SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers -- Ignore unavailable to you. Want to Upgrade?


To: onepath who wrote (71681)9/12/2011 4:24:04 PM
From: roymario  Read Replies (1) | Respond to of 78407
 
Endeavour Mining drills 10 m of 10.9 g/t Au at Agbaou

2011-09-12 10:09 ET - News Release



Mr. Neil Woodyer reports

ENDEAVOUR MINING REPORTS POSITIVE DRILL RESULTS AT AGBAOU INCLUDING 10 METRES AT 10.9 G/T

Endeavour Mining Corp. has released results from the continuing drilling at its Agbaou gold project located in Cote d'Ivoire, West Africa.

Neil Woodyer stated: "We continue to be very encouraged by the results at Agbaou, and I am pleased to see this additional potential being developed. Any additions to reserves that may arise from this latest round of work can only serve to enhance the project."

Infill drill program

The 7,000-metre infill portion of the drilling program at the Agbaou feasibility-stage project in Cote d'Ivoire was completed in August, 2011, and all results have now been received. A total of 63 holes were drilled in the main deposit and 22 holes were drilled in the south deposit. The results have consistently demonstrated continuity of grades and widths and confirmed the quality and interpretation of the mineralized zones within the deposits. Intersections include 10 metres at 10.90 grams per tonne gold and 12 metres at 7.51 g/t gold. Additional highlights with true widths are provided in a table.

             AGBAOU MAIN INFILL DRILLING HIGHLIGHTS  Hole ID      From    To   Length   True width    Au grade               (m)   (m)      (m)          (m)       (g/t)  AGBRC483       20    28        8          6.8        7.11 including      24    28        4          3.4       10.79 AGBRC484       14    26       12         10.2        1.78 including      14    16        2          1.7        8.61 and            36    46       10          8.5       10.90 including      38    44        6          5.1       16.39 AGBRC485        0     8        8          6.8        5.17 including       6     8        2          1.7       18.04 AGBRC486       10    20       10          8.5        4.17 including      16    20        4          3.4        7.59 AGBRC487       10    14        4          3.4        1.60 AGBRC488       18    28       10          8.5        2.88 including      24    26        2          1.7        9.62 AGBRC489       10    12        2          1.7        4.37 AGBRC490       44    58       14         11.9        3.54 including      48    50        2          1.7       15.08 AGBRC491       36    54       18         15.3        3.57 including      38    44        6          5.1        8.56 AGBRC492       56    60        4          3.4       17.60 AGBRC493       44    48        4          3.4        2.06 and            70    82       12         10.2        4.67 including      72    78        6          5.1        7.37 AGBRC494       32    34        2          1.7       19.95 and            50    54        4          3.4        1.29 and            70    84       14         11.9        4.43 including      70    76        6          5.1        8.30 AGBRC495       80   102       22         18.7        5.49 including      84    86        2          1.7       21.67 AGBRC496      106   112        6          5.1        1.46 AGBRC497       82    94       12         10.2        7.51 including      88    92        4          3.4       12.98 AGBRC498       46    48        2          1.7        8.54 and            84    98       14         11.9        5.45 including      88    92        4          3.4       12.11 AGBRC499       76    84        8          6.8        3.75 including      78    80        2          1.7        7.06 AGBRC500       66    74        8          6.8        2.30 including      66    70        4          3.4        3.98 AGBRC501       32    34        2          1.7        7.34 and            88    98       10          8.5        2.91 including      92    96        4          3.4        5.83 AGBRC502       18    28       10          8.5        2.09 including      22    24        2          1.7        4.96 and            40    54       14         11.9        2.02 including      52    54        2          1.7        4.08 AGBRC503       50    56        6          5.1        1.72 including      54    56        2          1.7        4.06 and            70    74        4          3.4        8.37 AGBRC504       74    76        2          1.7       11.52 AGBRC505       70    76        6          5.1        1.22 
These new results are currently being incorporated into the database and will reduce the nominal drill spacing down to 20 metres by 20 metres over an area covering 200 metres by 260 metres of the main deposit. The results will reduce the spacing down to 60 metres by 180 metres of the south deposit. The area of infill drilling represents approximately 38 per cent of the deposit area. These additional data will be the basis for a revised resource estimate planned to improve classification of portions of the mineral resource from indicated to measured.

Condemnation/exploration drill program

The condemnation/exploration program resumed in August, 2011, and a second drill rig was added to expedite the program, which was completed in late August, 2011. A total of 12,914 metres in 250 holes were completed, and assays have been reported for 60 per cent of the program. Initial results from this program had outlined six targets for further investigation (news release dated Aug. 3, 2011). The most recent reverse circulation drill results combined with a review of 2010 RAB drilling have identified four additional targets for further drilling. New RC drilling results include 14 metres at 2.69 grams per tonne gold, and 22 metres at 3.66 g/t gold including two metres at 14.05 g/t gold. Additional highlights are provided in a table.

The RAB drilling results from 2010 were reviewed in light of the positive RC drilling and were used to highlight other areas that warrant further drilling. Results include six metres at 1.04 g/t gold. Additional highlights are provided in a table.

        AGBAOU MAIN CONDEMNATION/EXPLORATION DRILLING HIGHLIGHTS  Hole ID              From             To         Length     Gold grade                       (m)            (m)            (m)          (g/t)  AGBRC384                3             15             12           0.66 AGBRC387                0              6              6           0.88 AGBRC388                3              6              3           1.42 AGBRC397               12             15              3           2.04 AGBRC599               36             38              2           1.06 and                    44             46              2           6.71 AGBRC600                8             22             14           2.69 including              20             22              2          14.45 and                    24             46             22           3.66 including              38             40              2          14.05 AGBRC601                0             14             14           1.25 and                    12             14              2           4.18 AGBRC602                2              8              6           0.69 
                           AGBAOU RAB DRILLING HIGHLIGHTS  Hole ID                From               To           Length       Gold grade                         (m)              (m)              (m)            (g/t)  AGBRB047                  0                3                3             0.75 AGBRB048                  0                3                3             0.68 AGBRB049                  0                6                6             0.86 AGBRB050                  3                9                6             1.04 AGBRB051                  0                6                6             0.97 
Additional exploration campaign

The initial 2011 condemnation/exploration drill campaign was planned to test the areas of significant mine infrastructure and resulted in the identification of a combined total of 10 new targets, including the one target based on RAB drilling. This prompted Endeavour to allocate an additional $800,000 (U.S.) budget to complete an additional 9,500 metres of RC drilling to further test these targets.

This additional drilling is being completed in two phases. Phase one is a series of fences of holes that flank these targets and provide 100-metre spacing between intersections, which are currently on lines 300 metres apart. Phase 2 is a 100-metre step-out from the phase-one holes and will be adjusted based on the phase-one results.

Drilling has already commenced on phase one of this additional campaign using the two RC rigs already on site.

Mine development

Endeavour is also pleased to announce that Senet, a South African engineering company, has been engaged to update the Agbaou project in support of development studies.

Qualified person

K. Kirk Woodman, PGeo, head of exploration, is the qualified person overseeing Endeavour's exploration projects in West Africa and has reviewed and approved this news release.

All sample preparations and standard 50-gram gold fire assays were performed by Bureau Veritas Laboratories, Abidjan, Cote d'Ivoire. Endeavour consistently employs a rigorous quality control and assurance program comprising regular insertion of certified reference standards, blanks and duplicates.