"To avoid flaring the excess gas, the Company purchased a gas compression system in June 2010 that buffers and regulates the off-gas. The gas is then stored in mobile tanks and can be resold or used to cold start the P2O furnace." ... "There have been many other additions to the P2O machine and facility since the last quarterly filing, all of which have been designed to increase efficiencies and improve operations. A second condenser was added to the P2O system so that there is one condenser to condense the heavy fuel (diesel) and another to condense the light fractions (gasoline)."
sec.gov
"A minor by-product of the process is an off-gas much like natural gas. The process consumes much less off-gas to operate than is generated when operating at maximum capacity. Further testing at high processing rates proved that all the off-gas could not be burned (temporarily for a stack test) in the process furnace. Flaring the excess off-gas is common in the oil and gas industry but is not environmentally friendly, would waste the fuel value, and would require a separate permit. To avoid flaring the excess gas, the Company purchased a gas compression system to buffer and regulate the off-gas to 1) resell or 2) to cold start the process. The gas compression system and mobile storage tanks were installed on the Company’s 20T Plastic2Oil processor in June 2010." .... "...as well as approximately $140,000 for parts and equipment relating to P2O, including the off-gas compression system, a shredder and a granulator. "
sec.gov
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: BT-1 Tank Location: Aboveground - in contact with impervious barrier Tank Status: In Service Tank Install Date: 07/06/2010 Tank Closed Date: Tank Capacity: 17850 gal...................... (old listing - Sep 2010)
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: WT-7 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: Closed - Removed Tank Install Date: 07/06/2010 Tank Closed Date: 02/01/2011 Tank Capacity: 1200 gal........................ (old listing - Sep 2010)
5 Tanks Found
Tank No Tank Location Status Capacity (Gal.) BT-1 Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) In Service 18367 OT-2 Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) In Service 10000 WT-3 Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) In Service 375 WT-4 Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) In Service 375 WT-7 Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Closed - Removed 1200
dec.ny.gov
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: BT-1 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: In Service Tank Install Date: 02/10/2011 Tank Closed Date: Tank Capacity: 18367 gal. Product Stored: Diesel Percentage: 100% Tank Type: 01 - Steel/Carbon Steel/Iron Tank Internal Protection: Other Tank External Protection: Urethane Tank Secondary Containment: Diking (Aboveground) Tank Secondary Containment: Modified Double-Walled (Aboveground) Tank Leak Detection: Interstitial - Manual Monitoring Overfill: Other Spill Prevention: Catch Basin Dispenser: None Pipe Location: Aboveground Pipe Type: Steel/Carbon Steel/Iron Pipe External Protection: Painted/Asphalt Coating Piping Secondary Containment: None Piping Leak Detection: None Tank Next Test Due: Tank Last Test: Tank Test Method: Testing Not Required
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: OT-2 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: In Service Tank Install Date: 02/15/2011 Tank Closed Date: Tank Capacity: 10000 gal. Product Stored: Diesel Percentage: 100% Tank Type: 01 - Steel/Carbon Steel/Iron Tank Internal Protection: None Tank External Protection: Painted/Asphalt Coating Tank Secondary Containment: Modified Double-Walled (Aboveground) Tank Leak Detection: Interstitial - Manual Monitoring Overfill: Other Spill Prevention: Catch Basin Dispenser: Suction Pipe Location: Aboveground Pipe Type: Steel/Carbon Steel/Iron Pipe External Protection: None Piping Secondary Containment: None Piping Leak Detection: None Tank Next Test Due: Tank Last Test: Tank Test Method: Testing Not Required
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: WT-3 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: In Service Tank Install Date: 02/15/2011 Tank Closed Date: Tank Capacity: 375 gal. Product Stored: Diesel Percentage: 100% Tank Type: 01 - Steel/Carbon Steel/Iron Tank Internal Protection: None Tank External Protection: Painted/Asphalt Coating Tank Secondary Containment: Modified Double-Walled (Aboveground) Tank Leak Detection: Interstitial - Manual Monitoring Overfill: High Level Alarm Spill Prevention: Catch Basin Dispenser: Suction Pipe Location: Aboveground Pipe Type: Steel/Carbon Steel/Iron Pipe External Protection: Painted/Asphalt Coating Piping Secondary Containment: None Piping Leak Detection: None Tank Next Test Due: Tank Last Test: Tank Test Method: Testing Not Required
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: WT-4 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: In Service Tank Install Date: 02/15/2011 Tank Closed Date: Tank Capacity: 375 gal. Product Stored: Diesel Percentage: 100% Tank Type: 01 - Steel/Carbon Steel/Iron Tank Internal Protection: None Tank External Protection: Painted/Asphalt Coating Tank Secondary Containment: Modified Double-Walled (Aboveground) Tank Leak Detection: Interstitial - Manual Monitoring Overfill: High Level Alarm Spill Prevention: Catch Basin Dispenser: Suction Pipe Location: Aboveground Pipe Type: Steel/Carbon Steel/Iron Pipe External Protection: Painted/Asphalt Coating Piping Secondary Containment: None Piping Leak Detection: None Tank Next Test Due: Tank Last Test: Tank Test Method: Testing Not Required
Site No: 9-601203 Site Name: JBI RE #1 INC. Tank No: WT-7 Tank Location: Aboveground - No Contact (on saddles, legs, rack, cradle, etc.) Tank Status: Closed - Removed Tank Install Date: 07/06/2010 Tank Closed Date: 02/01/2011 Tank Capacity: 1200 gal. Product Stored: Diesel Percentage: 100% Tank Type: 01 - Steel/Carbon Steel/Iron Tank Internal Protection: None Tank External Protection: Painted/Asphalt Coating Tank Secondary Containment: None Tank Leak Detection: Impervious Barrier/Concrete Pad (A/G) Overfill: High Level Alarm Overfill: Product Level Gauge (A/G) Spill Prevention: None Dispenser: Suction Pipe Location: Aboveground Pipe Type: Steel/Carbon Steel/Iron Pipe External Protection: None Piping Secondary Containment: None Piping Leak Detection: None Tank Next Test Due: Tank Last Test: Tank Test Method: Testing Not Required |