 59 is underway.
Diamond Hole DDF2, a twin to RC Hole 122 is underway.

Amable

Diamond Hole DDA3, a twin to RC Hole 80, is underway.
Diamond Hole DDA4, a twin to RC Hole 90, is underway.

Amable North

Hole 141, collared 60 NNE of Hole 133 (complete).

Eastern Filo Federico

Hole 148, collared 145 metres ENE of Hole 54 is underway.

/T/

ON BEHALF OF THE BOARD

J. Patricio Jones, President

NOTE: Location maps available from the company at the number
listed below.

-30-