We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ASHTON MINING OF CANADA (ACA) -- Ignore unavailable to you. Want to Upgrade?


To: Famularo who wrote (5292)6/4/1998 12:07:00 PM
From: Jesse  Read Replies (1) | Respond to of 7966
 
K-14 minibulk sampling showed 36cpht-- Note that Ashton's size cutoff was >0.8mm in 2 directions (using a 0.8 mm square sieve).
Ashton K-14 minbulk NR (Nov.11/97):
ashton.net.au

Further mb reports from K-14 including 14B&C 'lobes' yielded results from 2-43cpht: ashton.net.au

In terms of valuation, we have heard of how gem quality stones have consistently been turning up in Ashton's samples, but we must wait for the figures (PUG's Sheldon says 70-75% of the time thus far!).

Realistically, 1,000's of carats are needed to reliably assess value. My guess is we should end up w/ at least $50/ct, likely upwards of $75+ (strictly a guess! -could be lots higher too).

See here for some comparison of pipes around the world (scroll down):
Message 2799606
--------------------
Also, remember this comment I posted after the K-14 minibulk results and subsequent discussions on this thread, as offered by an expert:

To compare a new pipe with established pipes requires a mining "reserve" calculation on the new pipe. Ashton hasn't even calculated a mining "resource" grade yet. So there are two important steps to go. Each step involves a stricter cut-off standard whereby tonnes are dropped to optimize the economics of the orebody. This invariably increases grade. A reasonable rule of thumb is to take the early estimates and cut half the tonnes, that is, exclude the lowest grades.

Going back to the Ashton K-14 news release [Nov.11/97], exclude the pit samples and take the weighted average of the best three and best four holes, then take the average of the two results. This will yield a post-mining reserve cutoff grade of about 0.66cpt. Just a speculative guess so far but I suspect it will prove to be on the low side since the sampling factors during the early stage of diamond exploration tend to skew results strongly to the conservative side.

--------------------

Cheers,
-j
:>
Donald Sheldon's report of Ashton's AB gem quality showings: Message 4038243