SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold-Ore Resources T.GOZ GREXF

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: IngotWeTrust4/4/2007 4:18:47 AM
  Read Replies (1) of 49
 
Drill Results Mar 7, 2007

Subj: Bjorkdal Gold Mine - Additional Drill Results
Date: 07-03-07 20:40:42 EST
From: info@goldoreresources.com (Gold Ore Resources Ltd.)

=======================================================================
Bjorkdal Gold Mine - Additional Drill Results
=======================================================================

Gold-Ore Resources Ltd. is pleased to provide further results from
underground drilling at the Bjorkdal Gold Mine in Sweden. Gold-Ore has
now drilled 120 core holes totaling 10,600 metres from the underground
workings excavated in 2006. Gold-Ore has an option to purchase 100% of
the gold-producing property from Minmet plc of Dublin, Ireland.

Drill Results

The results in the tables below are separated into wide-spaced and
infill drill holes. The area being tested was initially drilled on a
systematic basis on sections spaced 30 metres apart. Upon the receipt
of extremely positive initial results, the decision to drill infill
sections at spacing of 15 metres was made.

These latest drill results continue to demonstrate that the
mineralization previously mined in the open pit extends northward and
remains open to further expansion. The area tested by the drilling thus
far spans 650 metres (across strike of the veins) by 150 metres (along
strike of the veins). This entire area hosts a series of continuous
gold-bearing veins. Mining methods and capital and operating costs are
being compiled. A test mining program will commence during April and
will involve the collection of bulk samples from several veins for
immediate processing in the Bjorkdal plant. Gold recovered will be sold
at the spot price and the revenue will be used to offset exploration
costs.

Significant Intersection (wide-spaced drilling)

Drill Hole Section From To Core Interval True Gold Grade

(m) (m) (m) Width (m) (g/t)
2006-080 60 West 46.0 49.0 3.0 3.0 8.25
2006-089 30 West 43.0 48.0 5.0 3.8 5.86
2006-090 30 West 13.0 17.0 4.0 3.7 2.75
22.4 25.0 2.6 2.4 5.66
2007-003 30 West 52.5 55.0 2.5 2.5 4.10
139.0 141.0 2.0 2.0 8.72
2007-004 30 West 21.0 24.0 3.0 2.9 9.01
30.1 33.0 2.9 2.8 32.80
76.0 79.0 3.0 2.9 8.04
83.0 86.0 3.0 2.9 4.10
2007-007 90 East 17.0 20.0 3.0 2.4 5.38
2007-008 90 East 8.0 11.0 3.0 2.7 2.59
24.0 27.0 3.0 2.7 57.77
52.0 56.0 4.0 3.6 6.71
66.0 69.0 3.0 2.7 3.14
73.0 75.8 2.8 2.5 10.13

Significant Intersections (In-fill)

Drill Hole Section From To Core Interval True Gold Grade

(m) (m) (m) Width (m) (g/t)
2006-051 45 East 53.9 57.7 3.8 3.6 3.18
73.9 77.0 3.1 2.9 4.53
2006-082 45 East 15.0 18.0 3.0 2.8 16.67
25.0 27.4 2.4 2.3 4.22
2006-083 15 East 1.0 7.0 6.0 5.2 14.13
22.0 26.0 4.0 3.5 3.78
54.9 58 3.1 2.7 3.77
72.0 75.6 3.6 3.1 4.30
2006-091 45 East 27.0 30.2 3.2 2.7 3.20
2006-092 45 East 76.8 80.0 3.2 2.1 8.26
2007-001 75 East 34.0 38.0 4.0 2.2 11.94
2007-005 75 East 50.0 52.2 2.2 2.1 4.11
2007-011 45 East 30.0 32.3 2.3 2.2 5.10
2007-013 45 East 12.8 14.8 2.0 2.0 3.28
2007-014 15 East 2.0 4.1 2.1 2.0 3.03
22.0 24.5 2.5 2.4 8.76
2007-015 15 East 24.0 26.5 2.5 2.5 4.62
29.0 31.0 2.0 2.0 3.69
40.0 42.0 2.0 2.0 3.04
46.0 48.0 2.0 2.0 2.92
2007-016 15 East 2.0 4.5 2.5 2.4 9.13
74.9 77.2 2.3 2.2 3.43


Sample Protocol and Chain of Custody

In order to minimize the effects of the coarse, nugget gold at
Bjorkdal, two different preparation techniques are employed on the core
at Bjorkdal. The wide-spaced drill holes are logged, photographed and
sawed in half. Half of the core is then shipped to ALS Chemex for gold
analysis. The infill drill holes are logged and photographed, and then
the entire core is shipped to ALS Chemex for gold analysis. Of the 107
drill holes reported on to date, 19 holes (18%) are infill and 88 holes
(82%) are wide-spaced.

All drill core is transported by Gold-Ore personnel to the ALS Chemex
lab in Pitea, Sweden. The core is crushed and pulverized and a 500 gram
split is assayed by an accelerated cyanide leach (bottle roll). This
method was selected as the large sample assayed minimizes the nugget
effect and provides for a more reliable assay. A rigorous QA/QC program
is employed and involves the insertion of blanks, certified standards
and field and lab duplicates.

For more information please contact Glen Dickson or Bob Wasylyshyn at
(604) 687-8884. Bjorkdal property information is posted on the
Company's web site at www.goldoreresources.com Robert S. Wasylyshyn; P.
Geo. is the Company's Qualified Person for the Bjorkdal Project.

ON BEHALF OF THE BOARD

Glen Dickson, Chairman

=======================================================================
Copyright (c) 2007 GOLD ORE RESOURCES LTD. (GOZ) All rights reserved.
For more information visit our website at
goldoreresources.com or send
mailto:info@goldoreresources.com
Message sent on Wed Mar 7, 2007 at 5:32:21 PM Pacific Time
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext