We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Formerly About Advanced Micro Devices -- Ignore unavailable to you. Want to Upgrade?


To: Paul Engel who wrote (57605)5/7/1999 3:51:00 PM
From: Process Boy  Read Replies (1) | Respond to of 1571996
 
Paul - " Fab 30 was designed in 1996 with construction starting in the Spring of 1997."

Good point. Every time I read soemthing about F30 being "designed" for Cu processing, I wonder what in the heck they are trying to say. I believe what the mean is that they don't have the resources to transition their whole operation to Cu at one time, so they're doing it in the unfinished building first. This facility and process isn't going to be ready by the time Intel goes to .18, so they have to continue with the Al development in the fab that's up and running. Ex-pen-sive.

I don't know how you design a fab building for Cu. When you transition to Cu, you move some stuff around, move in some Cu equipment, and start processing.



To: Paul Engel who wrote (57605)5/7/1999 4:03:00 PM
From: Kevin K. Spurway  Read Replies (2) | Respond to of 1571996
 
Re: "Where do you get such absolute NONSENSE ?"

Read it some place. I think it has to do with the fact that Cu requires fome sort of special containment for certain process equipment--in which case it's more than possible that the fab was designed anticipating the need for this type of line, even though the actual MOT deal wasn't done yet.

Kevin