We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Global Platinum & Gold (GPGI) -- Ignore unavailable to you. Want to Upgrade?


To: Zeev Hed who wrote (10538)5/25/1999 2:42:00 PM
From: Richard Mazzarella  Read Replies (1) | Respond to of 14226
 
Zeev, <<how did you know?>> Stock trading behavior and the sympathetic vibrations on my desk from your posts are the clue. <VBG>



To: Zeev Hed who wrote (10538)5/25/1999 3:25:00 PM
From: Ed Fishbaine  Read Replies (1) | Respond to of 14226
 
To all: McKays release on the web site:

May 25, 1999

Progress Report

This report to the shareholders will cover the following:

1.Results from Sabin Metal Corporation
2.Production Ramp-up
3.R & D leach/precipitation results
4.GPGI Brochure

Summary

We have received the results from Sabin Metal Corporation.  The results are excellent.  We are
continuing to ramp-up production by increasing the number of shifts and increasing capacity
through furnace modification.

We have completed our R & D on the leach/precipitation method mentioned in earlier releases. 
Yields in the lab are over 10 oz. per ton.

Our brochure is now in distribution.

Results from Sabin Metal Corporation

On Thursday, May 20th Global Platinum did receive those results from Sabin Metals
Corporation.  Those results are as follows:

    Total sample weight received by Sabin Metals = 2.0064 kg.
    Total sample weight (dry) = 1.8634 kg. = 1,986.34 grams
 
METAL
% BY WEIGHT
GRAMS
TROY OUNCES
MARKET VALUE  /  TON
GOLD
1.365
27.11
0.872
$274 * 399 ozt = $109,326
PLATINUM
1.205
23.94
0.770
$354 * 352 ozt = $124,602
PALLADIUM
1.355
26.91
0.865
$344 * 395 ozt = $136,021
RHODIUM
0.965
19.17
0.616
$820 * 282 ozt = $231,240

TOTAL VALUE PER TON OF ANODE SLIME = $601,189

Management is very pleased by these results.  In all there is a total of less than 1% difference
between our assay amount and the amounts recovered by Sabin Metals.  These results also
confirm the high quality of assay work done by Global.

Production Ramp-up

Global started the first phase of its production start up, on time, this April and made a small test
shipment to its refiner on April 29, 1999.  Now with the confirmation report from Sabin Metal
Corporation, the company is beginning the second phase of its production start up.  Additional
people have been hired and trained so that our mill will be running at 18 shifts per week
commencing May 24, 1999.  Our furnaces will be modified over the next six weeks.  These
modifications will improve burner efficiency and increase capacity by 40%.  We have received a
quotation for a high efficiency furnace.  Global's management sees its next goal as to produce at
least $35,000 per week of precious metals - at which the company will be profitable.

R & D Leach/Precipitation Results

As previously reported, R & D developed a leach/precipitation method with yields in the range of
$1,200 - $1,700 per ton.  In that the yield was below our current level, direction was given to
continue to develop this new method until the recovery rate had increased to normal levels.  We
have now completed our R & D on this leach/precipitation method.  The yields in the lab are over
10 oz. per ton.  Pilot plant tests will be conducted starting May 24.

The reason why we are interested in this method is that it does not require time consuming steps. 
With minor modifications we would have a capacity of 120 - 150 tons per day.  The cost of the
reagents used in this process is quite low.  Most importantly, the precipitant would be
shipped directly to the refiner.  If this method is successful it means that Global can almost
immediately achieve a much larger cash flow while at the same time continue the slower but
profitable furnacing/electrowinning process

GPGI Brochure

We have started distributing our brochure.  It is our intention to mail a copy along with this
progress report to all shareholders.

Clarification

There have been a number of questions raised since the May 6th press release about the 1,000 lb.
shipment.  Please re-read item #5 of the May 6th press release.

The item read "Continue to produce as much anode slimes as possible with a view to having a
1,000 lb. shipment available for Sabin Metal Corporation upon completion of their refining
evaluation."  Sabin Metal Corporation physically received the shipment on May 5, 1999.  At the
time it was estimated that Sabin Metal Corporation would require a minimum of six weeks to
complete their evaluation which means that we intended to ship on June 16th.  We are very
pleased that Sabin completed their evaluation in such a short period of time.

In conclusion, I am very pleased that we are now in production and that the results from Sabin
Metal Corporation confirm the success of our process.  I look forward to reporting to you very
soon on our progress with our furnacing as well as the results of our new leach and precipitation
process.
 

Mike McKay
Facilities Manager
May 21, 1999
 
 

This communication to shareholders and the public contains forward-looking statements.  Actual
results may differ materially from those indicated by such statements. All statements, other than
statements of historical fact, included herein, including, without limitation, statements regarding
future production, are forward-looking statements that involve various risks and uncertainties.
There can be no assurance that such statements will prove to be accurate and actual results and
future events could differ materially from those anticipated in such statements.